Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Reinforcement of Existing Deep Foundations with MicropilesBy Mauricio Terceros, Martin Achmus, Freddy Lopez
The massive use of deep foundations had a remarkable influence in the building industry in the 20th century. Piles and micropiles made possible to erect thousands of civil structures around the world,
Jan 1, 2018
-
Extractive Metallurgy Division - Stoichiometry of Lead TellurideBy I. Cadoff, E. Miller, K. Komarek
Jan 1, 1960
-
Some Experience With Large Diameter Caissons ? SynopsisBy I. H. Wong
The large diameter caisson foundations and their construction methods for three 50 to 60 storey high buildings in Singapore are described. The caissons are 5 m to 8 m in diameter and 40 m to 100 m dee
Jan 1, 2010
-
Mine Stability Evaluation From Microseismic Activity (5cc6a13d-fd4e-4c74-a7d1-2213b7f2a1da)By Brian R. A. Wood
Any defect activity resulting from an applied stimulus on a structure will generate a stress wave which travels in the medium under the laws of acoustics, thus the name of acoustic emission (AE). AE t
Jan 1, 1992
-
Excerpts From Drilled Shafts: Construction Procedures And Design Methods - General ApproachBy L. C. Reese
? Good construction and inspection presumed. ? Capacity-computation factors are independent of construction method. ? To account for variable or uncertain site conditions, anticipated construc
Jan 1, 1988
-
Applying up-to-date Blasting Technology and Mine to Mill Concept in QuarriesBy Robert McClure, Frederic Leclercq, Ricardo Chavez
With significant vibration control and fragmentation challenges facing them, the CBS quarry (department of the Nord) successfully integrated a technical partner and mine to mill optimisation to deal w
Jan 1, 2007
-
Quality Control Of Piling And Deep Foundations In Belgium, From The Design To The Execution. ? SynopsisBy D. Goossens
Quality control is a system which should guarantee that quality is achieved. It is the execution and verification of a project in an organised way, in order to obtain the maximum of certainty that the
Jan 1, 1996
-
Deformation of Single Crystals of Lead Part II - Orientation of Crystals of Fractured Creep Specimens Part IIThe first part (lH of this work dealt with the process of recrystallization of single crystals of lead after deformation by creep, as revealed by macroscopical examination. It was shown that when recr
Jan 1, 1940
-
Establishing the Process Mineralogy of Gold Ores (7fd4ccc8-59f5-4574-a6a3-a04744804287)By Bruce Jago, Joe Zhou, Chris Martin
"From the perspective of metallurgical processing, gold ores can be classified into free-milling and refractory ores. Their extractive metallurgy are largely driven by mineralogical factors such as: g
Jan 1, 2004
-
RI 9669 - Laboratory and Field Performance of a Continuously Measuring Personal Respirable Dust MonitorBy Donald P. Tuchman, Robert P. Vinson, Steven J. Page, Linda J. McWilliams, Gerald J. Joy, Steven E. Mischler, Jon C. Volkwein
The National Institute for Occupational Safety and Health (NIOSH), through an informal partnership with industry, labor, and the Mine Safety and Health Administration, has developed and tested a new t
Jan 1, 2006
-
Dutch Harbor, Alaska Unisea Quarry – Using Near Field Vibration Measurements to Improve Blasting Results Close to StructuresBy Mike Cammack, Logan Huppert, Gustavo Azpilcueta
During the summer of 2015, Unisea Inc. sought proposals for the G1 Dock Replacement Project in Dutch Harbor, Alaska. It would be a one year project and construction was scheduled to begin in the sprin
Jan 1, 2018
-
Construction of Headrace Tunnel of Uma Oya Water Conveyance Project, Sri LankaBy Jamal Rostami, Ataollah Rahbar
"Uma Oya Multipurpose Development Project is under construction in Sri Lanka. This project involves 2 Rolled Concrete Core (RCC) Dams connected through a tunnel currently under construction by Drill a
Jan 1, 2016
-
Trapezoidal Tapered Ring—Key Position Selection in Curved TunnelsBy Shimi Tzobery, John E. Shamma, Samuel Swartz, Gary B. Hemphill
The trapezoidal tapered ring method has made significant progress in recent years for shielded-TBM projects, excavating tunnels with high overburden, strict water tightness criteria, and multiple curv
Jan 1, 2005
-
Taxation Neutrality in MiningThe Government signalled its intention in the Economic Statement on 17 December 1987 to improve the fairness of the taxation system and to facilitate the process of economic adjustment by: removing t
Jan 1, 1988
-
Refining Metals with Sulphur (b5b5ef1f-2600-4f80-b653-f1fb872f28fb)Recent work on decoppering lead is reviewed CUS is formed rapidly even from dilute solutions of copper in lead. The mechanism of decoppering is discussed and an explanation for the retention of metals
Jan 1, 1971
-
Non-Conventional Practice: Recent Case Histories of the use of Vertical Buttress Piles in Deep Excavation SupportBy Tony Brunger, Abid O. Adekunte, George Munteanu, David Greentree
A number of novel solutions have been proposed in recent years as alternatives to props and tie-backs in deep excavation support e.g. Adekunte (2008), Deschamps et. al. (2008), Adekunte et al. (2010)
Jan 1, 2018
-
Impact And Ramifications Of Setup For Pile FoundationsBy Cory G. Rice
A significant portion of the piling industry has long felt relying on soil setup to gain the required capacity is a complexity that would rather not be dealt with. Instead, the pile are driven to the
Jan 1, 1992
-
Effect Of Agglomeration Binders On The Copper Solvent Extraction ProcessBy K. A. Lewandowski
Binders have been suggested as an aid for agglomeration to improve copper recovery in heap leaching operations. However, it has not been established if the use of binders would negatively affect the s
Jan 1, 2009
-
AziSA: improving mining decisions with real- time data ? SynopsisBy D. Vogt
South African underground hard rock mines are typically managed using measurements made daily, weekly or even monthly of key parameters such as face advance, readiness to blast, blast success, tempera
Jan 1, 2009
-
The Control of Fines through Improved Blast DesignFines and unnecessarily small rock fragments are created by as many as four identifiable breakage mechanisms which operate close to the charged section or sections of the blasthole. The peak blasthole
Jan 1, 1979