Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Object Based Quantitative Analysis of Complex Multiphase Microstructures in SteelBy Martin Fischer
A new method for the quantitative image analysis of complex microstructures in steel is presented. Microstructures in modern steel grades on the one hand become more and more complex while on the othe
Jan 1, 2009
-
OFR-103(2)-79 Control Of Vibration And Blast Noise From Surface Coal Mining - Volume IIBy John F. Wiss
A series of controlled experiments was conducted at four surface coal mines to study the effects of certain blast parameters upon the ground and air vibration. Preliminary scale-model blasts were cond
Jan 1, 1978
-
Kosciuszko Bridge Main Pylon Deep Foundation SolutionBy A. Daugiala, D. Coleman
In 2014 the New York State Department of Transportation (NYSDOT) awarded a Design-Build contract to the joint venture team consisting of Skanska which is the managing partner; Kiewit Corporation and E
Jan 1, 2016
-
Laboratory Modeling of Internal Erosion in Dam FoundationsBy Kenneth E. Henn, David B. Paul, John D. Rice, Brian H. Greene
"Several laboratory modeling programs have been conducted to investigate the mechanisms associated with internal erosion of dam embankments and foundations. The investigation consists of developing l
Jan 1, 2016
-
Laboratory Test on the Effect of Risk Mitigation Measures against Earthquake for Existing Rock TunnelBy Nobuharu Isago, Atsushi Kusaka, Kosuke Kawata
"Strong earthquakes occur frequently in Japan, and some rock tunnels have sustained severe damages on their permanent lining. Many road tunnels, which were constructed by conventional steel arch suppo
Jan 1, 2016
-
Large Diameter Helical Piles for Refinery ExpansionBy Chris Normand, Paul Volpe, Eric Wey, Howard Perko, Burt Ogilvie, Patrick Murray
"A refinery expansion project for Marathon Petroleum Company in Southern Louisiana required existing medium to large pipe racks to be expanded for additional capacity. Foundation modifications were ne
Jan 1, 2017
-
Large Diameter Open-End Pipe Pile Driveability Analysis Including Geotechnical Friction FatigueBy Patrick J. Hannigan, Frank Rausche, Rozbeh B. Moghaddam
Large diameter open-end pipe piles are increasingly used as deep foundations to support heavy onshore and offshore structures. During the driving process, several factors such as subsurface conditions
Jan 1, 2019
-
Large Scale Geotechnical Works on Norways Largest Infrastructure ProjectBy Brandon M. Robinson, Osman F. Besler, Dominik Gaechter
With the increase in population over the last decade, and anticipated population growth over the coming years, Norway is making significant investments in the Country’s infrastructure. Part of this in
Sep 8, 2021
-
Lateral Pressure Relief by Geotextile Encased Columns (GECs) at Piled Bridge Abutments: Two Case StudiesBy Sven Schröer, Lilma Schimmel, Dimiter Alexiew
"The Geotextile Encased Columns (GEC) deep foundation system for embankments on soft soils was introduced some 20 years ago and is now considered State-of-the-art worldwide.The GECs consist of compact
Jan 1, 2016
-
Lateral Stresses On Multilevel Tieback WallsBy Liiban A. Affi
The most difficult task of designing multilevel tieback walls for deep excavation support is the determination of lateral stresses. These lateral stresses act not only on the shored height, but also
Jan 1, 2010
-
Leading Practice Water Management at Moranbah North Underground MineBy D Yates, C C(te, M Rodgerson
This paper describes how specific technical and regulatory issues related to water management have been dealt with at Anglo AmericanÆs Moranbah North mine. It compiles the collection of practices that
Nov 26, 2013
-
Levee Rehabilitation, Lower Wood River Phase II– East Alton IL. Deep Cutoff WallBy Gene Bryant, Wesley Schmutzler, Matteo Bertoni
The levees where the Mississippi River and the Lower Wood River meet near East Alton Illinois have been a problem area for years due to underseepage. The first phase of the deep cutoff wall was a 2,00
Jan 1, 2019
-
Level Crossing Removal Project – Package 1By Andrew Middleton, Mick Stadter, Chris Crowe, David Chong
"The Level Crossing Removal Project – Package 1 is part of the Victorian Governments commitment to remove 50 of the most dangerous and congested level crossings across Melbourne. This involved removin
Jan 1, 1900
-
Linking the Installation Response of Screw Piles to Soil Strength and Ultimate CapacityBy James P. Hambleton, Sam A. Stanier
A perceived advantage of screw-type foundations is the ability infer aspects of foundation performance from quantities measured or observed during installation, especially the installation torque. A p
Jan 1, 2019
-
Liquefaction Susceptibility Evaluation using Site-Specific Seismic Demands in the San Jose AreaBy Martin Walker, Joseph Ang, Jongwon Lee, Alvin Bayudanto, Lilian Lorincz, Morteza Khorshidi, Wenyong Rong
This paper presents a case history of liquefaction susceptibility evaluation study for a major infrastructure project in the San José area. The subsurface material of the study area consists of Holoce
Sep 8, 2021
-
OFR-100(4)-77 Design And Development Of A Machine Familiarization Trainer For Dragline Operators - Appen A: Program Of Instruction-Modules 10-17 - Appen B: Instructional Time Breakdowns - Phase II Report ? Appen A (Continued) Program Of Instruction[Module 10. Internally Cued Operating Contingencies Prerequisite: Modules 1-7 - Estimated Instructional Time: 2.42 hrs. Module Abstract Trainees, using programmed instruction, describe the cues
Jan 1, 1976
-
Micropiled Foundations of Telecommunication TowersBy Racquel Nottingham, Marc Mastrantuono, Freddy Lopez
In the digital era that we live in, connectivity and mobility play a decisive role in our daily activities. In this context, insufficient telecommunication infrastructure gives origin to the so called
Sep 8, 2021
-
Micropiles in an Urban Setting – TBTA Verrazano Narrows Bridge HOV/BUS Ramps, Brooklyn, NY and Nysdot Kosciuszko Bridge Replacement, Brooklyn, NYBy M. D. Riegel, Brian T. Felber
"Construction of foundation elements in an urban environment is often complicated by multiple constraints such as existing foundations, utility conflicts, maintenance and protection of traffic on high
Jan 1, 2016
-
Microscale Characterisation of Pristine and Processed Ore - Implications for Leaching Calcrete-Hosted Uranium OreBy M I. Pownceby, A Torpy, C Johnson, N C. Wilson
To extract uranium from low-grade, calcrete-hosted uranium (CHU) ore is challenging owing to the presence of carbonate and swelling clay gangue minerals that require an alkaline lixiviant to be used.
Sep 29, 2013
-
Microstructure and Creep Behavior of Casting and Rolling GH4169 Superalloy after Long-term AgedBy Tian Sugui
By means of the long-term aging treated, creep properties measuring and microstructure observation, an investigation has been made into the microstructure and creep behavior of the casting and rolling
Jan 1, 2009