Search Documents

  • AUSIMM
    Gas Well Testing in the Roma Area

    Gas well tests were performed on 17 wells in the Roma area. The procedure used in the test programme incorporates an initial isochronal test followed by what is described as the "two flow drawdow

    Jan 1, 1968

  • AUSIMM
    Technical Note-A problem with ventilation network analysis

    This technical note describes a problem with WANG82, a ventilation network analysis programme. The problem was highlighted by Renison Ltd when using the programme on large, complex networks. Under cer

    Jan 1, 1986

  • NIOSH
    IC 8539 Bureau Of Mines Safety Research Center Research And Development Activities: Fiscal Year 1970 ? Introduction

    On July 1, 1969, the Explosives Research Center merged with the Health and Safety Research and Testing Center to form the Safety Research Center, with facilities at Pittsburgh and Bruceton, Pa. Subseq

    Jan 1, 1972

  • CIM
    Mineralogy and characteristics that affect recoveries of metals and trace elements from the ore at Heath Steele Mines, New Brunswick

    By T. T. Chen, W. Petruk

    The mineralogy of the feed, concentrates and tailings from the Heath Steele mill in New Brunswick was studied in detail to determine the liberation and recoveries of the major ore minerals, and to cha

    Jan 1, 1980

  • SME
    The effects of biodiesel fuel and intake air methane on the emissions of a flameproof diesel power package

    By M. Gangal

    CANMET-MMSL, in cooperation with Dry Systems Technologies and Quinsam Mine, conducted a study to determine the effects of B50 biodiesel on the emissions of a flameproof diesel power package in compari

    Jan 1, 2009

  • AIME
    Technical Notes - Substructures in Retained-Beta Phase of Ti-Ni Alloys

    By J. Gordon Parr, D. H. Polonis

    IN a previous study of hypereutectoid Ti-Ni alloys' a substructure was observed in quenched powder specimens when the constitution was 100 pet retained ß body-centered-cubic phase. The alloy powd

    Jan 1, 1957

  • SAIMM
    Process Developments At Tailings Leach Plant

    By Martin Banda, Gift C. Chisakuta, Moses Chabinga

    KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count

    Jan 1, 2005

  • AIME
    Minerals Beneficiation - Recovery of Molybdenum by Liquid-Liquid Extraction from Uranium Mill Circuits

    By J. E. House, C. J. Lewis

    In the solvent extraction process, also referred to as liquid-liquid extraction, the clarified uranium-pregnant sulfuric acid leach solution is contacted with an organic extractant dispersed in kerose

    Jan 1, 1961

  • SAIMM
    How To Leverage Your Bottom Line With Good Drilling And Blasting Practice

    By R. G. Tarr

    During an intense and accurate study of initiation systems used on an AngloGold mine, Mine A, poor drilling practices were revealed. Graphic results of all actual measurements taken are shown below.

    Jan 1, 2000

  • NIOSH
    OFR-1B-87 Assessment Of Whole Body Vibration Levels Of Coal Miners - Volume II: Whole Body Vibration Exposure Of Underground Coal Mining Machine Operators

    By P. J. Remington

    Field measurements utilizing a seat pad accelerometer were made on 25 underground coal mining machines in order to quantify the vibration levels experienced by the operators. Those data were combined

    Jan 1, 1983

  • NIOSH
    RI 9067 - Bolt Anchorage With Gypsum-Plaster Water Capsule Cartridges

    By J. E. Fraley

    Full-column anchored resin bolts were first used in underground mines in 1972. These bolts appear to improve support in many roof bolt applications, as indicated by the use of about 30 million resin b

    Jan 1, 1987

  • SAIMM
    Physical Modelling Of Slag-Metal Dispersion (37ad1f35-f1c2-4487-a9f7-50a53447b856)

    A physical modelling study has been carried out to simulate the slag-metal dispersion induced by a high-strength bottom gas injection. Water and kerosene were utilized to simulate metal and slag respe

    Jan 1, 2004

  • SME
    CFD Modeling Of Air Flow In An Open Pit Mine

    By W. Collingwood

    As open pit mines continue to grow deeper and productivity continues to increase, the management of respirable dust and noxious gases can become a challenge. The natural wind flow in open pit mines i

    Jan 1, 2011

  • AUSIMM
    West Works-Mount Morgan Chlorination

    THE treatment by chlorination of the Mount Morgan Gold Mining Company's ores was first accomplished, early in 1886, by a works having a capacity of 25,000 tons per annum. Shortly afterwards anoth

    Jan 1, 1910

  • NIOSH
    RI 5993 Purification Of Electrolytes For The Deposition Of High-Purity Nickel ? Summary

    By J. G. Donaldson

    Nickel containing less than 0.01 percent of total metallic impurities was produced at the Rolla Metallurgy Research Center of the Bureau of Mines by electrodeposition from purified electrolytes. The f

    Jan 1, 1962

  • CIM
    Improvement of Valuable Mineral Transport and Gangue Drainage in Froth Flotation

    By G. Bartolacci, G. Couture, Levasseur. B., A. Lockhart, D. Nathan

    "Pulp and froth zone characterization in a flotation circuit to improve transport of valuable minerals remains a challenge. Even though some significant breakthroughs have been made in the development

    Jan 1, 2017

  • CIM
    Partial Roasting of Copper Concentrate with Stabilisation of Arsenic and Mercury

    By K. Lundholm, M. Andersson, L. Nevatalo, Å. Holmström, L. Hedström

    "Several copper deposits have the arsenic bearing minerals enargite (Cu3AsS4) and tennantite (Cu12As4S12). Since this mineral contain both arsenic and copper, it is not possible to remove the arsenic

    Jan 1, 2014

  • NIOSH
    OFR-90-80 Factory Integration Of An Illumination System Into A Continuous Mining Machine

    By Bruce Rock

    A continuous mining machine was redesigned for the installation of an integrated illumination system. The illumination system was designed by first calculating the theoretical number of luminaires req

    Jan 1, 1979

  • SME-ICGCM
    Passive Seismic Imaging for Determination of the Longwall Rear Abutment Location

    By Erik Westman

    Few studies have been conducted regarding the location, movement, and relative magnitude of the rear abutment of a longwall coal mine. The rear abutment, or the abutment pressure arch in the gob area,

    Jan 1, 2012

  • CIM
    High Fidelity Simulation of Full Mill Transport and Breakage in SAG/AG and Pebble Mills

    By John A. Herbst, Alexander Potapov, Xiangjun Qiu

    "High Fidelity Simulation is a name applied to the use of first principles modeling tools including Discrete Element Modeling (DEM), Computational Fluid Dynamics (CFD) and Discrete Grain Breakage (DGB

    Jan 1, 2003