Search Documents

Sort by

  • AUSIMM
    Correcting for the Dilution of Rakes Processed Sequentially from Multiple Mines at the BHP Billiton Iron Ore Newman Joint Venture Operations

    By T J. Howard

    At BHP Billiton Iron Ore operations, run of mine ore from the several Newman Joint Venture (NJV) mines is railed in 12 kt rakes to Port Hedland. Rakes are processed sequentially, with the lump and fin

    Jan 1, 2007

  • AUSIMM
    The Use and Abuse of Feasibility Studies

    By N Cusworth

    The development of a resource project inevitably requires the investigation of a vast range of issues across most engineering disciplines û mining, metallurgical, chemical, civil, electrical, mechanic

    Jan 1, 2007

  • SME
    Construction of the C710 Beacon Hill Station Using SEM in Seattle— “Every Chapter in the Book…”

    By Zephaniah Varley, Satoshi Akai, Richard Sage, Steve Redmond, Mike Murray, Rohit Shetty, Gerald Skalla

    One would be hard pressed to find another project as complex as this one given its configuration, the variety of issues to address and the required construction techniques. Contract C710 is currently

    Jan 1, 2007

  • ISEE
    Journal: Anhydrous Ammonia and Ammonium Nitrate Production Raw Materials for Blasting

    By Ken Tunnel

    In the spring of 2005, the Lake Superior Chapter of the ISEE invited me to speak about raw materials used for blasting, anhydrous ammonia and the effect of this important feedstock on the cost of ammo

    Jan 1, 2007

  • SME
    Program-Wide Geo-Instrumentation Monitoring for the MTA East Side Access Project

    By Dilip I. Patel, Jesus Schabib, W. Allen Mawr, Daniel A. Louis

    East Side Access (ESA) will extend Long Island Rail Road into midtown Manhattan via 11 km of tunnels, a new terminal station and associated rail support facilities. The hard-rock tunneling in Manhatta

    Jan 1, 2007

  • CIM
    Pilot Test Of Emew® Technology Application To Copper Electrorefinery Bleed Streams With High Arsenic Content

    By L. Byszynski

    The results of a three month evaluation of the application of EMEW® technology at the KGHM Glogów II Smelter tank house bleed stream are presented. The current, conven¬tional electrolyte decopperizati

    Jan 1, 2007

  • CIM
    Model for Friction Stir Welding From Piercing/Extrusion

    By H. J. McQueen

    Friction stir welding (FSW) generates complex microstructures in the nugget and thermomechamically affected zones (TMAZ) that have led to diverse explanations. However, consideration as an extension o

    Jan 1, 2007

  • CIM
    Technology and Sustainability - Keys to Unlocking the Next Generation of Copper Projects

    By C. Sartain

    In recent years market pressures have been building on companies to develop the next era of mining projects to follow the previous boom in copper projects of the mid 90's. However the response fr

    Jan 1, 2007

  • CIM
    QemSCAN Characterization of Selected Ore Types for Plant Optimization

    By R. P. Zahn

    The need for quantitative mineralogical data to characterize ore types before they are processed is becoming increasingly necessary. Mineralogical data (modal abundances, grain size, liberation/lockin

    Jan 1, 2007

  • SME-ICGCM
    Evaluation of Support and Ground Response as Longwall Face Advances into and Widens Pre-Driven Recovery Room (94eb68ca-11f6-41ed-b8a6-cb9b52889278)

    By Thomas Barczak

    A cooperative study was conducted with Emerald Coal Resources, L.P., an affiliate of Foundation Coal Corporation, and the National Institute for Occupational Safety and Health (NIOSH) to evaluate the

    Jan 1, 2007

  • SME
    The United States? Role With The International Tunnelling Association

    By Harvey Parker

    The International Tunnelling and Under-ground Space Association (ITA) is a nonprofit organization that represents all aspects of the tunneling and underground space industry worldwide. The United Sta

    Jan 1, 2007

  • SAIMM
    Design And Operating Features Of New 27.6 Mva Furnace At Nava Bharat Ventures Limited, Paloncha

    By Y. Poornachandra Rao, P. C. Sudhakar, L. Malakondaiah

    NBV commissioned a 27.6 MVA furnace in the year 2005. This paper explains: a)Furnace design features b)Furnace process control, Direct slag granulation c)Continuous casting, Waste heat reco

    Jan 1, 2007

  • SME
    Construction of the Big Walnut Augmentation/Rickenbacker Interceptor Tunnel (BWARI, Part 1) —Columbus, Ohio

    By Glen D. Frank, Jeremy P. Theys, Mina M. Shinouda, Gary W. Gilbert

    PURPOSE OF THE PROJECT The Big Walnut Augmentation Rickenbacker Interceptor project began in 1995with the preparation of the Scope of Services for the design of the Rickenbacker Interceptor, with

    Jan 1, 2007

  • CIM
    Copper Smelter Projects: Installation and Operation of Large Kumera Steam Dryers

    By S. L. Chen

    The Kumera Technology Center developed a unique type of steam dryer for drying copper concentrate in the mid 1990s. The dryer has been chosen in several copper smelter projects since 1999. To expand p

    Jan 1, 2007

  • SAIMM
    Alternative To Lime As A Rheology Modifier In The Transport Of Iron Ore Slurry By The Samarco Pipeline

    By T. A. Silva, A. C. Bragança

    Lime has been added to the iron ore slurry transported by the Samarco pipeline since its operation start-up in 1977.Initially, internal corrosion was the main concern therefore the reagent was used on

    Jan 1, 2007

  • SAIMM
    Mineral Resource Throughput Management: From An Iron Ore Mine To Steel In India (b7c708d0-4ac4-4078-9cb8-41844cba4156)

    Mineral Resource Throughput Management is based on the extraction of the maximum potential value from an ore reserve with the emphasis to generate maximum ROI and ROR (return on reserve). A stee

    Jan 1, 2007

  • SAIMM
    Latest Electrode Technology Delivering Improved Electrode Performance In Submerged Arc Furnaces

    By Henk van der Bijl, Sean Rogers, Eugene Sidorski, Alan Carpenter

    The electrode column is the heart of the submerged arc furnace. Superior electrode performance provides improved furnace performance. This paper describes the main features of the electrode column tha

    Jan 1, 2007

  • SME
    Environmental Assessment Study For Extension Of Spadina Subway In Toronto

    By Verya Nasri, Scott Thorburn

    The City of Toronto and the Toronto Transit Commission (TTC) have conducted an Individual Environmental Assessment (EA) for a 6.2 km, 4-station underground extension of the Spadina Subway from Downsvi

    Jan 1, 2007

  • CIM
    A Precise And Accurate Method For Glue Determination In Copper Electrorefining

    By E. Rezaei

    Glue is an animal protein that is used with other organic agent such as thiourea, in copper electrorefining. The concentration of glue has to be controlled carefully, because the electro-deposition pr

    Jan 1, 2007

  • SAIMM
    Lowered Expectations: The Impact Of Yield Stress On Sand Transport In Laminar, Non-Newtonian Slurry Flows

    By R. Sun, R. G. Gillies, R. S. Sanders, J. Schaan

    The pipeline transport of paste, backfill or thickened tailings slurries is an important component of the tailings disposal process in many mines around the world. These mixtures contain significant f

    Jan 1, 2007