Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
The Utilization Of Coarse Pre-Concentration Rejects In The Preparation Of Underground Backfills At Xstrata Nickel?s Ontario OperationsBy T. Weatherwax
As part of a strategic research initiative at UBC to design and evaluate integrated underground mining and mineral processing systems, work has been done to determine how to utilize the coarse rejects
Jan 1, 2008
-
Geological domaining with unsupervised clustering and ensemble support vector classificationBy Kasimcan Koruk, Julian M. Ortiz
A geological model accounting for uncertainties possesses important advantages for resource estimation. Machine learning algorithms (MLAs) employed on multivariate geochemical datasets open up ways to
Mar 1, 2024
-
Ground Freezing for Boston Central Artery Contract Section C09A4, Jacking of Tunnel BoxesBy Paul C. Schmall, John F. Donohoe, Arthur B. Corwin, Derek Maishman
Ground freezing was utilized to provide complete stability of the excavation face and complete groundwater cut-off for the jacking of the three tunnel boxes for the Interstate 90 / Interstate 93 appro
Jan 1, 2001
-
Update On Deployment Of Gamma Radiation Controls For Surface CoalBy L. Frederick
Measurement of gamma radiation occurring in nature to characterize geological formations has been widely recognized in mineral exploration. Different methods and apparatuses have been developed for dr
Feb 27, 2013
-
Islais Creek Contract E: Tunneling Through Jet Grouted Bay MudBy D. N. Adams, M. M. Wong, M. J. Robison
Islais Creek Contract E, a transport/storage tunnel in San Francisco, was visited on a fieldtrip during construction by delegates to the 1995 RETC. This paper is a follow-up to that fieldtrip. The p
Jan 1, 1997
-
Regrind Mills: Scaleup Or ScrewupAs ore deposits become finer grained the requirements for regrinding before cleaning or leaching have increased substantially. Despite this increasing need, there is no standard test to predict grind
Jan 1, 2011
-
De Beers, Sandvik Team Up On Underground AutomationDe Beers? Finsch diamond mine began operation in the 1960s as a surface project using the latest technology available. During the 1990s, the operation, located about 160 km (100 miles) west of Kimber
Jan 1, 2008
-
The Role Of The MMAJ And The Activities Of The Japanese Mining Industry In Global Resources DevelopmentBy H. Ikeda
INTRODUCTION [Slide 1] The Role of the MMAJ Ladies & Gentlemen, it is a pleasure for me to be able to make a speech at this SME annual meeting, representing the Metal Mining Agency of Japan.
Jan 1, 2001
-
Improvements in Plant Scale Nitric-Sulfuric Acid Pressure Leaching of Refractory Sulfide concentratesBy Corby G. Anderson
Since 1985, the Sunshine Mining Company has used a patented nitric-sulfuric acid pressure leaching system for production of silver and copper from a refractory sulfide ore body. To better understand t
Jan 1, 1991
-
Environmental Health and SafetyBy Raja V. Ramani
Discussion in this section of the Handbook is limited to the working environment of miners, the mine workers themselves, and the machines used in mining (Fig. 11.0.1). The contents emphasize personnel
Jan 1, 2008
-
Kennecott Utah Copper Smelter ModernizationBy C. J. Newman
Before 1995, the smelting process at the Kennecott Utah Copper Corp. (KUCC) smelter consisted of Noranda reactors and Pierce-Smith converters. When considering expansion, it was decided that the exis
Jan 1, 1999
-
Effective Planning Of Underground Space?Planning And Implementation Of The First Underground Water Reservoirs In Hong KongBy T. H. Chan
As the University of Hong Kong and their advisors planned their new Centennial Campus it became clear that they would have to re-provide existing water reservoirs on an adjacent site with new salt wat
-
EPB Tunnel Boring Machine Design For Boulder ConditionsBy Craig Bournes, David Chapman, Michael DiPonio
Historically, boulders are a frequent source of problems in soft ground tunneling. During tunnel construction, the need to manually break and remove boulders as obstructions causes delays to the proje
Jan 1, 2007
-
Tunneling Under Glaciers Galore Creek Mine Access Tunnel, BC, CanadaBy Dean Brox, Jason Morrison, Peter Procter
The Galore Creek Mine project is one of the newest major mining projects underdevelopment in Canada. The project is located in a very remote area of northwester British Columbia and is being developed
Jan 1, 2007
-
Deep sea mining: from exploration to exploitationBy Laurens de Jonge, Wiebe Boomsma, Rodney Norman, Stanislav Verichev
"Earth provides natural resources, such as fossil fuels and minerals that are vital for human life. As the global demand grows, especially for strategic minerals, commodity prices rapidly rise. Thus t
Sep 1, 2014
-
Reliability of Conventional Ground SupportBy Davorin Kolic, Harald Wagner
Conventional ground support in accordance with latest state-of-the-art considers proper preparation of geotechnical investigation, structural design, observation during construction and fair risk shar
Jan 1, 2001
-
The 1990’s – Politics and the EnvironmentBy Georgene Renner
At the beginning of the 1990s, Communism fell and signaled the end of the Cold War. The world rejoiced but also watched and waited to see how those countries would restructure themselves. The 1990
Jan 1, 2007
-
Technology For Community Development in Central AsiaBy Morris T. Worley
Editor’s note: Mining companies doing business in Central Asia, and parts of the developing world, should look for ways to promote community development through the introduction of appropriate technol
Jan 1, 2005
-
The Relationship Between Tunnel Convergence and Machine Operational Parameters and Chip Size for Double Shield TBMs— A Case History of Ghomroud Water Conveyance TunnelBy Jamal Rostami, Ebrahim Farrokh
Selection of tunneling method, specially the use of shielded machines for application in deep rock tunnels can be heavily impacted by presence of ground convergence and squeezing conditions. Tunnel co
Jan 1, 2007
-
Alaska Way visit highlights Megaprojects conference in SeattleWhen defining a ?megaproject,? one need only to look at Seattle, WA?s State Route 99 Alaskan Way Viaduct replacement project. This $3.1-billion project is one of the largest of its kind in the world,
Dec 1, 2013