Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Application of Multivariate Image Analysis (MIA) to Predict Concentrate Grade in Froth Flotation ProcessesBy Pierre Pelletier, Julie Fournier, Gianni Bartolacci, Yves Breau, Dominique Girard, Ahmed Bouajila, Carl Duchesne
"The development of on-stream analyzers (OSA), such as those based on X-ray fluorescence (XRF), has been key to improve metallurgical performance of flotation processes. However, since these analyzers
Jan 1, 2003
-
Stratigraphy and Structure of the Corbin Coalfield, British ColumbiaBy B. R. MacKay
Introduction The Corbin coalfield is one of the smallest, and at the same time one of the principal, producing bituminous-coal areas in southeastern British Columbia, and is unique on account of the
Jan 1, 1931
-
Starting Koala North ? North America?s First Underground Diamond MineBy Paul Harvey
Following initial discovery in 1991, BHP Billiton Diamonds Inc opened Canada?s first diamond mine, the Ekati Diamond Mine TM (Ekati) in the Northwest Territories on October 14th, 1998. Four short year
May 1, 2003
-
The Oxygen Demand of Flotation PulpsBy F. Rosenblum, P. Spira
"Techniques were developed to determine the oxygen demand of sulphide ore pulps in the laboratory and in concentrators. The effect of variables which influence oxygen demand was studied, and it is sho
Jan 1, 1974
-
Investigating the Influence of Mechanical Anisotropy on the Fracturing Behaviour of Brittle Clay Shales with Application to Deep Geological RepositoriesBy Andrea Lisjak Bradley
Clay shales are currently being assessed as possible host rock formations for the deep geological disposal of radioactive waste. However, one main concern is that the favourable long-term isolation pr
Jan 1, 2015
-
Standardization of Data Formats as Basis for Future Efficient Mine ProductionBy Christoph Mueller
Mining operations are characterized by cost pressure and cycling product prices. A high potential for enhancing efficiency is the integration of all single steps of the mining working chain into a pro
May 1, 2002
-
Developments In Copper Smelting: A Discussion of Changes in Copper Technology and Science as Seen through the Lens of Professor Davenport’s TEXTSBy Phillip J. Mackey, Gerardo R. F. Alvear F.
It is now 38 years since the publication of the first edition of "Extractive Metallurgy of Copper" by Professor W.G. Davenport and the late Professor A.K. Biswas. The text book would be issued in a to
Jan 1, 2014
-
Improving the Gold Gravity Performance: an Investigation into the Laboratory and Plant Gravity RecoveriesBy Sunil Koppalkar, Guillaume Noel, Ahmed Bouajila, Makni Sami, Claude Gagnon
"Gold gravity recovery circuits utilizing enhanced gravity separators have become an integral part of many of the modern gold processing plants. Thus, efforts to improve the operating efficiency have
Jan 1, 2011
-
In-Plant Hydrogeochemical Mapping: A Tool to Localise Potential Deleterious Reactions Due to Water Quality in a ProcessBy Mohamed Ourriban, Stéphanie Somot, Éric Proulx, Jean-Sébastien Marois, Marjolaine Drouin, Paul Blatter, Ahmed Bouajila, Claude Gagnon
"The mining industry has to face increasing restrictions concerning the use of fresh water in Québec and throughout the world. Increasing recirculated water usage could lead to a better control of the
Jan 1, 2012
-
Some Geological Problems of Central SaskatchewanBy F. H. Edmunds
I N presenting this paper, the writer wishes to point out some of the difficulties and problems of geological work in that part of Saskatchewan in which outcrops are few. These problems are well known
Jan 1, 1937
-
Barrick Goldstrike Roaster Facility Dry Grinding and LeachBy Dayle Denton, Lloyd Buckingham, Kenneth G. Thomas, Jacques McMullen
"The dry grinding and leaching circuits of Barrick Gold’s new Roasting Facility at Goldstrike Mine in Nevada, USA incorporate well proven technologies in a unique combination. During the design of the
Jan 1, 2001
-
Constrained Multivariable Control of a Pilot Flotation Column at the Laronde ConcentratorBy D. E. Calisaya, É. Poulin, A. Desbiens, R. del Villar, A. Riquelme
"A 15 cm diameter by 732 cm height, fully automated pilot column was installed in the Agnico-Eagle’s Laronde concentrator (Québec), for evaluating the performance of newly developed sensors and advanc
Jan 1, 2012
-
Flowsheet Development, Commissioning and Start-up of the Voisey’s Bay Mill (33ff6fb1-ab13-4641-96a6-597d0ce850b9)By Manqiu Xu, Joe Holmes, Peter Wells, Peter Langlois, Germain Labonté, Jim Barrett
"The flowsheet for the Voisey’s Bay mill had to meet the challenge of processing an ore containing high pentlandite and chalcopyrite values in a largely pyrrhotite/troilite matrix. In the 1994-97 peri
Jan 1, 2007
-
Some Insights into the Process Design of Ferronickel SmeltersBy S. Mostaghel, S. Nicol, M. Y. Solar
Once upon a time, the process engineer developing the design criteria for a new saprolite ferronickel smelter had it easy: most ores were around 2.5% Ni, with a Fe/Ni ratio of 4 to 5 and a SiO2/MgO ra
Jan 1, 2014
-
Magnetic Gold: Losses from a Gold Recovery CircuitBy Adil Aledresse, N. Emre Altun, Bern Klein, Nuri Hmidi, Brent Hilscher
A study was conducted to investigate high gold grades in water lines and carbon fines collected from the Musselwhite gold recovery circuit. It was discovered that fine magnetic particles in the overfl
Jan 1, 2014
-
Innovative management techniques at Kiena Gold Mines LimitedBy Brian A. Ferguson, Raynald O. Vezina, Marielle Gaudet, Raoul R. Boissonneault
"Kiena has been committed to developing a fresh management and employee relations approach since the commencement of production in 1981. The functional organizational structure encourages joint partic
Jan 1, 1987
-
Laboratoire d?analyse des fluidsBy Valérie Tremblay
Plan de la presentation ?Laboratoire d?analyse des fluids ?Gestion des contaminants ?Condition Monitoring Avantages reliés aux analyses ?En savoir plus!! ?pour minimiser les coûts d?opération;
Feb 1, 2008
-
Barrick?s Global Approach to Ground Control ManagementBy J. Ran
Ground instability is among the major causes of serious incidents and production disruptions in the mining industry and has a significant impact on safety. Mining companies may have operations in a nu
May 1, 2006
-
Lifter Design Using a DOE Approach with a DEM Charge Motion ModelBy Ian Orford, Peter Radziszewski, Lud Strah
"An autogenous grinding circuit was commissioned at the Brunswick concentrator in October 1998. The AG mill was subsequently converted to SAG operation in May 1999 for a number of reasons. The mill ha
Jan 1, 2003
-
Rougher Flotation Improvements at P.T. Freeport Indonesia’s Grasberg OperationBy Harry Siewert
"The commissioning of the 4th concentrator (C4) at Freeport Indonesia in early 1998 increased total mill throughput from 130k to 230k tonnes per day. The C4 flowsheet consists of a single 38 ft diamet
Jan 1, 2001