Search Documents

  • CIM
    An integrated approach to modelling, design and optimisation of the flotation plant at the Red Dog concentrator

    By Barun Gorain, Andy Stradling

    "The traditional metallurgical scale-up techniques for flotation plants are based on lumped flotation rate constants, dimensionless hydrodynamic numbers and the use of safety factors. Once the plant h

    Jan 1, 2002

  • SAIMM
    Influence Of Water Resources And Metal Ions On Galena Flotation Of Rosh Pinah Ore

    By G. Coetzer

    During galena flotation of Rosh Pinah milled material, metal ions and salts contents of various water resources (deionized, simulated circulated, lead concentrate thickener, lead tailing thickener and

    Jan 1, 2003

  • ISEE
    The Journal of Explosives Engineering - Vol 21 No 2 - Dynamite Daze

    I had the opportunity recently to visit a magazine site of a major explosives company. It was fun to see the storage areas again and it was really interesting to see one of the old magazines that prob

    Jan 1, 2004

  • SAIMM
    The Balancing Act Of Size Vs. Cost Vs. Practicality

    By Org de Wet

    This paper summarises the strategy for selection between a two module coal plant incorporating large, but less equipment, and a three module coal plant with more but smaller equipment. The two options

    Jan 1, 2006

  • ISEE
    Analysis of Sympathetic Detonation in Detonating Cord

    By Abigail Styer, Paul Holmgren, Josh Calnan

    Detonating cord is a staple of the explosives industry, used widely in the civil and defense industries. Detonating cord is a thin, flexible plastic tube filled with pentaerythritol tetranitrate (PETN

  • AUSIMM
    Mineral Processing Engineering Education in China - Bringing up the Engineering Diathesis and Design Competence of the College Students

    Mineral Processing Engineering Education in China - Bringing up the Engineering Diathesis and Design Competence of the College Students

    Sep 13, 2010

  • AIME
    Introduction To Seminar - Review Of Literature On Pressing Of Metal Powders

    By Richard Paul Seelig

    THE following review covers published information on pressing of metal powders at room temperature. Only those operations are considered which occur between the time the powder is filled into the cavi

    Jan 1, 1947

  • SAIMM
    A Phased Development Schedule For A Platinum Concentrator Utilizing A Dynamic Stockpile Model ? Synopsis

    By J. Labuschagne

    There are a number of factors that contribute to the profitability of a mine and its associated concentrator. Chief among these is the time taken from the first hoist of material from underground to t

    Jan 1, 2013

  • CIM
    Geology and Oxide Mineralization of the Pipestone Lake Anorthosite Complex, Manitoba

    By D. C. Peck, H. D. M. Cameron, N. M. Halden, L. S. Jobin-Bevans

    Abstract-The late Archean Pipestone Lake anorthosite complex (PLAC) is a 0.9 x 17 km sill-like layered intrusion that is part of a suite of coeval megacrystic anorthosite bodies in the Cross Lake regi

    Jan 1, 1997

  • SAIMM
    New Technologies In The Concentration Of PGM Values From UG-2 Ores

    By M. A. W. Bryson

    It is well documented that a significant amount of the new PGM (Platinum Group Minerals) production that is coming on stream now, and over the next few years, is to come from the UG-2 reef. Clearly th

    Jan 1, 2004

  • CIM
    Geology and Mineral Deposits of the Gallinas Mountains REE Deposit, Lincoln and Torrance Counties, New Mexico, USA

    By Virginia T. McLemore

    The Gallinas Mountains are in northern Lincoln County and southern Torrance County, New Mexico, USA where a series of alkaline igneous bodies, including porphyritic latite, trachyte/syenite, andesite,

    May 1, 2011

  • SME
    The Expectations For Coal: Is Our Government And The Coal Industry Prepared?

    By M. S. Miller

    With prevailing assumptions that plentiful domestic coal reserves will be available for meeting our Nation’s expectations for on future low emission, coal-fired power plants, major government funding

    Jan 1, 2004

  • SME
    Emergency Repairs to Beach Interceptor Tunnel

    By David Jurich, Joseph N. McDivitt

    INTRODUCTION South Coast Water District (SCWD) operates the Beach Interceptor Sewer Tunnel(BIST) in South Laguna, Orange County, California between Monarch Beach and Aliso Beach (Figure 1). The 10,

    Jan 1, 2007

  • DFI
    Practical Aspects Of Compensation Grouting ? Synopsis

    By Philip J. H. Ball

    The new application and development of grout jacking processes has combined, over the last decade in particular, to provide a method by which the effects of new underground construction on superficial

    Jan 1, 2000

  • AUSIMM
    High Quality Pig Iron from AusIron Processing

    By Fogarty J. G H

    Ausmelt Technology has a unique capability of removing the impurities, phosphorus and sulphur, from the feed materials to the process. Sulphur is removed to the gas phase almost completely because of

    Jan 1, 1999

  • AUSIMM
    Diamond Drill, Calyx and Hand Boring by the Victorian Mines Department

    Very few of those occupied in pursuits other than mining have any conception of the extent of boring operations that have been carried out on the gold and coal fields of Victoria, or of the valuable a

    Jan 1, 1901

  • AUSIMM
    Tectonic Development of the Gippsland Basin and Environs: Identification of Key Episodes Using Apatite Fission Track Analysis (AFTA)

    By Green P. F

    Apatite Fission Track Analysis (AFTA) is a thermal history reconstruction tool that enables determination of magnitude and timing of maximum paleotemperature and paleo-geothermal gradient at the tim

    Jan 1, 1992

  • SME
    Despite industry woes, 2016 is a big year for the mining equipment sector

    By William Gleason

    "Sluggish prices for commodities and a glut of oversupply of many commodities did not stop the world’s largest mining equipment makers from showing off their latest and greatest machines and technolog

    Jun 1, 2016

  • AUSIMM
    Minimization of Contamination of Mined Ore by Cemented Hydraulic Fill

    A review is made of the limited published experience of the effects of cemented fill in flotation.A general approach is adopted in listing and discussing possible sources of, and reasons for, ore cont

    Jan 1, 1974

  • SME
    New Crystal Springs Bypass (Polhemus) Tunnel—Design Challenges

    By Roy C. Fedotoff, Jon Hurt, Gregg Sherry, Gilbert Tang

    The 1,380 m (4,200 ft) long New Crystal Springs Bypass (Polhemus)Tunnel (NCSBT) will replace the existing Crystal Springs Bypass Pipeline. This tunnel project is part of the SFPUC’s $4.3 billion capit

    Jan 1, 2007