Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-165-77 Evaluation Of Experimental And Developmental Communication Systems Used In Underground Coal Mines - Performance Of Trapped-Miner Communication SystemBy P. L. Michael
Several evaluations were made by Modified Rhyme Test (MRT) word lists transmitted through various simulations of the Trapped-Miner Communication System being developed by the U.S. Bureau of Mines. The
Jan 1, 1977
-
OFR-96-79 Normalizing MESA-HSAC (A Mining Enforcement And Safety Administration-Health And Safety Analysis Center) Injury Data For Coal Mine Mobile Equipment OperatorsBy Louis Schaffer
This report characterizes several coal Dine mobile equipment operator populations with respect to age, mine experience, machine operator experience, and training. The information is used to demonstrat
Jan 1, 1977
-
Introduction - The Mission (8dfbdf91-d17b-4b51-baf5-c858392a3f13)When the Organic Act of 1910 established the Bureau of Mines within the Department of the Interior, the Bureau's programs involved only health and safety research and, education, and fuels testin
Jan 1, 1977
-
OFR-104(2)-80 Selective Placement Of Coal Stripmine Overburden In Montana - II. Initial Field DemonstrationBy D. J. Dollhopf
A week-long selective overburden handling dragline op ration was conducted at a strip mine near Colstrip, Montana. The objective of the demonstration was to hvdrologically isolate a saline overburden
Jan 1, 1977
-
OFR-157-77 Evaluation Of The Use Of Air Curtains To Increase Face Ventilation - 1 Introduction And SummaryBy William J. Krisko
This contract final report summarizes the design, fabrication and testing of a "line brattice air curtain" device under Bureau of Mines Contract H0357097. The purpose of this program was to develop th
Jan 1, 1977
-
OFR-145-77 Improvements For Mine Carrier Phone SystemsBy Richard H. Spencer
The purpose of this program was threefold: (1) to identify the symptoms of poor or inadequate performance of trolley carrier phone systems; (2) to assess the root causes of performance difficu
Jan 1, 1977
-
OFR-105-77 Computer Aided Analysis Of Cross-Pit Conveyor SystemsBy C. W. Morris
This study was performed for the U.S. Bureau of Mines. An existing computer simulation of a dragline was modified to simulate a dragline dumping into the hopper portion of a cross-pit conveyor system.
Jan 1, 1977
-
OFR-76(2)-79 Development Of Highwall Mining Equipment (Phase I) Volume IIBy Mandius C. Lundal
This report describes the work done to develop a coal mining machine to increase productivity and recovery from thin seams beyond the highwall, in addition to decreasing the miner's susceptibilit
Jan 1, 1977
-
OFR-3-79 Study Of Noise Sources In A Cross Section Of Taconite PlantsFour taconite plants were studied to establish the extent of hazard to plant personnel which exists based on long-term exposure to noise. The criteria for evaluation include the 90 dBA and 85 dBA summ
Jan 1, 1977
-
OFR-30(2)-80 Microseismic Monitoring Of A Longwall Coal Mine - Volume II - Determination Of Seismic VelocityBy H. Reginald Hardy
This report is Volume II of a three volume final report dealing with the microseismic monitoring of a longwall coal mine. The research presented in Volume II is concerned with the evaluation of field
Jan 1, 1977
-
OFR-140-78 The Remote Working Level MonitorBy Donald J. Keefe
The Remote Working Level Monitor (RWLM) is an instrument used to remotely monitor the Rn-daughter concentrations and the Working Level (WL). It is an ac powered, microprocessor based instrument which
Jan 1, 1977
-
OFR-152-77 Engineering And Economic Evaluation Of New Mining Concepts For Hard Rock Bedded DepositsBy M. Jaffe
The data developed in this study establishes the technical and economic feasibility as well as the improved health and safety characteristics of a novel mining concept. The mining concept is a modifie
Jan 1, 1977
-
OFR-141-77 Heap Leaching Studies On Uranium Ore, Phase IVBy Robert C. Merritt
This report describes laboratory as well as pilot heap leaching investigations of low-grade sandstone ores from Wyoming, New Mexico, and Colorado. Sodium carbonate-bicarbonate solutions containing sod
Jan 1, 1977
-
OFR-30(3)-80 Microseismic Monitoring Of A Longwall Coal Mine - Volume III - Field Study Of Mine SubsidenceBy H. Reginald Hardy
This report is Volume III of a three volume final report dealing in general with the microseismic monitoring of a longwall coal mine. The research presented in Volume III was undertaken as part of the
Jan 1, 1977
-
OFR-48-78 Roof Bolting Hazard Analysis StudyBy J. H. Adkins
The purpose of this research is to identify hazards associated with roof bolting and to make recommendations for procedural and equipment design changes to reduce those hazards. To that end, the proje
Jan 1, 1977
-
OFR-61(7)-78 Coal Mine Electrical System Evaluation Apl Mine Electrical System Load-Flow ProgramBy Lloyd A. Morley
A guide to the development and use of an APL computer program for the analysis of load-flow problems is presented. The program is designed to provide an interactive method of load-flow study to improv
Jan 1, 1977
-
OFR-88-79 Study Of The Human Factors Aspects Of An Automated Continuous Mining SectionBy Robert L. Frantz
This report is a part of the project "Study of the Human Factors Aspects of an Automated Continuous Mining Section". The report covers three phases: Phase I Assessment of the Impact of the Auto
Jan 1, 1977
-
Commodity Data Summaries 1977 - An Up-To-Date Summary Of 95 Mineral Commodities ? AluminumDomestic Production and Use: In 1976, 12 companies operated 31 primary aluminum reduction plants, with 3 firms accounting for 63% of production capacity. Washington, Oregon, and Montana accounted for
Jan 1, 1977
-
OFR-85-78 A Study Of Conveyor Belt Training - Mechanics And ControlsBy George Saliba
This report disucsses the formulation of a mathematical model for the steering of a conveyor belt by a flat return idler and a troughed idler under various loading conditions. Significant parameters a
Jan 1, 1977
-
OFR-2(2)-78 Water Management In Oil Shale Mining - Volume II - AppendicesBy A. Brown
This report details work performed and results obtained in a study of the water management aspects of oil shale mining and retorting in the Piceance Creek Basin. Three specific sites were investigated
Jan 1, 1977