Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Results Of Instrumentation And Observation Of A Tunnel In Bedded Rock With High Residual (In Situ) StressesBy John D. Morton, J. H. LaVerne Palmer, Douglas J. Belshaw
An extensive programme of ground instrumentation and observation was carried out for the West Duff in Outfall Sewer tunnel project prior to and during construction, to establish the performance charac
Jan 1, 1979
-
Face Stabilisation in Closed Shield TunnellingBy K. Kovári, G. Anagnostou
Slurry and EPB-shield tunnelling have been successfully applied worldwide in recent years. Under extremely unfavourable geological conditions, however, face instabilities may occur. The present paper
Jan 1, 1997
-
Quantifying Relationships Between Subsidence and Longwall Face Advance Using DInSARSurface subsidence that results from longwall mining can be large magnitude and can affect significant areas. Conventional methods for subsidence monitoring include leveling, global positioning system
Jan 7, 2020
-
Earthquake Engineering Of Tunnels - RevisitedBy G. Norman Owen, Roger E. Scholl
INTRODUCTION The analysis and design of underground structures to resist vibratory motion due to earthquakes has been of interest to engineers for several decades. The dynamic stability of a powerh
Jan 1, 1985
-
Analysis Of Failure Modes For Fully Grouted Resin BoltsBy K. Heasley, A. Yassien, A. Khair, S. Peng
There are three major components of a fully grouted roof bolt which primarily determine its ability to develop and sustain load: the steel rebar, the resin annulus, and the rock/grout interface. The u
Jan 1, 2004
-
Polysulfides As An Alternative Green Gold Leaching Technology - Preprint 09-103By D. Earley
High metal prices and new world trade standards and accounting for environmental liability in financial disclosures are creating markets for metals commodities that are produced using ?green technolog
Jan 1, 2009
-
In-Mine Study Of High-Expansion Firefighting Foam - Preprint 09-095By L. L. Chasko
A mine fire is one of the most challenging safety issues facing a mine operator and can occur at any location underground. The National Institute for Occupational Safety and Health (NIOSH) and the Tw
Jan 1, 2009
-
Onsite Assembly And HARD Rock Tunneling At The Jinping-II Hydropower Station Power Tunnel ProjectBy Stephen M. Smading
Unique onsite assembly of a 12.43 m Main Beam TBM and back-up system was completed on September 18, 2008 in the remote mountains of the Sichuan province of China. The equipment was assembled onsite, w
-
The Athabasca Tar Sands - Developments To Date, And The Outlook For The Future ? IntroductionBy L. B. McConville
The general term "tar sand" has been used to describe sand containing varying amounts of dense, viscous petroleum. Deposits of tar sands have been found throughout the world, often in the same geograp
Jan 1, 1974
-
Characterization Of Goldstrike Ore Carbonaceous MatterBy J. F. Stenebråten, W. P. Johnson, D. R. Brosnahan
Carbonaceous material (CM) from ores of varying preg-robbing activity from Barrick Goldstrike Mines Inc. (BGMI), Nevada, was characterized in terms of its functional group content, hydrocarbon content
Jan 1, 1999
-
InterludeIf it had not been for the almost unbelievable adventures that came before and after, the last ten months of 19 15 would have been exciting enough for anyone. As it was they were a cheerful interlude.
Jan 1, 1976
-
Application Of The Split-Online Sag Feed Size Analyzer At P.T. Freeport IndonesiaBy A. Supomo, A. Partanen, M. Mular
Although many SAG operators may agree that on-line measurement of SAG feed-size is an attractive notion, applying this information in a control strategy that recovers the investment, engineering time,
Jan 1, 2001
-
Technical Innovations And Advances Make Wirtgen Surface Miner A Viable Alternative To Traditional Drill And Blast / Ripping OperationsBy R. Bauer
Adaptations and redesign of the existing already very successful and proven road milling machine concept and technical innovations such as an optimized, specifically for mining application developed c
Jan 1, 2007
-
Industrial Minerals 1995The United States continued to depend on imported bauxite during 1995. Domestic bauxite mine production remained at about the same level as in 1994. It amounted to less than 1% of total world produc
Jan 1, 1996
-
Some Impressions And Observations Of Soviet Coal Mining Industry By United States Delegation During Visit To USSR Under The 1972/73 Scientific Exchanges Agreement ? BackgroundBy Joseph J. Yancik
An exchange of coal mine specialists was made with the USSR under an "Agreement on Exchanges and Cooperation in Scientific, Technical, Cultural, and other Fields for 1972-73," which was signed by Pres
Jan 1, 1974
-
Pump And Cyclone Design/Optimization To Maximize Grinding Circuit EfficiencyThe design/optimization of the pump and cyclones to maximize grinding circuit efficiency first requires a concise understanding of, and clearly defined specifications for, desired grinding circuit per
Jan 1, 2011
-
Cable-Shovel Dipper DynamicsBy M. A. Raza
Cable shovels are capital-expensive and primary production equipment in many surface mines. The forces acting on the shovel dipper vary as the dipper moves through the muck-pile. The variations in the
Jan 1, 2011
-
The Implementation Of Blast Hole Kriging On Personal ComputerBy Y. C. Kim
This paper describes the implementation aspect of a blast hole kriging system which has been developed for the purpose of daily ore-waste control in an open pit mine. The primary goal of blast hole kr
Jan 1, 1990
-
Problem of Tunnel Construction in Himalayan Region: An Actual EncounterBy M. D. Khattar
Problems discussed concern encountering of high temperatures [up to 66°C] and heavy flow of water [150 L.P.S] during the construction of the 10.15 MØH.R.T. for the 2500 MW Nathpa Jhakri Hydro Power Pr
Jan 1, 1999
-
Construction Of Shin-Kanmon Tunnel On Sanyo ShinkansenBy Kazuo Magata, Hirohiko Fujita, Masazumi Tashiro, Yoshiaki Sato, Yoshio Shinoda
The Shinkansen of the Japanese National Railways (JNR) presently in operation between Tokyo and Hakata, approximately 1,000 km, was constructed at three stages: between Tokyo and Shin-Osaka opening in
Jan 1, 1976