Electrowinning of Copper at High Current DensitiesThe maximum current density at which conventional copper electrowinning plants will result in satisfactory, adherent, and dendrite·free cathodes is determined by the thickness of the diffusion bo
Jan 1, 1972
-
Investigating continuous time open pit dynamics - SynopsisCurrent mine production planning, scheduling, and allocation of resources are based on mathematical programming models. In practice, the optimized solution cannot be attained without examining all pos
Jan 1, 2008
-
Annual Review 1992 – Exploration 1992Worldwide minerals exploration slipped in 1992 from 1991 levels. Although industrial production figures showed the US economy emerging from recession in early 1992, it was not until February 1993 that
Jan 1, 1993
-
Total Primary Milling Cost Reduction By Improved Liner Design - SynopsisBy J. Dahner
Total milling cost is composed of energy, liner and grinding media costs. In primary high ball load milling, the grinding media play the biggest role in total milling cost. This cost can be drastical
Jan 1, 2011
-
High Performance Tunnel Boring Machine for Kárahnjúkar Headrace Tunnel, KAR-14—A Design and Case HistoryBy Brian Khalighi, Massimo Franceschi, Giovanni Giacomin, Gianni Porta
Headrace Tunnels and parts of the Access Adit Tunnels of Kárahnjúkar Hydropower project, KAR-14, in Iceland will be excavated using three full-face Robbins Tunnel Boring Machines (TBM). TBM sizes rang
Jan 1, 2005
-
Pelletising Characteristics of the Magnetite Concentrate from Daye Iron MineBy Xu Z, Hu C
An attempt has been made to investigate the performance of green pellet formation of the Daye magnetite concentrate from the weak-magnetic separation plant. The optimum conditions for the commercial
Jan 1, 1999
-
Automated Cyanide Control at the New Britannia Mine, Snow Lake, Manitoba: Fall 1998By Shawn Healey, Ray Norcross
"Site IdentificationNew Britannia MineA 50/50 WX Gold Inc. - High River Gold Mines Ltd. Joint VentureTVX Gold Inc. is the OperatorLocationThe New Britannia Mine is located in the town of Snow Lake, Ma
Jan 1, 1999
-
Production Scheduling At LKAB’s Kiruna Mine Using Mixed Integer ProgrammingBy M. Kuchta, A. Newman
LKAB’s Kiruna Mine, located in northern Sweden, produces about 24 Mton of iron ore yearly using sublevel caving. For efficiency, the mine must deliver planned quantities of three ore products. We use
Jan 1, 2002
-
Owner Procured Tunnel Boring Machines––A DiscussionBy A. R. Biggart, A. Walters, G. J. E. Kramer
The Owner Procurement Process or OPP is a proven, viable alternative contract delivery method that is potentially applicable to many tunnel projects. Using the OPP, the owner specifies and procures ma
Jan 1, 2005
-
Gyratory Crusher Model And Impact Parameters Related To Energy ConsumptionBy R. Pothina
The objective of this research was to develop a mathematical model for gyratory crushers to help in the prediction of energy consumption and to analyze dominant parameters that affect this energy cons
Jan 1, 2007
-
Electrochemical removal of lead from aluminium using fused saltsBy F. Tailoka, G. Zhao
Pb is an unwanted impurity in Al for which there is no established method of removal. As it interacts strongly with alkali metals, separation was achieved by adding Na or K to molten Al at 953-1 003 K
Apr 1, 1995
-
Comparing the Implementation of Two Dust Control Technologies from a Sociotechnical Systems Perspective Mining, Metallurgy and Exploration (549ca714-c839-4488-b044-41821e3cdd4a)By Andrew B. Cecala, Emily J. Haas, Jay F. Colinet
A sociotechnical system (STS) creates a framework that allows an examination of how social and technical factors affect organizational outcomes within a specific environmental context. STS has been ri
-
Engineering Classification of ShalesBy Robert A. Siokler
Approximately 75 percentage of the earth's land surface is comprised of shale or shale-like materials. Shale itself is composed of the residue from an almost infinite variety of weathered parent
Jan 1, 1986
-
Uncertainty Determination in Rock Mass Classification When Using FRMR SoftwareBy M. Rafie, M. Rinne, F. Samimi Namin
"SynopsisRock mass classification systems constitute an integral part of empirical underground excavation design. One system that is commonly used to classify rock mass is the Rock Mass Rating, or RMR
Jan 1, 2015
-
Comparing the Implementation of Two Dust Control Technologies from a Sociotechnical Systems Perspective Mining, Metallurgy and ExplorationBy Andrew B. Cecala, Emily J. Haas, Jay F. Colinet
A sociotechnical system (STS) creates a framework that allows an examination of how social and technical factors affect organizational outcomes within a specific environmental context. STS has been ri
-
Re-Forging and Heat Treatment of JackbitsBy Larkin F, Farrer E, McGhie R. R
The Electrolytic Zinc Company of Australasia Limited commenced productive operations during February, 1936, at the- Rosebery and Hercules mines, which are situated near Rosebery, Tasmania. At this tim
Jan 1, 1939
-
Eskay Creek Mine And Mill – A Continued SuccessBy G. Biles, K. Loughran, R. Anand
The Eskay Creek Mine, a high-grade gold and silver underground mine in northwestern British Columbia started operations in late 1994. For the first three years of operation, ore was crushed to minus
Jan 1, 1999
-
Copper Waste Dump LeachingCopper waste dump leaching is growing in importance because of the.large tonnages (up to 250,000 ton/day) of low grade waste rock available from open cut mining of copper deposits and proof that contr
Jan 1, 1967
-
Single-Head Large Diameter Hammer Drill For Bored Piling Actualizes Large Diameter Rock Drilling And Deep Underwater Drilling Operation - SynopsisBy J. Nakayama
Down-the-hole hammer is commonly recognized as the most powerful drilling equipment for weathered to fresh rock formation including boulders. However, its drilling diameter is restricted by reasons of
Jan 1, 1996
-
Effects Of Subsidence On Steep Topography And Cliff LinesBy Don Kay
A two year study into the effects of coal mining induced subsidence on cliff lines was undertaken by the Department of Mineral Resources with the support of a grant under the National Energy Research,
Jan 1, 1992