Search Documents

Search Again

Search Again

Sort by

  • SME
    Tunneling?Pipe Jacking of Large Diameter Pipes in O?Hare International Airport

    By Mohammad Djavid

    The one-pass tunneling pipe jacking method has often been the most schedule and cost efficient method for the pipe line installation. The main challenges in jacking pipes larger than 108 inches and fo

    Jan 1, 2008

  • SME
    Factors Affecting The Location Of The Neutral Point In Ventilation Systems (4b1f3a2d-a6d9-44c2-9c56-0100dbf7a4af)

    By J. M. Wempen

    Booster fans in underground coal mines are often located using the concept of a neutral point. Normally, intake airways are maintained at higher absolute pressure than return airways, so air leaks fro

    Jan 1, 2012

  • NIOSH
    Evaluation Of Devices To Prevent Construction Equipment Backing Incidents

    By Todd M. Ruff

    Blind areas around construction equipment are a major contributing factor in incidents involving a piece of equipment striking a worker. In highway construction, these types of incidents result in an

  • SAIMM
    Sulphuric acid leaching of zinc and copper from Nigerian Complex Sulphide Ore in the presence of hydrogen peroxide - Synopsis

    By P. A. Olubambi

    The leaching of zinc and copper from Nigerian bulk sulphide ore with sulphuric acid in the presence of hydrogen peroxide was studied. The aim of the study was to investigate the effectiveness of hydr

    Jan 1, 2006

  • DFI
    Uplift Micropile Load Transfer In Unsaturated Missoula Flood Deposits

    By John N. Cunningham

    Despite the wide use of micropiles for rehabilitating and retrofitting existing structures, little is known regarding the load-transfer distribution of grouted micropiles in various soil deposits. Th

    Jan 1, 2011

  • SAIMM
    Electric Arc On A Coke Bed In A Submerged Arc Furnace

    By J. A. Bakken, T. Magnusson, G. Sævarsdottir

    This paper describes measurements of current and voltage done on submerged arc furnaces. The aim is to focus on and attempt to separate from one another the electric arc current and the current bypass

    Jan 1, 2007

  • AUSIMM
    Mine Rehabilitation for Sustainable Landcare: Cost-Effective Strategies

    By R Simcock

    Why Rehabilitate? Legislative Requirement Land rehabilitation is a condition of resource consents for mining. Clause 17 (1) of the Resource Management Act 1991 (duty to avoid, remedy, or mitigate adve

    Jan 1, 1997

  • SAIMM
    An Environmental Management Framework For Tanzania

    The Mineral Sector Development Project, sponsored by the World Bank, has been set up to revise the legal, regulatory and fiscal framework for the minerals industry in Tanzania, with a view to attracti

    Jan 1, 1998

  • CIM
    Collector Consumption Heads or Tails

    By J. A. Meech, R. J. Tucker

    "Since the establishment of froth flotation as an effective method of mineral beneficiation there has been both academic and industrial interest in the levels of the various reagents required to perfo

    Jan 1, 1984

  • SAIMM
    Leaching And Recovery Of Platinum Group Metals From UG-2 Concentrates

    Existing processes for the recovery of platinum group metals (PGM) from UG-2 ores place stringent requirements with regard to chromite content upon feed material to the plant. An alternative hydrometa

    Jan 1, 2004

  • SAIMM
    Variance Propagation In Toll Smelting Operations Treating Multiple Concentrate Stockpiles

    By C. J. Cutler

    Metallurgical accounting for toll treatment smelters pose a number of challenges. Multiple feed stockpiles have to be accounted for as part of the monthly recovery estimation. Moreover, multiple metal

    Jan 1, 2006

  • CIM
    Optimisation des systèmes pelles–camions en utilisant la théorie des files d’attente

    By D. Komljenovic, J. Paraszczak

    "This paper presents the use of queuing theory in truck fleet sizing in open pit mining operations. In the first part, a methodology is developed by which an optimal ratio between the size of shovels

    Jan 1, 2004

  • SAIMM
    Characteristics Of An Effective Self-Directed Work Team In The Gold-Mining Industry

    By A. Nel

    The gold mining industry in South Africa stands to benefit much from the implementation of the self-directed work team concept. Its introduction implies flatter hierarchical structures, empowerment of

    Jan 1, 2006

  • AUSIMM
    Predicting Water Recovery from Flotation Cells

    Predicting Water Recovery from Flotation Cells

    Sep 13, 2010

  • SME
    Monitoring Successful NATM in Singapore

    By K. Zeidler, T. Schwind

    The Fort Canning Tunnel, Singapore, is an approximately 50 feet (15m) wide vehicular tunnel under shallow ground cover that has been constructed according to the principles of the NATM. Its shallow lo

    Jan 1, 2007

  • DFI
    Variation Of Load Settlement Relations Of 25 Steel Pipe Piles Constructed In A Site From Rapid Pile Load Testing

    By Tatsunori Matsumoto

    In order to investigate the variation of the load-displacement relations of piles in a site, vertical load tests were carried out on 25 small diameter steel pipe piles. Out of 25 piles, 15 piles were

    Jan 1, 2006

  • AIME
    Members, Junior Members, Associates and Junior Associates Alphabetical List

    Abbey, Robert Graham, District Mgr., The W. W. Sly Mfg. Co., 50 Church St., New York, N. Y. '21 Abbott, A. N Ave. Morelos 84, Cuernavaca, Morelos, Mexico '23 Abbott, Argyle Campbell, Geol

    Jan 1, 1932

  • TMS
    Treatment of Residues During Aluminum Recycling

    By Ramona Prillhofer

    Salt slag is a waste product produced by the recycling of aluminum. In most European countries (e.g. Austria, Germany) the landfill disposal of this waste is forbidden because the slag contains solubl

    Jan 1, 2009

  • CIM
    Reducing maintenance costs through predictive fault detection (c13d7cbc-4e81-4449-b672-3dadc240a5a9)

    By Y. Faitakis, G. J. Powley, C. Mackenzie

    "In the mining industry, maintenance is a key priority and a major expense. As mining equipment is large in scale, high in cost, and difficult to tow, it is key to maintain equipment on a timely basis

    Jan 1, 2004

  • AUSIMM
    Python Underground Processing Plant Critical Design

    Python Underground Processing Plant Critical Design The use of continuous gravity recovery in combination with a controlled breakage fine crushing and screening system followed by flash flotation has

    Sep 13, 2010