    Float it, Clean it, Depress it – Consolidating the Separation Stages at Clarabelle Mill

    By V Lawson

    Vale’s Sudbury Clarabelle Mill processes Cu/Ni ores from a number of mines in the Sudbury basin in Ontario, Canada. Bulk sulphide flotation produces a copper-nickel concentrate with pyrrhotite as the

    Aug 8, 2011

  • AUSIMM
    Jacked Box Versus Cut and Cover Technique for the Pedestrian Underpass Construction in Brisbane

    By A Purwodihardjo

    Evaluation of the construction method used for the pedestrian underpass construction at Ipswich Road, Brisbane, Australia is presented in this paper. The pedestrian underpass was constructed through t

    Mar 8, 2011

  • AUSIMM
    Development Options for the Eyre Peninsula Magnetite – An Owner’s Perspective

    By J White

    The Eyre Peninsula (EP) has been known for its iron ore for more than a century. Edward John Eyre noted the ironstone outcrop at what is now Iron Knob in the 19th century. Sir Douglas Mawson visited a

    Jul 11, 2011

  • AUSIMM
    Monitoring of Erosion Risk in Surface Mining Area using a Satellite Image and Geographic Information System – A Case Study in the Indonesia Coal Mining Area

    By S Maryati

    Surface mining activities disturb large areas, produce great sediment loads and tend to be a source of water pollution if they are not managed properly. Coal mining in Indonesia has a very high risk o

    Nov 22, 2011

  • AUSIMM
    Design of Grade Control Sampling Programs for Underground Gold Mines

    By S C. Dominy

    Grade control programs aim to deliver economic tonnes to the mill via accurate definition of ore and waste. The foundation of a successful program is high quality sampling supported by geology and a s

    Aug 22, 2011

  • AUSIMM
    Melbourne Main Sewer Project – Construction Phase – Soft Ground Tunnelling in the Yarra Delta

    By P Clark

    This paper discusses the challenges, solutions and lessons learnt as tunnelling work continues on the Melbourne Main Sewer Replacement (MMSR) project.The MMSR project is a $220 million dollar project

    Mar 8, 2011

  • SME
    Evaluation index system of green surface mining in China

    By QINGXIANG CAI, Lin Li, PENG LIU, IZHAR MITHAL JISKANI, XIANG LU, Wei Zhou, YONGLI ZHOU

    Green mining is the latest technological advancement to reduce mining’s environmental impact with minimal energy and resource consumption. Green mining — aimed at protecting nature and providing socio

  • CIM
    Controlled Precipitation of Nesquehonite (MgCO3.3H2O) by the Reaction of MgCl2 With (Nh4)2CO3 At 303 K

    By Y. Wang

    In this study, homogeneous (unseeded) precipitation of nesquehonite (MgCO3.3H20) by the reaction of MgC12 with (NH4)2CO3 in supersaturated solutions at 30 °C was investigated. Factors which influence

    Jan 1, 2007

  • SME
    Influence of Air Gap Volume on Achieving Steady-State Velocity of Detonation Mining, Metallurgy and Exploration

    By Eugie Kabwe

    The velocity of detonation (VOD) is a significant property considered when rating an explosive. It may be quantified as a confined or unconfined velocity. The confined velocity is the rate at which th

  • SME
    Empirical approach-based estimation of charge factor and dimensional parameters in underground blasting

    By VIVEK KUMAR HIMANSHU, PK SINGH, AK MISHRA, MP ROY, RAVI SHANKAR

    Underground blasting has many challenges. The primary aim of blast designers is to optimize drilling and blasting parameters to deal with the associated challenges. Optimizing these parameters is curr

  • AUSIMM
    Improving Safety and Production – The Transition to Electronic Detonators at George Fisher Mine

    By M Breen

    In 2009, George Fisher mine began to seriously consider the transition from pyrotechnic detonators to electronic detonators. Initially, the electronic detonators were used for complex crown shots or a

    Nov 8, 2011

  • AUSIMM
    Mining Reconciliation in Long Hole Open Stopes at George Fisher Mine

    By J J. Grobler

    The George Fisher Underground Mine at Mount Isa applies the long hole open stoping methodology. During the reconciliation process of transverse stopes in the George Fisher North mine it was identified

    Mar 21, 2011

  • TMS
    Experimental Study on the Influence of Vacuum Carbonitriding Process for 20Cr2Ni4A Steel

    By Yingtao Zhang, Shaofeng Du, Yiming Rong, Wenjun Zhao, Gang Wang

    "20Cr2Ni4A steel is a kind of high quality steel mainly used for manufacturing high-duty gears in the world. The high-duty gear with good performance must have wear and fatigue resistance properties.

    Jan 1, 2014

  • AUSIMM
    CSIRO Augmented Reality Remote Guiding Platform for the Mining Industry

    By L Alem

    In the field of mineral extraction, complex technologies are being introduced in mines, operators/technicians rely on assistance from an expert (or more) in order to keep their machines functioning. P

    Nov 22, 2011

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011

  • SME
    Experimental and Numerical Investigations of the Fluid Flow in a Hydroclyclone with an Air Core Mining, Metallurgy and Exploration

    By Chinmay Shingote, Robert Visintainer, Renjie Ke, Jaikrishnan R. Kadambi, John Furlan

    Hydrocyclone separators are widely used in various industrial applications in the oil and mining industries to sort, classify, and separate solid particles or liquid droplets within liquid suspensions

  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    Fast, Safe and Fully Mechanised Installation of High-Tensile Chain-Link Mesh for Underground Support

    By V Louchnikov

    Ever increasing depth of mineral extraction presents a challenging environment for hard rock underground mines. High in situ stresses and associated seismicity with potential rock burst hazards are th

    Mar 21, 2011

  • AUSIMM
    Innovative Beneficiation of Iron Ore Fines with allflux® Two-Stage Fluidised Bed Classifiers and gaustec® Wet High Intensity Magnetic Separators

    By A Horn

    Mineral processing is characterised by a constant adaptation to changing raw materials and market conditions. It is the link between the mined raw material and a marketable product. As a lot of high-g

    Jul 11, 2011

  • AUSIMM
    Engaging Society about a Potential Mining Future – Concerns and Expectations

    By N Boughen

    This paper synthesises the findings of five studies undertaken by the CSIRO Wealth from Oceans Flagship in 2009-10. This research explores the concerns, expectations, and information needs of a range

    Nov 22, 2011