Treated Round Wood Piling Specifications
By James S. Graham
Specifications for treated round wood piling are presented for the engineers consideration. Included in the text are background information, technical committees, Chellis, quality, treatment, static a
Jan 1, 1992
-
Innovations in the Design and Construction of Marine Foundations
By Robert B. Bittner
"AbstractLarge diameter tubular piles offer significant advantages in terms of design performance and economy for major marine structures. This is particularly true for foundations of major overwater
Jan 1, 2014
-
Design Of Foundation On Granular Piles For Five Storeyed Esidential Complex At Nazira, Assam - Synopsis
By B. N. Hira
A multistoreyed residential complex was at the penultimate stage of construction by ONGC at Nazira, Assam. The site was situated at high earthquake zone. The subsoil was very weak and contained soft t
Jan 1, 1996
-
Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction
By Philip Bonanno
The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3
Jan 1, 1994
-
Recent Advances In Large Diameter Diaphragm Wall Shafts
By Benoit Virollet
Over the last 10 years the diameter of unbraced, unlined and unanchored circular shafts has grown dramatically in many parts of the world. This progress has taken place through improvements in: constr
Jan 1, 2006
-
Sand Compaction Piles ? Synopsis
By A. Holeyman
The displacement compaction piles described in the paper are installed using a heavy casing or tube and an internal drop hammer. The casing which initially is closed at the bottom by a sand plug displ
Jan 1, 2010
-
Augered Cast-In-Place Piles: Regional Project Profiles - Community Osteopathic Hospital Harrisburg, Pa
GENERAL CONTRACTOR: ALEXANDER CONSTRUCTORS, INC. STRUCTURAL ENGINEER: CAGLEY & ASSOCIATES, INC. GEOTECHNICAL ENGINEER: F.T. KITLINSKI & ASSOCIATES, INC. PILE FOUNDATION CONTRACTOR: L.G. BA
Jan 1, 2001
-
Response to Load for Four Different Types of Bored Piles
By Mario Terceros H., Bengt H. Fellenius
"ABSTRACTFour strain-gage instrumented bored piles were constructed in a sedimentary, dense to very dense, fine to medium sand in Santa Cruz, Bolivia. Two of the test piles were the normally used bore
Jan 1, 2014
-
Installation Of Augered Cast-In-Place Piles (3e8ab035-87ca-4b14-9759-c57d4f787aa0)
By Tracy Brettmann
Equipment ? Hollow Stem Auger ? Drill Bits ? Leads/Torque Arm ? Hydraulic Gearbox ? Hydraulic Power Unit ? Grout Pump ? Crawler Crane
Jan 1, 2004
-
Increase In Shear Modulus By Soil Mix And Jet Grout Methods
By Paul J. Axtell
The results of in-situ geophysical cross-hole tests on improved soil by soil mixing (SM) and jet grouting (JG) are described. This testing was conducted on soil improved by SM and JG columns construc
Jan 1, 2008
-
Mt. Baker Ridge Access Pits And Seattle Bus Tunnel Jet Grouted Piles
By John F. MacDonald
From 19BS thru the present, Guy F. Atkinson Construction Company has been involved in several transportation construction projects in the Seattle area. Two of these contracts, the Mt. Baker Ridge Tunn
Jan 1, 1990
-
An Innovative Foundation Technology For The Construction Of Retaining Walls In Urban Areas - Introduction
By F. Pagliacci
Retaining walls for the construction of underground urban infrastructures have to be executed considering the impact of a deep foundation job-site within an urban network. Traditional excavation syste
Jan 1, 2000
-
Dynamic Stability Of An Axially Loaded Pile
By S. S. Gajin
The paper deals with parametric vibrations of an axially loaded pile. The dynamic model is derived by means of Hamilton's principle and reduced to a partial differential equation with variable c
Jan 1, 1989
-
Construction, Inspection And Lessons Learned For 3.81-M Diameter CIDH Piles ? Richmond-San Rafael Bridge Seismic Retrofit
By A. R. Dover
The Richmond-San Rafael Bridge is a 6.92 kilometer (4.3 mile) long major toll bridge span that crosses the northern San Francisco Bay in a highly seismically active region. Tutor-Saliba / Koch / Tidew
Jan 1, 2008
-
Starsol Piles Foundation Of A Steel Structure At The San Martin De La Vega Resort Park (Madrid)
By Claudio Olalla
This paper relates to the foundation of a steel structure located at the San Martin de la Vega (Madrid) amusement park. The structure has more than 100 supports with various loading conditions, includ
Jan 1, 2002
-
Application Of Electro-Kinetics To Expedite Pile Setup In Kaolinite Clay
By Susheel R. Kolwalkar
A significant increase in the side shear capacity over a period of time is often observed in case of driven piles. This phenomenon is referred to as ?setup? or ?freeze?. This phenomenon cannot be pred
Jan 1, 2008
-
Some Developments On Laterally Loaded Piles With Particular Reference To P-Y Subgrade Reaction Method - Resume:
By A. L. Garassino
Dans cet article on parle sortout de l'approche de calcule pour les pieux charges horizontalement avec particuliere reference aux curbes p-y et è une solution semi-empirique qui prende en conside
Jan 1, 1994
-
Installation Of Augerpiles In Low Headroom And Restricted Access Conditions
By Jim Steding
L.G. Barcus and Sons, Inc. recently completed a three-phase project for the expansion of Presbyterian Hospital in Albuquerque, New Mexico for McCarthy Construction Co., the Construction Manager for th
Jan 1, 2003
-
Geotechnical Exploration Phase Drilled Shaft Load Testing
By Walter E. Vanderpool
Full scale load tests are frequently performed immediately prior to deep foundation construction to verify the design assumptions. Occasionally, load tests are performed during design development and
Jan 1, 2011
-
Caisson Foundation For High Speed Paper Machine ? 1 ? Introduction
By Anthony H. Tawil
Modern, high-speed machines used in the manufacture of paper require foundations with stringent settlement constraints. To fulfill this requirement, caisson piles, extending into bedrock, were selecte
Jan 1, 1987