Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    Investigations into the Corrosive Environments Contributing to Premature Failure of Australian Coal Mine Rock Bolts

    By Elia Elias, Alan Crosky, Paul Hagan, Damon Vandermaat, Serkan Saydam, Peter H. Craig

    "The University of New South Wales (UNSW Australia) had been involved in the study of premature failure of rock bolts in Australian coal mines from the initial identification of the problem in 1999 (C

    Jan 1, 2015

  • SME-ICGCM
    Study on the Modified Model of Probability Integra Method

    By Zhang Hongzhen

    The fast convergence of boundary is a major problem of probability integral method, especially for the prediction of mining under thick alluvium, abandoned mine goaf, etc. To solve this problem and im

    Jan 1, 2014

  • SME-ICGCM
    Three?Dimensional Ground Stability Study Around a Mine Tunnel in a Highly Discontinuous Rock Mass under Significant in Situ Stress

    By Pinnaduwa H. S. W. Kulatilake

    To exploit an underground mine effectively and safely, it is important to have a good understanding of the geotechnical behavior of the rockmass surrounding the underground mine excavation. The aim of

    Jan 1, 2013

  • SME-ICGCM
    Merging Coal Mine Geologic Hazard Mapping with Mine Production Rates—Industry Experience

    By Kevin Andrews, Scott Nelson, Terry Hamrick

    "In the process of Geologic Hazard Mapping (GHM) for underground coal mining, geologists evaluate the effects of various geologic and geotechnical conditions to assist with optimization of mine produc

    Jan 1, 2018

  • SME-ICGCM
    Barrier Pillar Design for Safe and Productive Longwall Mining

    By Stephen C. Tadolini

    Effective barrier pillar design is an essential component for safe and productive underground coal mining. Barrier pillar design methodologies that incorporate sound engineering judgment have been use

    Jan 1, 2013

  • SME-ICGCM
    Changes in Stress and Displacement Caused by Longwall Panel Retreats

    By Ihsan B. Tulu, David F. Gearhart, Gabriel S. Esterhuizen

    "Ground deformation and support response was monitored in a longwall gateroad as part of a research project into gateroad stability under changing loading conditions. In this study, instrumentation wa

    Jan 1, 2017

  • SME-ICGCM
    Energy Concepts in the Analysis of Unstable Coal Pillar Failures

    By Eric C. Poeck, Ryan Garvey, Ugur Ozbay, Kun Zhang

    "A coal bump is characterized by the sudden failure of one or more pillars and an associated release of kinetic energy. Although the geologic conditions surrounding coal bumps are often similar, their

    Jan 1, 2015

  • SME-ICGCM
    Deformation Mechanism and Floor Heave Control Technology in Deep? Buried Full Seam Chamber

    By Xicai Gao

    With the intensification and expansion of deep coal mining, the surrounding rock stress environment becomes further deteriorated because of the complicated geological environment and powerful mining e

    Jan 1, 2013

  • SME-ICGCM
    Evaluating the Risk of Coal Bursts in Underground Coal Mines

    By Michael Gauna, Christopher Mark

    "Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are almost always accompanied by a loud noise, like an explosion, and ground vibration. Bursts are a part

    Jan 1, 2015

  • SME-ICGCM
    Three Dimensional Modeling of a Surface Displacements As a Result of an Underground Longwall Panel Extraction

    By Anton Sroka, Antoni Tajdus, Axel Preusse, Krzysztof Tajdus

    "In Europe, the magnitude and range of mining deformation predicted on the surface have been, in most cases, determined using methods based on Gauss' influence function (e.g., Knothe's theory, Ruhrkoh

    Jan 1, 2010

  • SME-ICGCM
    Challenges of Mining the First Right-Handed Longwall Panel in a New Reserve Block in Pittsburgh Seam

    By Jun Lu, Greg Hasenfus

    "In this paper, the mining experience and challenges for the first right-handed longwall panel in the Pittsburgh seam are introduced. The longwall headgate T-junction experienced very high face conver

    Jan 1, 2018

  • SME-ICGCM
    User-Friendly Finite Element Design of Main Entries, Barrier Pillars, and Bleeder Entries

    By William G. Pariseau, Mark K. Larson, Douglas R. Tesarik, Heather E. Lawson

    "This contribution describes development and application of a user-friendly finite element program, UT3PC, to address three important problems in underground coal mine design: (1) safety of main entri

    Jan 1, 2017

  • SME-ICGCM
    Study on the Top Caving Mining Technology in Thick Coal Seam beneath the Earth-Rock Dam and Its Influence

    By Wenbing Guo, Yi Tan, Erhu Bai

    "It is important to study the mining technology under structures for raising the coal resources recovery ratio. Based on the geological and mining conditions, the top coal caving harmonic mining techn

    Jan 1, 2016

  • SME-ICGCM
    Determination Of Classification Parameters For Clay - Bearing And Stratified Rock Mass

    By Erdal Unal

    In underground mining today, safety and economical aspects demand a better understanding of the rock-mass conditions, particularly for design of underground mine openings excavated in weak and stratif

    Jan 1, 1990

  • SME-ICGCM
    Monitoring Consolidation Settlement Deformation in Deep Borehole of Unconsolidated Strata USing Fiber Bragg Grating Sensing

    By Liang Dong, Jinxuan Liu, Biao Qiu, Jing Chai

    "The Cenozoic unconsolidated strata in the east area of China are composed of clay, sandy clay, fine sand, hardpan, etc. Numerous shafts of the coal mines in these areas have been damaged in various d

    Jan 1, 2010

  • SME-ICGCM
    The Relationship between Ultrasonic Velocities and Mechanical Damage in Sandstone under Cyclic Loading

    By Hongwei Zhang, Sen Yang, Shimin Liu

    "This laboratory study investigates the damage evolution of sandstone specimens under two types of cyclic loading conditions through monitoring and analyzing the variations of elastic moduli and ultra

    Jan 1, 2017

  • SME-ICGCM
    RQD from the Barrel to the Box: Weatherability May be a Better indicator for Roof Support Design

    By Kot Unrug

    For the purposes of underground mine design, twelve cores of the Springfield (V) Coal (Pennsylvanian) roof and floor were retrieved. Each core was photographed, described fresh in the barrel, and the

    Jan 1, 2003

  • SME-ICGCM
    Challenges of Room and Pillar Mining at 900 M Depths in the Czech Republic

    By William J. Schloemer

    INTRODUCTION The history of coal mining the Ostrava Region of the Czech Republic goes back nearly 250 years. Both coking coal for steelmaking and thermal coal for the production of energy are mined h

    Jan 1, 2014

  • SME-ICGCM
    Prediction Of Subsurface Subsidence For Longwall Mining Operations

    By Yi Luo

    Subsurface strata movements and deformations associated with underground mining activities could cause problems to subsurface structures and water bodies. By incorporating the methods for surface subs

    Jan 1, 2000

  • SME-ICGCM
    Mechanism and Prediction of Ground Surface Subsidence Due to Multiple-Seam Longwall Mining

    By Gang Ren, Behrooz Ghabraie

    "Observational data suggest that the ground surface subsidence profile from multiple-seam longwall mining is rather different from that of single seam. Despite the increase of coal production from mul

    Jan 1, 2016