    Determination Of Pile Lengths Under Existing Structures

    By Mohamad Hussein

    Low strain dynamic tests are performed to evaluate the structural integrity of driven or cast-in-place concrete piles. This type of testing requires minimal pile preparation, and is simply performed b

    Jan 1, 1992

  • DFI
    Instrumented Rock-Socketed Drilled Piers Hamilton General Hospital ? Introduction

    By R. G. Horvath

    In the Hamilton area, and in many other areas of Ontario and around the world, large diameter drilled pier (caisson) foundations are frequently selected as the most appropriate foundation system for h

    Jan 1, 1987

  • DFI
    Problems Encountered For Deep Caissons For The Second Bassein Creek Bridge At Mumbai, India

    By Deepak B. Deshpande

    This paper enumerates various difficulties encountered in the design and construction of deep caisson foundations for the Second Bassein Creek Bridge constructed over a creek with very difficult site

    Jan 1, 2002

  • DFI
    Rigid Inclusions For Soil Improvement In A 76 Building Complex

    By Walter I. Paniagua

    A housing complex of 76 buildings is being constructed in the city of Morelia, in western central Mexico; the buildings are 5 levels high, with a shallow concrete slab foundation. Soil conditions incl

    Jan 1, 2008

  • DFI
    Evaluating Excavation Support Systems To Protect Adjacent Structures (The 2010 Michael W. O?Neill Lecture)

    By Richard J. Finno

    This paper presents an overview of methods that can be used to predict damage to buildings as a result of excavation-induced ground movements and describes an adaptive management approach for predicti

    Jan 1, 2010

  • DFI
    Structural Underpinning By Pinpiles

    By D. A. Bruce

    Small diameter cast-in-place bored piles (pinpiles) have been installed throughout the world since 1952, but only more recently in the United States. The special features of their construction and per

    Jan 1, 1992

  • DFI
    Practical Soil Nail Wall Design And Constructability Issues

    By Walter G. Kutschke

    Four significant soil nail wall projects in the eastern United States were recently completed with a combined area of 175,000 square feet of finished shotcrete surface. These projects required the us

    Jan 1, 2007

  • DFI
    Resolution Of Prestressed Concrete Pile Splice Problems - Summary

    By David Siu

    Many problems were encountered with the mechanical wedge-type splices used for the 15-inch square precast prestressed concrete piles installed at an industrial plant site. Many of the wedges were brea

    Jan 1, 1991

  • DFI
    Capitol Area East End Complex Blocks 171 Through 174 Sacramento, California: A Case History Involving The Application Of APGD And APG Piling Methods ? Introduction

    By Brian R. Zuckerman

    The Capitol Area East End Complex is currently being constructed under contract with the State of California Department of General Services on two sites adjacent to the grounds of the California State

    Jan 1, 2002

  • DFI
    Bacteria Help Civil Engineers; Report Of A Pilot Project

    By John W. M. Lambert

    This paper describes the execution and the results of a new method to seal off leaks in water retaining constructions. The new method, called BioSealing is based on activating the bacteries, present i

    Jan 1, 2006

  • DFI
    Economic and Safe Design and the Execution Standards for the Construction Phase of Deep Foundation Systems in Difficult Soil Conditions

    By Seffen Leppla, Rolf Katzenbach, Matthias Seip

    "Abstract The economic and safe design of deep foundation systems in difficult soil conditions is based on a reduction of construction material used, construction time spent, energy consumed and a hig

    Jan 1, 2014

  • DFI
    An Explosive Waterproofing Of A Riverbank - A Difficult Waterproofing Problem Solved By The Unique And Controversial Combination Of A Mining Technique (Blasting) And A Soil Improvement Technique (Jet-Grouting) - The Problem

    By M. Zanotto

    [ ] A period of heavy rains caused the river Adda to flood parts of the Valtellina, one of the Alpine valleys of Northern Italy. The exceptionally high waters put under considerable strain the whole

    Jan 1, 1992

  • DFI
    Estimation of Shaft and Base Responses from Pile Load Test

    By Vidyaranya Bandi, Madhav Madhira, Kota Vijay Kiran

    "Using hyperbolic relationships for the non-linear responses of shaft and base resistances, a method is proposed for estimating initial shaft and base stiffnesses and ultimate shaft and base resistanc

    Jan 1, 2017

  • DFI
    Stub Pier Stabilization Performance

    By Swaminathan Srinivasan, Jess A. Schroeder

    "Landslide activity along U.S. 50 in Cincinnati, Ohio (USA) has caused roadway damage for decades. After a necessary closure of three lanes due to slope movements, emergency stabilization measures wer

    Jan 1, 2017

  • DFI
    Overcoming the Challenges Endured by the Quality Assurance and Quality Control Teams during the Construction of a Deep Cutoff Wall in East Alton, Illinois

    By Raffaella Granata, Wesley Schmutzler, Matteo Bertoni

    "The Lower Wood River Levee system, at the confluence of the Wood River Creek and the Mississippi River, in East Alton, Illinois, has been plagued with underground seepage and, in 2010, remediation wa

    Jan 1, 2017

  • DFI
    Minipiles And Postgrouted Bored Piles - Two Techniques For Special Site Conditions - Summary:

    By Stefan K. Schwank

    The paper describes the two foundation techniques - mini piles and postgrouted bored piles. The mini pile system is presented with its design and installation parameters, especially the drilling techn

    Jan 1, 1991

  • DFI
    Update Of Aashto Standard Specifications For Highway Bridges: Division II--Construction - Preliminary Draft Final Report Vol. II - Specifications And Commentary - Driven Foundation Piles - 4.1 Description

    This work shall consist of furnishing and driving foundation piles of the type and dimensions designated on the plans or in the special provisions including cutting off or building up foundation piles

    Jan 1, 1989

  • DFI
    Methods Of Constructing Concrete Piles On Heavily Contaminated Sites

    By N. C. Matheson

    The West's Shell Pile has been used on sites with very soft ground conditions for over 60 years. Fibre reinforced precast concrete shells 900mm long are threadled onto an internal mandrel which c

    Jan 1, 1989

  • DFI
    Use Of And Design Parameters For High Capacity Foundation Elements In Boston Bedrock - Introduction

    By Mark X. Haley

    Foundation design and construction in Boston has changed dramatically during the past 10 years. Prior to 1985, the primary foundation element in Boston, where deep foundations are required, was driven

    Jan 1, 1994

  • DFI
    Soldier Pile Installation Light Rail Rapid Transit Buffalo, New York - Project Description

    By Daniel J. Rider

    In 1980 the Niagara Frontier Transportation Authority contracted for three miles of cut and cover box structure and station construction in Main Street, Buffalo, New York. Project depths ranged from