Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • SME-ICGCM
    The Technical Progress and Problems to Be Solved of Thick Coal Seam Mining in China

    By Jiacheng Wang

    The current state of thick seam coal mining methods is illustrated in three typical cases of thick seam longwall mining, each pointing out the outstanding achievements in top-coal caving mining and la

    Jan 1, 2011

  • SME-ICGCM
    A New Rock Bolting Concept For Underground Roadways

    By G. Skybey

    The Skybolt is a new bolt concept, point anchored with resin in large diameter holes of specific sizes 38 mm and 45 mm. The new design achieves the optimum annular spacing required for mixing the resi

    Jan 1, 1992

  • SME-ICGCM
    Geomechanical Substantiation Of Extraction Of Undermined Ore Deposit

    By M. V. Kurlenya

    The experience of application of geomechanical investigations for substantiation of extraction of undermined ore deposit in the north of Siberia is discussed. The finite element method was used for fo

    Jan 1, 1990

  • SME-ICGCM
    Mining-Induced Stress Measurement With Hydraulic Borerole Pressure Cells

    By Paul A. Lu

    This paper proposes an unconventional, simple, and practical method of measuring mining-induced around stresses with hydraulic borehole pressure cells. The method is a direct ground stress measuring t

    Jan 1, 1984

  • SME-ICGCM
    A Design Approach For A Swelling Rock In An Underground Mine In Türkîye

    By A. G. Pasamehmetoglu

    The swelling process is an important problem causing damages to the structures in or on swelling rocks, both during construction and operating life. To understand swelling problem, a number of testing

    Jan 1, 1992

  • SME-ICGCM
    Mapping and Application of Roof Joint Patterns for Ground Control inAn Illinois Mine

    By Kenny D. Basnett

    An analysis of the Roof Falls Data Base (RFDB) for underground coal mines in Illinois for the period 2004?2008 indicated that about 80% of the roof falls occur at intersections and are associated with

    Jan 1, 2011

  • SME-ICGCM
    Application Of Sliding Roof Bar Powered Support For Thick-Seam Coal Mining

    By Zhang Liandong

    Roof control in thick-seam mining has long been a difficult problem in mine design and coal mining. In the early 1980's, through ground control instrumentation and investigation the rules of r

    Jan 1, 1990

  • SME-ICGCM
    The Search For A Method To Provide Warning Of Coal And Gas Outbursts

    By Fred Leighton

    Outbursts, or the sudden and sometimes catastrophic expulsion of coal and gas into the working area of a coal mine, are a little understood and growing problem. The AE/MS (Acoustic Emission/Microseism

    Jan 1, 1982

  • SME-ICGCM
    The Rheological Fracture Properties And Outburst Mechanism Of Coal Containing Gas (d683aa0b-ccc6-4082-b59a-667b798b544c)

    The properties of coal or rock containing gas are very important both for studying coal and methane outburst mechanism and for controlling underground rock in mining. The theological fracture properti

    Jan 1, 1992

  • SME-ICGCM
    Highwall Mining in a Multiple-seam, Western United States Setting Design and Performance

    By Tom Vandergritft

    With advances in system design driving higher productivity, safety, and coal recovery, highwall mining is becoming an attractive option for extending reserve life at surface mines. Typically, highwall

    Jan 1, 2005

  • SME-ICGCM
    Application of Tensioned Cable Bolts for Supplemental Support

    By Ben Mirabile, Alan Campoli, Rodney Poland

    "The majority of U.S. underground coal mines use some form of cable bolt as supplemental support to a primary roof bolting system. Many coal operators employ the high load capacity of non-tensioned ca

    Jan 1, 2010

  • SME-ICGCM
    Eclipse System Improves Resin Anchored Rebar Bolting

    By Al Campoli

    The majority of the 100 million roof bolts installed each year in the United States are 5/8 inch deformed rebar fully grouted into a one inch borehole. Commonly referred to as B-Series or No. 5 bar, t

    Jan 1, 2002

  • SME-ICGCM
    The Duncan Method of Partial Pillar Extraction at Tasman Mine

    By Kent D. Mctyer

    Mining commenced at Tasman Mine in late 2006. The current method of mining is bord and pillar using continuous minerbolters and shuttle cars for first workings and secondary extraction using mobile ro

    Jan 1, 2011

  • SME-ICGCM
    Inorganic Cement Grouted Bolt System

    By M. O. Serbousek

    In 1975 the Bureau of Mines Spokane Research Center began a series of laboratory and field tests to investigate the feasibility of developing a substitute for the organic chemicals used in resin roof-

    Jan 1, 1981

  • SME-ICGCM
    Advanced Surveying Method For Measuring Roof Convergence

    By M. Zaki Rashad

    In this paper, if three slant distances are measured from three given points of known coordinates to an unknown point, the position of this point (X, Y, and Z coordinates) can be determined. A compute

    Jan 1, 1990

  • SME-ICGCM
    Worldwide Implementation Of Continuous Miner System - Integrating Ground Control With Technology

    By Thomas W. McClain

    This paper describes the importance of considering ground control measures when importing U.S. continuous mining technology in foreign countries. Important ground control factors are discussed. Eac

    Jan 1, 2001

  • SME-ICGCM
    A Study on Geotechnical Risks in Interaction Between Open-Pit and Block Caving

    By Ezzeddin Bakhtavar

    There are several geotechnical challenges and risks inherent in the interaction between the open-pit and block cave mining environments. This is especially true when they have to work simultaneously f

    Jan 1, 2011

  • SME-ICGCM
    Mobile Roof Supports For Pillar Retreat Mining

    By Robert P. Kudlawiec

    The use of Mobile Roof Supports (MRS) in pillar retreat mining has been a fairly recent occurrence in coal mining operations in the United States (1988). Determining the pillar block configuration, th

    Jan 1, 2000

  • SME-ICGCM
    Tailgate Roadway Convergence: A Key Indicator Of Potential Ground Control Problems

    By Robert M. Cox

    Abrupt tailgate roadway ground failures, described as floor bumps, sometimes occur in the tailgate entry outby the face during the high-speed extraction of coal from mechanized longwall panels. These

    Jan 1, 1994

  • SME-ICGCM
    Geotechnical Constraints On A 6 M Single Pass Longwall

    By Ross W. Seedsman

    The feasibility of 6 m high single pass longwalling has been studied using Newlands Mine as a case study An intensive geological investigation identified a range of hazards but a mine layout was possi

    Jan 1, 1992