Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Notes on the Working of the MacArthur-Forrest Process for Extracting GoldIn redesigning the cyanide plant at Mount Torrens, in conjunction with Mr. L. W. Grayson, the manager, several minor alterations were introduced in order to have the operations under thorough control,
-
Analysis and Design of Blastwalls to Protect Public Structures From Malevolent ExplosionsBy Dale Preece, Steven Sobolik, Richard Jensen
Recent events demonstrate that civil and government facilities and structures face an ever-increasing need to be designed for protection against malevolent explosions. Modification of existing public
Jan 1, 2000
-
Determination of Optimal Fragmentation Curves for a Surface Diamond MineBy K. M. Phamotse, A. S. Nhleko
"*Paper written on project work carried out in partial fulfilment of BSc (Mining Engineering) degreeSynopsisLiqhobong Mining Development Company (LMDC) has been experiencing problems with boulders aft
Jul 1, 2019
-
The Determination of Gold in Mill Cyanide Solutions by Atomic Absorption SpectroscopyGold was determined directly in eight different mill cyanide solutions, by atomic absorption spectroscopy in an acetylene-air flame. Some of the mill solutions were diluted with water to bring them in
Jan 1, 1964
-
Mine Seismicity and The Comprehensive Nuclear-Test-Ban TreatyMany mining operations generate seismic signals. They come from blasting and from underground mine failures such as rockbursts, longwall first caves, coal bumps and pillar collapses. Traditionally,
Jan 1, 2000
-
New York Subway Stations And Crossover Caverns—Update On Initial Support DesignBy Charles Stone, Hannes Lagger, Dru Desai
The design methodology of the planned Second Avenue Subway Project (SAS) led to development of the initial support design to estimate cost and quantities in the Preliminary Engineering (PE) stage. Car
Jan 1, 2007
-
Budget Estimation and Contingency Allocation of Block Cave Construction Using Least-squares Monte Carlo Real OptionsBy H M. Ahmed, W S. Dunbar
Construction of cave mining systems requires significant capital expenditure and long-term commitment of human, equipment and material resources before production commences. Risks and uncertainties of
May 9, 2016
-
Influence of Direct Aged Treatment on Creep Behaviors of Hot Continuous Rolling GH4169 SuperalloyBy Tian Sugui
By direct aging treated, creep properties measurement and microstructure observation, the influences of the direct aging treatment on the creep behaviors of Hot Continuous Rolled GH4169 superalloy are
Jan 1, 2010
-
Integrated Furnace Controls: Implementation On A Covered-Arc (Shielded Arc) Furnace At Cerro MatosoBy T. Gerritsen, R. C. Delgado, J. Janzen, E. R. Veloza
The paper describes the components of an Integrated Furnace Control system for covered-arc (shielded arc) smelting with results from the recently started 75 MW Cerro Matoso Line 2 Furnace. The paper s
Jan 1, 2004
-
Microcomputer Simulation of Rock Blasting to Predict Fragmentation (e1b89d1b-bf88-4e3c-9f38-0d3739330b7a)By C. Dinis da Cama
In order to reduce the complexity of mechanisms influencing rock- fragmentation by blasting a simulation approach is proposed, using the capabilities of micro-computer interactive graphics. Situat
Jan 1, 1984
-
Unlocking Value through Flotation Equipment MaintenanceBy P. Tolvanen, A. Jalili
"When hard times strike in the mining cycle, sites tighten their belts and focus on lowering their unit costs. Lower unit costs can be achieved by reducing expenditure, increasing production, or by a
Jan 1, 2015
-
CISPM-MS: A Tool to Predict Surface Subsidence and to Study Interactions Associated with Multi?Seam Mining OperationsBy Yi Luo
Multiple-seam mining operations induce surface subsidence basins different from those caused by mining in a single coal seam, and also disturb the mining operations in the other coal seams. A computer
Jan 1, 2012
-
The McArthur Lead-Zinc-Silver DepositBy S Jephcott
The McArthur lead-zinc-silver deposit is of the stratiform type. It consists of a mineralised bituminous shale sequence containing some tuffites, numerous graded beds and isolated slump breccia horizo
Jan 1, 1971
-
Journal: 100 Years / Mining & Scientific Press San Francisco March 18, 1905By Robert Hopler
This article, advocating having employees whose specific job would be to fire blasts in underground coal mines in llinois, was written 5 years prior to the establishment of the U.S. Bureau of Mines,
Jan 1, 2006
-
The Mineralogy and Paragenesis of the Crocidolite Veins at Wittenoom Gorge, W.A.Several factors contributing to the loss of fibre during treatment are a function of the paragenesis of the veins. The occurrence, of magnetite from the cap rock within the veins prevents complete fib
Jan 1, 1963
-
Answer the Opposition - Politics of Coal-based EnergyBy Fredrick D. Palmer
The World is Turning to Coal Peabody?s View ?We believe the world is increasingly energy-short, led by unprecedented demand from population centers and economic hubs in Asia, the Middle East and
Jan 1, 2008
-
An Application of Trend Surface Analysis to the Preparation of Cover Isopach Maps for Coal SeamsConventional hand drawn isopach maps of the cover of the Bulli Seam are too eomplex for use in the delineation of large domains of similar cover. Isopach maps prepared from trend surfaces fitted to th
Jan 1, 1968
-
Bacís Flotation Cell For Gold- And Silver-Beard Pyrite RecoveryBy J. R. Parga
In mineral processing, poor froth-flotation performance translates into both an enormous loss of revenue and an unnecessary waste of the ore reserve. In this context, Bacís Mining Company developed a
Jan 1, 2009
-
UNIMAX SD100 Depressant - A Cyanide ReplacementBy T. Schmidt, J. Merza
"This study considers two lead/zinc/silver orebodies which have historically had a problem with pyrite, pyrrhotite and sphalerite contamination in the lead circuit. The problem was previously addresse
Jan 1, 1992
-
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels ProjectBy Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen
Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project
Jan 1, 2007