Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Driver Visibility System For Large Mining Trucks - ObjectiveReduce the number of accidents in which large mining trucks crush objects that were not visible to the driver. Approach Improved rear view mirrors, light-bending plastic lenses, and a closed cir
Jan 1, 1979
-
Driving Forward The European Industrial Minerals Industry's Commitment To Sustainable DevelopmentBy S. T. Murray
The European industrial minerals industry and its markets are largely self-sufficient. The companies who are members of the Industrial Minerals Association (IMA-Europe) number around 150 contributing
Jan 1, 2003
-
Driving productivity by increasing feed quality through application of innovative Grade Engineering® technologiesBy S G. Walters
The minerals industry is facing a productivity and investment crisis. The ‘Millennium Super Cycle’ from 2003–2011 was an unprecedented period of growth and investment resulting in increased throughput
Sep 20, 2017
-
Driving the 1,480 Ft Level at the South Mine, Broken HillA drive, 3,500 ft long, was planned to explore mineralization exposed by diamond drilling. A rate of advance of 150 ft per fortnight, approximately double previous Broken Hill rates, was required. Sub
Jan 1, 1965
-
Driving the Twin Bore Running Tunnels by Earth Pressure Balance Machine on the Sound Transit C-710 Beacon Hill Station and Tunnels ProjectBy Chris Tattersall, Tomyuki Kudo, Peter Raleigh, Nestor Garavelli, Steve Redmond, Michael J. Lehnen
Twin bore running tunnels driven approximately 4,500 route feet by a Mitsubishi Heavy Industries (MHI) EPB Tunnel Boring Machine link the West Portal and East Portal on this complex Light Rail Project
Jan 1, 2007
-
Drop Shafts for Narragansett Bay Commission CSO Abatement Program, Providence, Rhode IslandBy Rafael C. Castro, Geoffrey Hughes, Fredrick (Rick) Vincent, Philip H. Albert
Seven pairs of drop and ventilation shafts, between two and nine feet in diameter, will convey combined sewer flow to a 230-foot-deep, 26-foot diameter storage tunnel. This paper will present case his
Jan 1, 2007
-
Drum Hoisting in North America ? Approach to DesignBy Mike Robotham
When RFQ?s are received they often contain detailed technical specifications which suggest a departure from the suppliers own customary approach to the design. Both client and end user are quite right
May 1, 2011
-
Drum Scrubber Design and SelectionA model has been developed for drum scrubbing which allows selection of geometry and power input. Specific aspects considered are: Calculation of total static and operating volumes. Total residence ti
Jan 1, 2004
-
Dry Chemical Process To Magnetize Pyrite And Ash For Removal From CoalBy James K. Kindig
Hazen Research, Inc., has developed a new process for removing pyritic sulfur and ash from coal. Feed coal is contacted with iron carbonyl vapors, Fe(CO)5, at 190°C which puts a thin skin of magnetic
Jan 1, 1976
-
Dry Grinding Experience at the Cortez Gold MineBy Garry Keizer
The Cortez gold mine is located in Lander County, NR, about 130 km (80 miles) southwest of Elko. Cortez Gold Mines (CGM) is a joint venture between Placer Dome US Inc. (60% operator) and Kennecott Cor
Jan 1, 1993
-
Dry processing of magnetic iron ores – addressing cost and environmental issuesBy W Skinner, C G. Kelsey, J R. Kelly
The iron ore industry has reached the end of an unprecedented period of expansion triggered by China’s demand for iron ore. Lower ore prices have led producers to focus on optimising mining operations
Jul 24, 2017
-
Ductsim: The Development Of A Visual Duct Simulation ProgramBy I. J. Duckworth
During the last twenty years computers have be-come widely used to assist with the simulation and design of large scale, primary ventilation systems. However, to date there are few computer programs a
Jan 1, 2000
-
Due Diligence Or Short Shrift: The Depth Of Commercial Feasibility In AcquisitionsBy J. J. Fallon
The subject is "Mergers, Acquisitions and Divestitures in Industrial Minerals, but my remarks could also be applied to new product development, resource development and other new business development
Jan 1, 1990
-
Dulles Corridor Metrorail Extension Project - Tunneling Options for Tysons CornerBy John Rudolf
Metropolitan Washington Airport Authority is currently undertaking the first Phase of Metro?s Extension to Northern Virginia. A wide range of tunnel options was considered for the Tysons Corner segmen
Jan 1, 2008
-
Durability Planning for Underground InfrastructureBy D Wimpenny
Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur
Mar 8, 2011
-
Durban Harbour Tunnel—First Use of a Slurry Tunnel Boring Machine in South AfricaBy Andrew K. hg` Officer, A. L. Griffiths, J. Andrew Hindmarch, Gert Wittneben
Durban Harbour in South Africa is one of the continent’s busiest ports however the harbor entrance is currently too small for the new generation of container ships. There-fore it is to be deepened and
Jan 1, 2007
-
Dust Abatement Activities Within United States Steel Corporation-Coal OperationsBy R. R. Godard
The practice of dust abatement or control is not new to any operation of United States Steel Corporation. This report will review those activities, past and present, within the five operating district
Jan 1, 1967
-
Dust Control at Steep Rock Iron Mines Pelletizing PlantBy P. S. Capper
"Generally speaking, the most intensive efforts at dust control in the mining industry have, in the past, been concerned with underground operations and where uranium ore or high silica material is pr
Jan 1, 1976
-
Dust Control Considerations For Deep-Cut Faces When Using Exhaust Ventilation and a Flooded-Bed Scrubber - Preprint 97-48By R. A. Jankowski
The U.S. Bureau of Mines (USBM) conducted a series of laboratory tests to investigate the effectiveness of using a flooded-bed scrubber with exhaust ventilation in deep-cut faces of up to 12.2 m in le
Feb 24, 1997
-
Dust Control for Coal Handling : Design Considerations and SolutionsBy Henning E. Soderberg, Robert Brien, O&apos
Coal may be the answer to US energy problems, but it also has its drawbacks. If it is crushed, screened, dumped, or moved, the environmental engineer is faced with a dust problem. To control coal d
Jan 10, 1981