Search Documents

Sort by

  • AUSIMM
    Progress in the Knowledge of Granite Cutting with Diamond Wire

    By Manca PP, Lassandro R, Caranassios A, Massacci G, Ciccu R

    The paper discusses the state of the progress reached in the development of the diamond wire tool for cutting hard rocks. To the advances of this relatively new technology a substantial contributio

    Jan 1, 1992

  • AUSIMM
    The Challenges of Selective Mining within the Globe Progress Gold Mine, Reefton, South Island, New Zealand

    By R Cooksey

    The Globe-Progress Mine is an open pit gold mine that is part of the larger Reefton Goldfields deposit located on the West Coast of New Zealand. The regional geology comprises a series of north to sou

    Aug 22, 2011

  • AUSIMM
    Wireframe-Free Geological Modelling – An Oxymoron or a Value Proposition?

    By E J. Cowan

    Efficiency demands that mine geologists devote the most time to tasks where they can have the biggest effect on production. One of the most time-consuming tasks is geological interpretation of the ore

    Aug 22, 2011

  • CIM
    The Critical Path Method and its Application at Mcintyre Porcupine Mines Limited

    By P. O. Parfitt

    The Critical Path Method has proved its usefulness at Mcintyre Porcupine Mines Ltd. This paper illustrates the techniques of network construction and analysis, and the application of the method at the

    Jan 1, 1966

  • AUSIMM
    Suggestions for the AUSIMM

    By AUIMM AUIMM

    Continuous Improvement The Council of the AusIMM should expedite the introduction of a continuous professional education policy along the lines of that to be proposed to you by David Pollard today. T

    Jan 1, 1994

  • AUSIMM
    The Influence of Geology on Blasting Hazards and Results

    By T N. Little

    The aim of any rock breaking activity is to achieve success by developing designs that are blasting objective-specific and geology-specific, and then implementing such designs. This paper targets mini

    Aug 22, 2011

  • AUSIMM
    Scientific and Technological Developments in Extractive Metallurgy - Copper and Nickel Extraction

    By Flavelle IV

    A survey is made of changes in the technical status of a number of western world copper extraction and refining operations over the past 20 years. Specific developments in pyro- and hydro-metallurgy a

    Jan 1, 1985

  • SME
    Thermal fragmentation as a possible, viable, alternative mining method in narrow-vein mining?

    By Larissa Koroznikova, Steve Durkin, Patrick Bouwmeester, Michael Tuck

     This research project explored the viability of a new mining technology — thermal fragmentation — in narrow-vein mining. Thermal fragmentation technology uses a flame jet to produce extreme heat that

  • AUSIMM
    Rosedale Outfall Project – Overcoming Extreme Conditions

    By T Ireland

    The Rosedale Outfall Project utilised an earth pressure balance (EPB) tunnel boring machine (TBM) for only the second time in Auckland. Although the tunnel was excavated fully through East Coast Bays

    Mar 8, 2011

  • AUSIMM
    The Wonawinta Silver Project – Value Engineering at Work

    By P G. Greenhill

    The Wonawinta silver project near Cobar in NSW is under development by Cobar Consolidated Resources Limited (CCR). RMDSTEM Limited is part of the owner’s team for feasibility, design, engineering, con

    Aug 8, 2011

  • CIM
    The Process Mineralogy of Precious Metals in Laronde Flotation Products and Its Effect on Process Optimization

    By P. -A. Bosse, J. Robitaille, P. Blatter

    The LaRonde ore is a Cu-Zn-Pb ore with gold (3-4 g/t) and silver (60-100 g/t). The precious metals are recovered with copper concentrate, zinc concentrate and cyanidation of zinc tails via Merrill Cro

    Jan 1, 2005

  • SME
    Retrofitting and repowering as control strategies for the curtailment of exposure of underground miners to diesel aerosols

    By Jon A. Hummer, Aleksandar D. Bugarski, Shawn Vanderslice, Teresa Barone

    Reducing the contribution of heavy- and light-duty diesel-powered equipment to concentrations of aerosols and gases is essential to industry’s efforts to improve air quality in underground mining oper

  • AUSIMM
    The Use of Integrated Web-Based Solutions in Productivity Improvement

    By P Cooper

    Continuous improvement using six sigma methodologies commonly follows the DMAIC methodology of define, measure, analyse, improve and control. A key requirement in the use of this approach is to ensure

    Jul 11, 2011

  • SME
    Stability mechanism and control technology for fully mechanized caving mining of steeply inclined, extra-thick seams with variable angles

    By Hongwei Wang, PEIPEI CAO, Yongping Wu, JIANQIANG JIAO

    In the fully mechanized top caving mining of steeply inclined, extra-thick seams with variable angles, the mechanisms of roof rock movement, failure, caving and filling are highly complex. This is due

  • AUSIMM
    Training our New Starters – Between a Rock and a Hard Place

    By M Davis

    Increasing growth in the minerals industry over the past decade has raised the question of whether the standard of training for new geologists has been negatively impacted. This hypothesis was tested

    Aug 22, 2011

  • AUSIMM
    ROES® – Automated Rock Extraction

    By I Gipps

    A vision of what the future mine involves all aspects of mining, ie orebody access, ore stoping, material transport, processing and waste material disposal. This paper examines one aspect of the futur

    Nov 22, 2011

  • SME
    Toward an understanding of the use of disodium carboxymethyl trithiocarbonate (DCMT) as an alternative depressant in Cu/Mo sulfide flotation

    By PEILIN LAN, LEONARD HILL, SIMON TIMBILLAH, BERNARD FOSU, CESAR SOSA-BLANCO

    The use of sodium hydrosulfide (NaHS) in most of the operations in byproduct molybdenum flotation comes with safety concerns and, in some instances, a high reagent cost. Engineered solutions at the va

  • AUSIMM
    The Importance of Data Collection to the Blasting Process

    By J Hutchings

    An essential component to the management of any process is the measurement of key parameters, used to monitor, control, and provide the feedback necessary for improvement. This paper discusses how dat

    Nov 8, 2011

  • AUSIMM
    The AMC Narngulu Synthetic Rutile Plant

    By Rolfe PR, Ellis BA, Clements RJ

    Associated Minerals Consolidated Limited (AMC) is constructing a 112,500 tonne/yr synthetic rutile plant at Narngulu, near Geraldton in Western Australia. Design of the plant is based on the techn

    Jan 1, 1986

  • AUSIMM
    The Palaeoproterozoic Warramunga Formation, Tennant Creek Block, Central Australia: Sedimentology, Geochemistry and Provenance

    By N Donnellan

    The Palaeoproterozoic Warramunga Formation is notable as the host to the enigmatic, so-called 'Tennant Creek style' mineralisation. These polymetallic (but mainly Au-Cu-Bi) ore deposits t

    Jan 1, 1994