Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • AUSIMM
    An Ecological Approach to Koala Conservation in a Mined Landscape

    By R Wheeler, E Stalenberg, J Lemon, M S. Crowther, D Lunney, K Ross

    Gunnedah, in north-western New South Wales (NSW), including the town, the surrounding Liverpool Plains and the Pilliga forests to the west, are currently the subject of intense mining interest for coa

    Jul 10, 2012

  • AUSIMM
    Assessing Contaminant Risk Associated with the use of Mine Water for Dust Suppression

    By C Gimber

    Dust suppression is an important environmental control in most mining operations. The poorest quality water within a mine site is often used for dust suppression since it provides an effective means o

    Nov 26, 2013

  • AUSIMM
    No entry mechanised presink of the Wira Hoisting Shaf

    By D Kilkenny

    This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min

    Mar 29, 2023

  • AUSIMM
    Pre-concentration by screening – a cost-effective approach to testing and evaluation

    By N Clarke, A Barros

    Preconcentration of run-of-mine subgrade and marginal ore by screening has the potential to substantially improve the economics of mining, particularly for large, low-grade orebodies, and to reduce en

    Aug 24, 2022

  • AUSIMM
    Mine Pit Slope Geotechnical Design

    Mine pit slopes in the Pacific Rim are a geotechnical challenge because of the complex geology in which they are developed. Mines are currently being fast-tracked to meet the increase in commodity pri

    Jan 1, 2006

  • AUSIMM
    Outotec Pressure Oxidation - More out of Sulfide Ore

    By J Tiihonen, J OÆCallaghan, T Haakana

    Outotec is today capable of providing technologies, process equipment and engineering for the construction of pressure oxidation leaching (POX) plants in any location in the world. Outotec works with

    Sep 26, 2013

  • AUSIMM
    Using Life Cycle Analysis to Assess the Toxicity Impacts of Waste Streams from Metal Production Processes

    By N Haque

    Base metal ores contain low levels of toxic/hazardous elements such as arsenic, antimony, bismuth, cadmium, lead and mercury. Given the large tonnage of base metal ores mined and processed each year g

    Jan 1, 2009

  • AUSIMM
    Gold-Silver Vein Mineralisation at Cononish, Scotland

    By I M. Platten, C J. S Sangster, Y Xie, S C. Dominy

    Cononish is a steep, narrow NE-SW trending vein system that was emplaced into late Proterozoic metasediments. It shows brittle style deformation and postdates metamorphism and associated Caledonian fo

    Sep 26, 2013

  • AUSIMM
    Optimising the Long-term Mine Waste Dump Progression and Truck Hour Schedule in a Large-scale Open Pit Mine Using Mixed Integer Programming

    By Y Li, S Ramazan, E Topal

    A mine waste dump progression plan can provide a clear outlook of the mining operation. To produce such an output requires detailed placement schedule of the mined material, including the volume (or t

    Nov 24, 2014

  • AUSIMM
    The application of secondary crushing at the Jundee gold mine

    By S Tyrrell, B Jackson, K Matson

    Northern Star Resources Limited Jundee Gold Mine in Western Australia operates a comminution circuit that consists of a primary crusher, 3.85 MW semi-autogenous grinding (SAG) mill, 1.8 MW ball mill a

    Aug 29, 2018

  • AUSIMM
    Real-Time Simulation in Process Engineering - Dream or Reality?

    Computation is believed to be a powerful tool in scaling-up chemical processes and in designing materials, however, is being challenged by low predictability and limited scalability. This presentation

    Sep 13, 2010

  • AUSIMM
    Effect of Flotation Feed Density on the Operation of a Flotation Cell

    By R Crosbie, K C. Runge, E Tabosa, J K. McMaster

    Flotation feed density is an operating parameter which is currently not well understood. Most models of flotation only incorporate its effect on particle residence time, but it is likely to have addit

    Oct 29, 2012

  • AUSIMM
    Update of the geometallurgical model of a spirals circuit

    By R Belissont, C Veloso, L Senez, F Vasconcelos, E Kleiderer, J Mesquita, Y Basselin

    Mont-Wright mining complex is an important asset of ArcelorMittal located in the province of Quebec, Canada. It is composed by Mont-Wright and Fire Lake mines, operating 365 days per annum, and produc

    Sep 18, 2023

  • AUSIMM
    Project-Finance Risks ù Due Diligence Matters

    Project-finance risk assessment is mature and approached systematically. Mining industry due diligence remains fragmented with specialists addressing different aspects of the project such as reserves/

    Jan 1, 2007

  • AUSIMM
    Development of Effective Rehabilitation Protocols for Mineral Sands Mining in Virginia, USA

    By W L. Daniels, C Stilson, C Zimmerman

    Mineral sands mining for ilmenite, rutile and zircon has disturbed over 1000 ha of prime farmland in Virginia (USA) since 1997 and additional areas are likely to be disturbed in Virginia and North Car

    Jul 10, 2012

  • AUSIMM
    The Impact of Classification on the Energy Efficiency of Grinding Circuits - The Hidden Opportunity

    By W Valery, A Jankovic

    A growing demand within the minerals industry for sustainable development and the introduction of carbon taxes have resulted in a significant focus on improving the energy efficiency of comminution ci

    Oct 29, 2012

  • AUSIMM
    The Intec Copper Process: A Detailed Environmental Analysis

    By N J. Welham

    The Intec Copper Process is an environmentally advantageous hydrometallurgical process for the production of high purity copper and associated precious metals from copper sulphide concentrates. The pr

    Jan 1, 2002

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • AUSIMM
    Accelerated aging testing of geomembranes for tailings liquor

    By J Folwell, G Phillips, F Gassner

    Geomembranes selected for various applications often start with considering target properties developed by industry organisations such as Geosynthetic Research Institute (GRI), and test methods develo

    Jul 1, 2021

  • AUSIMM
    Preparation of a JORC Code Compliant Resource Statement Based on an Evaluation of Historical Data – A Case Study from the Panguna Deposit, Bougainville, Papua New Guinea

    By P Collier

    From 1972 until 1989 when operations were suspended Bougainville Copper Limited (BCL, owned 53.58 per cent by Rio Tinto Limited) operated a large open pit mine and processing facility at Panguna on Bo

    Aug 22, 2011