Search Documents

  • SME-ICGCM
    Regularities Of Rock Pressure Manifestations In Longwalls In Terms Of The Theory Of Plates And Limit Equilibrium

    By V. M. Shick

    With gentle bedding within the zone of support pressure the delamination in roof rocks may occur only on those stratification planes where cohesiveness of rock is close to zero. Unlike this, at dip an

    Jan 1, 1996

  • NIOSH
    RI 5470 Evaluation Of An Acid-Extraction Method For Determining Mineral Matter In American Coals ? Summary

    By E. C. Tarpley

    An acid-extraction procedure developed in Germany for determining mineral matter in coal was investigated by the Bureau of Mines to determine its application to American coals. It was found to be suit

    Jan 1, 1959

  • AUSIMM
    JumboGuard – automatic boom isolation system

    By J Dwyer, M Hill

    Downer’s mining division has made an operational and financial commitment to developing engineered solutions that mitigate the risks associated with operator proximity to uncontrolled development dril

    Oct 16, 2017

  • NIOSH
    Field Test With Strain-Gauged Friction Bolts At The Gold Hunter Mine, Mullan, Idaho, USA

    By Jeffrey Johnson, Carl Sunderman, Ted Williams, Stephen Signer, Douglas Bayer

    To measure the loading behavior of friction bolts, researchers at the Spokane Research Laboratory of the National Institute for Occupational Safety and Health (NIOSH) installed strain gauges on the in

  • SAIMM
    The Application Of Radar Techniques For In-Mine Feature Mapping In The Bushveld Complex Of South Africa

    By D. Vogt

    A brief summary of the propagation characteristics of rock provides the necessary understanding to design effective radar surveys. Measurements of the electrical properties of the major Bushveld plati

    Jan 1, 2005

  • SME
    Breakthrough Outage at the Second Manapouri Tailrace Tunnel Project, New Zealand

    By Charlie Watts, Ken Smales, Ron Fleming

    The Manapouri Power Station is an underground hydro-electric station located in the South Island of New Zealand, and was constructed in the 1960s. Between 1997and 2002, a second 10m diameter tailrace

    Jan 1, 2007

  • NIOSH
    RI 5973 Heats Of Formation Of Sodium Molybdates And Tungstates ? Introduction And Summary

    By Mary F. Koehler

    Continuing a program of thermochemical investigation of compounds of to ferroalloy elements, this paper contains ins values of the heats of formation of two sodium molybdates (Na2Mo04 and Na2Mo207) an

    Jan 1, 1962

  • SME
    BWARI Tunneling Underway

    By Thomas L. Richardson, David R. Chapman, Gary W. Gilbert

    The two contracts of the Big Walnut Augmentation/Rickenbacker Interceptor(BWARI) sewer project for the City of Columbus, Ohio total nearly 35,000 feet of 14and 12-foot diameter tunnel. EPB TBMs will i

    Jan 1, 2005

  • NIOSH
    IC 8829 Review Of Horizontal Drilling Technology For Methane Drainage From U. S. Coalbeds (b0741061-c213-4132-a7a5-c9bb7f5405e8)

    By Gerald L. Finlinger

    This Bureau of Mines publication reviews underground methane drainage programs being conducted in various coalbeds. Equipment used in drainage programs such as drills, underground pipelines, and metha

    Jan 1, 1980

  • SAIMM
    Annual Report - For The Year Ended 30th June, 1997

    Council for 1996/97 President Dr N.A. Barcza President Elect R.P. Mohring Vice Presidents Senior J.R. Dixon Junior M.H. Rogers Immediate Past President D.A.J. Ross-Watt Honor

    Jan 1, 1997

  • SAIMM
    Management of the Nkomati Mine Crusher Slope Failure

    By R. Armstrong

    Due to limited available level ground, Nkomati Nickel Mine cut a weathered rock slope at the base of a mountain spur in order to create a platform for construction of the primary crusher plant and run

    Jan 1, 2014

  • AUSIMM
    Building the Unified Comminution Model

    Building the Unified Comminution Model The Unified Comminution Model (UCM) was formulated with the vision of bringing all comminution models onto a common base. The structure of the model relies on k

    Sep 13, 2010

  • SME
    Lyon–Turin Long and Deep Railway Tunnel Project

    By P. Fauvel, V. Nasri

    In January 2001, French and Italian governments signed an agreement for the construction of a new Lyon-Turin railway line. This project includes a tunnel of 53.1 km length and a maximum of 2500 m over

    Jan 1, 2005

  • CIM
    The Submarine Coalfield of Sydney, N.S.

    By Sydney C. Mifflen

    COAL MINING, with its some 15,000 employees, is directly responsible for the livelihood of one-fifth of the population of the Province of Nova Scotia and indirectly so for that of possibly another fif

    Jan 1, 1941

  • DFI
    Installation Of Augerpiles In Low Headroom And Restricted Access Conditions

    By Jim Steding

    L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th

    Jan 1, 2003

  • IIMP
    Geofísica minera

    El presente artículo señala los métodos para la exploración geofísica del subsuelo como los gravimétricos y los dinámicos (reflexión y refracción) -en tanto son los más aplicados para la búsqueda de l

    May 1, 1953

  • SME
    Making Headway: All-Tool Carriers And Attachments Are Making An Impact On Advanced Tunneling

    By Peter Bigwood

    Whether drilling through tough clay or breaking rock, or facing the most severe conditions including mixed face ground, perched water and running and flowing sands, working under-ground certainly come

    Jan 1, 2012

  • NIOSH
    RI 9328 - Laboratory Testing of the CSE SR-100 Self-Contained Self-Rescuer for Ruggedness and Reliability

    By N. Kyriazi

    The U.S. Bureau of Mines subjected the CSE SR-lOO self-contained self-rescuer (SCSR) approved by the National Institute for Occupational Safety and Health (NIOSH) and the Mine Safety and Health Admini

    Jan 1, 1990

  • NIOSH
    OFR-1-80 Underground Disposal Of Retorted Oil Shale For The Paraho Retorting Process

    By H. W. Earnest

    This report covers the results of a two-phase study to determine the feasibility of underground disposal of retorted oil shale. Two mining methods, chamber and pillar mining and sublevel stoping, were

    Jan 1, 1978

  • IOM3
    Definition of large-scale zones of hydrothermal alteration by geochemical mapping using organic lake sediment

    By P. H. Davenport, L. W. Nolan

    Paper presented at the 28th International Geological Congress held in Washington DC, July 1989 (International geochemical mapping sessions). Geochemical mapping provides a direct approach to delineati

    Jul 1, 1991