Search Documents

  • NIOSH
    OFR-45-84 Evaluation Of Surface Storage Facilities For Explosives, Blasting Agents And Other Explosive Materials

    By J. Roth

    The purpose of the present study is to increase the safety of explosive storage. This was accomplished by: a) review of the histories of recent and past magazine explosions to define causes and trends

    Jan 1, 1983

  • DFI
    Pile Load Test On 1200 Mm Dia Pile In Cemented Soil - Synopsis:

    By B. Ramanathan

    The results of a pile load test on a 1200 mm dia and 25 m long bored Cast-in-situ pile in soft rock is reported. The subsoil has a high N value of above 60 from 7 m to 21 m. The soft rock was observed

    Jan 1, 1996

  • NIOSH
    RI 8682 Failure Analysis of Diesel Exhaust-Gas Water Scrubbers

    By Robert W. Waytulonis

    The Federal Bureau of Mines contacted 29 organizations--mine maintenance departments and equipment manufacturers--concerning service experience and construction of diesel exhaust-gas water scrubbers.

    Jan 1, 1982

  • NIOSH
    OFR-57-82 Undercut And Fill System For Pitching Coal

    By Arnis Mangolds

    A study of the technical and economic feasibility of using a unique undercut and fill system developed by USBM engineers to mine steeply pitching coal is discussed. A brief resource assessment has ind

    Jan 1, 1981

  • AUSIMM
    The Risdon Sulfuric Acid Plant of the Electrolytic Zinc Company of Australasia Limited

    The acid plant consists of the following units: 1. Glover tower. 6. Mills-Packard type chambers. 3. Reaction towers. 6. Gay-Lussac towers.The sulphur dioxide bearing gases, used in the manufacture of

    Jan 1, 1934

  • SME
    Dust Control Considerations For Deep-Cut Faces When Using Exhaust Ventilation and a Flooded-Bed Scrubber - Preprint 97-48

    By R. A. Jankowski

    The U.S. Bureau of Mines (USBM) conducted a series of laboratory tests to investigate the effectiveness of using a flooded-bed scrubber with exhaust ventilation in deep-cut faces of up to 12.2 m in le

    Feb 24, 1997

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Cryogenic Air Supply for Cooling Built-in-Place Refuge Alternatives in Hot Mine Mining, Metallurgy and Exploration - Springer

    By Miguel Reyes, Bruce Whisner, Joseph Bickson, Lincan Yan, David Yantek, Justin Srednicki, Nicholas Damiano, Eric Bauer

    Built-in-place (BIP) refuge alternatives (RAs) are designed to provide a secure space for miners who cannot escape during a mine emergency. Heat and humidity buildup within RAs may expose miners to ph

  • SME
    Miners Remain Upbeat at NWMA Meeting

    By Steve Kral

    As the current boom in the global mining industry rumbles on, mining companies have had to step up their efforts to replace mined reserves. Many of the majors are replacing and adding to their reserv

    Jan 1, 2006

  • NIOSH
    OFR-8-74 Coal Mine Combustion Products Identification And Analysis - 1.0 Abstract And Summary

    By K. L. Paciorek

    The aim of the present study is to determine on a gram per gram basis the toxic products of the thermal oxidative degradations of selected compositions. Four families of materials were investigated un

    Jan 1, 1973

  • NIOSH
    IC 6959 Some Aspects Of Strip Mining Of Bituminous Coal In Central And South Central States ? Introduction

    By Albert L. Toenges

    The production of bituminous coal by stripping methods has become an important factor in some areas, especially in the Central and South Central States. In the latter, production at strip mines exceed

    Jan 1, 1937

  • DFI
    Effects Of Helical Anchor Geometry On Long-Term Performance Of Small Wind Tower Foundations Subject To Dynamic Loads

    By Amy B. Cerato

    The application of this study is to use helical anchors as a foundation system for small wind tower (1 ? 10 kW) guyed cables. Helical anchors are currently used to anchor guyed cables of telecommunic

    Jan 1, 2008

  • SAIMM
    The Application Of Facies Classification In Evaluating The Merensky Reef At Bafokeng Rasimone Platinum Mine, South Africa (fa106342-1594-4fcc-af86-a41634522b7a)

    By M. D. Lionnet

    The Bafokeng Rasimone Platinum Mine (BRPM) is a joint venture between Rustenburg Platinum Mines Limited and Royal Bafokeng Resources (Pty) Ltd (Bafokeng). The mining lease has been granted over Boschk

    Jan 1, 2007

  • DFI
    The Bawang Pile ? A New Type Of Pile ? Synopsis

    By B. Broms

    The "Bawang Pile" (in english "onion" pile) described in the article consists of a cased concrete shaft and an expanded base. The steel casing is first driven by an internal drop hammer and then the b

    Jan 1, 2010

  • AIME
    Professional Divisions (9585aa83-04df-4ba3-9ce6-868b5f673db3)

    [Chairman ZAY JEFFRIES, Vice-chairman S. SKOWRONSKI, Chairman WILLIAM M, CORSE, Secretary Executive Committee J. R. FREEMAN, JR., Local Section G. E. JOHNSON R. S. ARCHER, Non-ferrous Data

    Jan 1, 1928

  • SME
    Laboratory Investigation of the Anisotropic ConfinementDependent Brittle–Ductile Transition of a Utah Coal

    This paper was developed as part of an effort by the National Institute for Occupational Safety and Health (NIOSH) to identify risk factors associated with bumps in the prevention of fatalities and ac

    Jan 7, 2020

  • NIOSH
    OFR-76-77 Investigation Of The Various Factors Affecting The Response Of Passive Configuration Track Etch Dosimeters To Working Level Hour Exposure In Radon And Radon Daughter Atmospheres

    By D. B. Lovett

    The work described in this report was directed toward identifying and devising methods to minimize the previously observed variability between working level hour exposures and the alpha particle track

    Jan 1, 1976

  • AIME
    Rate Of Precipitation Of Nickel Silicide And Cobalt Silicide In The Hardenable Copper-Nickel-Silicon And Copper-Cobalt-Silicon Alloys

    By Curtis Wilson

    FROM the results of his investigation of the hardenable copper-nickel-silicon and copper-cobalt-silicon alloys, M. G. Corson1 explained the dispersion-hardening effect by assuming the precipitation of

    Jan 1, 1933

  • NIOSH
    IC 8866 Ergonomics-Human Factors in Mining - Proceedings: Bureau of Mines Technology Transfer Seminars, Pittsburgh, Pa., December 3, 1981, St. Louis, Mo., December 10, 1981, and Denver, Colo., December 15, 1981

    These proceedings consist of papers presented at three Bureau of Mines Technology Transfer Seminars on ergonomics in the mining industry. These seminars were held in December 1981, and covered topics

    Jan 1, 1981

  • SME
    Water Tunnel in Liaoning Province, Northeast China

    By Li Jiuping, Zhong Gang, Chen Yong Zhang, I. Michael Gowring

    The Liaoning Dahuofang Reservoir Water Transfer Project is an important development for the Department of Water Resources of Liaoning Province in northeastern China. The 85.3 km water conduit will tra

    Jan 1, 2007