Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • ISEE
    Ore Waste and Dilution Studies of Surface Mineral Blasting with 3D Distinct Element Heave Models

    By Stewart A. Silling, Dale S. Preece

    The two key results of rock blasting are fragmentation and movement of geomaterials. Movement/flow of the blasted rock is often referred to as heave. Modeling the movement of full scale blasting is no

    Jan 1, 2016

  • ISEE
    Effects of Electronic Detonators in Underground Tunneling Applications

    By Charles Zdazinsky

    Over-break is undesirable in underground civil construction because it excessively damages rock along the perimeter of the tunnel, which directly influences the cycle times of advancement. A quicker c

    Jan 1, 2015

  • ISEE
    New Lightweight Dragline Buckets

    By Rowan A' Murry Karstel

    One way to ensure dragline productivity is by Increasing the size of the dragline bucket. In August 1994, Optimum Colliery in conjunction with Van Reenen Steel, Northwest Applied Technology, SSAB of S

    Jan 1, 1998

  • ISEE
    Improved Blasting Using Low Density Ammonium Nitrate Prills; Improved Fragmentation via the Use of Blast Controls Plans

    By Ron Frye, Carl Liibbe, Wayne Curtis, Julie Pecori, Dan Leach

    Test work comparing the performance of a Low Density Porous Ammonium Nitrate Prill to regular Porous Ammonium Nitrate conducted in Pennsylvania and New York showed that less ammonium nitrate was requi

    Jan 1, 1997

  • ISEE
    Protection Against Litigation with Good Pre-Blast Surveys, Damage Inspections and Record Keeping

    By Randall Wheeler, R. Frank Chiappetta

    2000 HIGH-TECH SEMINAR Blasting Technology, Instrumentation. and Explosives Applications - Orlando, Florida, USA July 24 - 27,200O 2000 BAI - PROTECTION AGAINST LITIGATION WITH GOOD PRE-BLAST SURVEYS,

    Jan 1, 2000

  • ISEE
    Blast Designs and Instant Diagnostics Using the SVC1000 Digital, High-Speed Smart Video Camera System

    By Bruce Vandenberg, Andy Bartfay-Szabo, Steve Conway

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 500 frames per second. Up to 8 seconds of data can b

    Jan 1, 1995

  • ISEE
    Presplitting Techniques for Conventional, Air Deck and Dimension Stone Applications

    "The objective in controlled blasting is to reduce overbreak to control the final pit wall slope, shaft, drift ditch, bench, etc. to the final planned excavation limit. The six main types of controlle

    Jan 1, 1994

  • ISEE
    Journal: Musings of a Safety Philosopher Relating to Blasting Safety

    By Ralph Dawson

    The following additions to SLP-4 “ALWAYS AND NEVERS” have been approved by the Board of Governors since the last printing 6/97 and will be included in the next printing soon. They are also included in

    Jan 1, 2001

  • ISEE
    Case History: Controlled Demolition of a Reinforced Concrete Structure in San Sepolcro, Italy

    By Roberto Folchi

    This note deals about the controlled demolition work for the dismantling of an industrial structure in San Seplocro, Italy. The structure to be demolished, the FLOWERS SILOS, consisted in a multilevel

    Jan 1, 1994

  • ISEE
    Using Photogrammetry Data from Unmanned Aerial Vehicle (UAV), Small Unmanned Aircraft Systems (sUAS) for Blast Design

    By Luis Valentim, John E. Wiegand

    Highwall or face profiling has long been used to facilitate the design and placement of front row blastholes to ensure optimum burdens. Traditionally, a large number of laser measurement points obtain

    Jan 1, 2016

  • ISEE
    Blast Design and Diagnostics Using, Portable Solid State, High-Speed Videography Systems

    By Laura Bustemante, Bruce Vandenberg, Fred Huettig

    Recent advances in solid-state, field portable, fast framing video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 8 seconds of data can

    Jan 1, 1998

  • ISEE
    Mining to Reduce Future Environmental Liabilities

    By Mark A. Williams

    "This paper was originally intended to be a presentation of a case study of two surface bituminouscoal mines in the southern Appalachian coal fields located within five miles of each other. These mine

    Jan 1, 1994

  • ISEE
    Demolition of the Milwaukee Railroad Trestle Pier, Lind, WA

    By William C. B. Gates

    Demolition blasting next to an active railroad can be very challenging because of track safety, blasting vibrations, potential track fouling by blast debris, and short work windows on a live track. Re

    Jan 1, 2016

  • ISEE
    Large Diameter and Deep Hole Presplitting Techniques for Safe Wall Stability

    By Sam Bang Jr, Rodney Burke

    As mining progresses in the West, the depth of material has increased, making highwall stability a major factor in safety and production. The Jim Bridger Coal Mine’has made highwall stability a priori

    Jan 1, 1998

  • ISEE
    "Journal: GPS Signal Accuracy Improves"

    By Larry Schneider

    Are you one of the thousands of hunters, fisherman, or hikers who purchased handheld GPS systems over the past several years and then been disappointed in their accuracy and performance. Or maybe you

    Jan 1, 2001

  • ISEE
    Journal: 100 Years / THE ST. MARY’S PARK TUNNEL, N.Y.C. & H.R.R.R.

    By Robert Hopler

    As a part of the depression and rectification work on the Port Morris branch of the Harlem Division of the New York Central & Hudson River Railroad, a short tunnel is being driven under St. Mary’s Par

    Jan 1, 2006

  • ISEE
    Hole Deviations in Mining Operations: Types, Sources and Effects

    By Sam Kangwa, Thomson Sinkala

    Th e re are three basic types of hole deviations in long hole d ri l l i n g , n a m e l y collar i n g , alignment and tr a j e c t o r y dev i a t i o n s . In mining, the accur a cy in drilling has

    Jan 1, 2004

  • ISEE
    The Odd Challenges of Backcountry Trail Blasting

    By Ed Billington, Mike Shields

    The trail blaster is faced with a wide range of workrelated challenges, not the least being the work setting itself. It is usually remote, being anywhere from 5 to 30 or more miles (8 to 50 km) from a

    Jan 1, 2004

  • ISEE
    Blast Designs and Diagnostics Using Portable, Solid State, High-Speed Videography Systems

    By Bruce Vandenberg, R. Frank Chiappetta, John Foley

    Recent advances in solid-state, field portable, fast framing compact video camera systems and PC based frame capture hardware now allow blast imaging up to 1000 frames per second. Up to 4.1 seconds of

    Jan 1, 2000

  • ISEE
    Studies on Safe Blasting Technique in Fire Area of Coal Mines

    By A Bagchi, Nabiullah, Jagdieh

    "A number of coal mines in India are affected by fire. Most of coking coal reserves in the country are located in Jharia coalfield where more than 18 sq. km is in the grip of fire. Generally such fire

    Jan 1, 1993