Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Response Of A High Order Stream To Shallow Cover Longwall Mining In The Northern Appalachian Coalfield

    By John A. Owsiany

    The effect of longwall mining on streams and shallow aquifers has been the subject of numerous research studies for more than twenty years. As a result of these studies, it has become common to consid

    Jan 1, 2001

  • SME-ICGCM
    Investigating Abutment Load

    By Ihsan Berk Tulu

    In the Analysis of Retreat Mining Pillar Stability (ARMPS) program, the magnitude of the abutment loading adjacent to a gob area is calculated using an ?abutment angle? concept. The extent of the abut

    Jan 1, 2012

  • SME-ICGCM
    Engineering Classification of Shales

    By Robert A. Siokler

    Approximately 75 percentage of the earth's land surface is comprised of shale or shale-like materials. Shale itself is composed of the residue from an almost infinite variety of weathered parent

    Jan 1, 1986

  • SME-ICGCM
    DEPOWS - A Powered Support Selection Model

    By Y. M. Jiang

    A users friendly PC Computer Program has been developed to implement a systematic design of the powered support. The required input data are: (1) thickness, RQD, and compressive strength of the immedi

    Jan 1, 1989

  • SME-ICGCM
    Prevention Of Time-Dependent Subsidence By Elimination Of Ground Movement Over An Abandoned Mine

    By V. V. Nazimko

    Abandoned coal mines cause subsidence and structural damages. Shallow abandoned mines induce the most severe and harmful damages. In addition, they produce time-dependent subsidence which is difficult

    Jan 1, 1999

  • SME-ICGCM
    Large Scale Ground Instability Caused By Failure of Underlying Pillars: A Case Study of Dynamic Multiple Seam Interaction

    By Christopher Mark

    Severe dynamic multiple seam interactions can occur when active mine workings are subsided by underlying mining activity. The most dramatic events are usually caused by longwall mining or pillar recov

    Jan 1, 2012

  • SME-ICGCM
    Realistic Design Of Ground Control Based On Geotechnical Data Obtained During Mine Development

    By Kot F. Unrug

    In the premining stage of engineering design, the only available data are obtained from core drilling. It is often not sufficient for a realistic design of strata control. During the development, an a

    Jan 1, 1994

  • SME-ICGCM
    Transitional Geology and Its Effects on Development and Longwall Mining in Pittsburgh Seam

    By Jun Lu, Mark Van Dyke, Daniel W. H. Su, Greg Hasenfus

    "This paper presents the geologic and ground control challenges that were encountered by CONSOL Energy’s mining operations in southwestern Pennsylvania. A sandstone-to-limestone geology transition was

    Jan 1, 2015

  • SME-ICGCM
    Design And Backfill Installation Considerations For Cut-And-Cover Coal Mine Slope Entry Using Steel Supports And Lagging (5aeac579-3675-40a9-b37e-6b4c5af947be)

    By Larry DeGraff

    With the increase of new mine development in the past several years, many coal mines have decided to self- perform the design and construction for their slope development projects. The development pr

    Jan 1, 2009

  • SME-ICGCM
    Trail Mountain Mine: A Case Study For Improving Locations Of Mining-Induced Seismicity With Double-Difference Relocation (2de3a4ff-91be-4a02-947a-fc4fd7ffaac8)

    By Eleanor Sonley

    In October 2000, temporary seismographic stations were installed above the Trail Mountain Mine, Emery County, Utah, USA to supplement a regional network. Over seven months, 1826 mining-induced seismi

    Jan 1, 2009

  • SME-ICGCM
    Coal Mine Burst Prevention Controls

    By Anthony Iannacchione

    Coal mine bursts have represented a major hazard for U.S. mining operations for more than 90 years. During this time, many prevention controls have been developed and tested. This paper reviews 11 p

    Jan 1, 2008

  • SME-ICGCM
    Weightings And Water Inflows During Longwall Working

    By I. W. Farmer

    Weightings and water inflows into longwall workings often occur together, giving rise to discussions on their relative genesis. Case histories are introduced which indicate that most water inflows are

    Jan 1, 1996

  • SME-ICGCM
    The Use Of Rim- To Detect Geologic Anomalies In The Clarion Seam

    By M. Craig Miller

    As the trend continues in the U. S. toward inceased capital investment in longwall mining equipment and wider panels. the risk also increases for gotential financial and production loses due to undete

    Jan 1, 1990

  • SME-ICGCM
    Roof Stability Issues in Underground Limestone Mines in the United States (c7025d3b-53e9-40eb-abd5-d6a28b7f51f3)

    By Gabriel Esterhuizen

    The room-and-pillar mining method is used extensively in underground limestone mines in the Eastern and Midwestern U.S. The rock mass is typically a near-horizontal, bedded deposit at relatively shal

    Jan 1, 2007

  • SME-ICGCM
    Monitoring Coal Mine Seismicity with an Automated Wireless Digital Strong-Motion Network

    By Peter Swanson

    A seismic monitoring network has been installed in western Colorado (USA) in the vicinity of three underground coal mines to (i) distinguish and characterize seismic activity as either mining related

    Jan 1, 2008

  • SME-ICGCM
    An analysis of roof-pillar-weak floor interaction in partial extraction room-and-pillar mining

    By W. M. Pytel

    The applicability of the beam theory in analysis of roof- pillar-weak floor interaction in partial extraction room-and-pillar mining is presented. The mine structure is modeled as an equivalent multi-

    Jan 1, 1989

  • SME-ICGCM
    Subsidence monitoring at a shallow partial extraction room-and-pillar mine in midwestem United State

    By Yoginder P. Chugh

    Subsidence may be observed above partial extraction shallow room-and-pillar mines where the coal seam(s) is associated with weak and thick claystone in the floor. This paper presents results of subsid

    Jan 1, 1989

  • SME-ICGCM
    Pillar Design Considering the Plastic Behavior of the Coal Seam

    By Andre Zingano

    The variation in pillar behavior at underground coal mines working in the Bonito coal seam is observed in both research and mining company case studies. There is no consistency in pillar behavior, as

    Jan 1, 2012

  • SME-ICGCM
    Improved Intersection Design And Monitoring In The Sydney Coalfield

    By G. R. Corbett

    The introduction of roof bolts to Phalen Colliery in the Sydney Coalfield, Nova Scotia (annual output of 2Mt) has been successfully implemented in maingate and tailgate entries over the last four year

    Jan 1, 1995

  • SME-ICGCM
    Monitoring Mobile Roof Supports

    By Kenneth E. Hay

    Researchers from the U.S. Bureau of Mines conducted a field study to assess the safety of remotely controlled mobile roof supports (MRS) in a retreat pillar mining operation, Data were collected to pr

    Jan 1, 1995