    Overcoming Constructability Challenges for Drilled Displacement Pile Installation in Difficult Geology

    By A. Rod Kern, Michael A. McNicholas, Yaser Taheri

    Deep foundations were required for construction of an 18,000 ft2 (1,672 m2) 4-story office building and an adjacent 23,750 ft2 (2,206 m2) 5-story parking garage in Queens, New York due to an existing

    Jan 1, 2019

  • AUSIMM
    Overcoming Mine Design and Production Challenges at the Sinclair Underground Nickel Project

    By M J. Ireland, D P. Horne, S J. Simpson

    The Sinclair Nickel Project, wholly owned by Xstrata Nickel Australasia (XNA), includes an underground mine, a concentrator, a village, an all-weather airstrip and associated mine infrastructure. The

    Mar 26, 2012

  • AUSIMM
    Oxygenation System Upgrades and Leach Plant Performance Improvements at Morila Gold Mine - 2009 to 2012

    By D M. Verster, P L. Gillot, A Kone

    Randgold ResourcesÆ MorilaÆs gold leach plant is subjected to uncommon æoxygen stressesÆ. Feed ores exhibit very high oxygen demands, primarily caused by iron sulfides. In addition, ore oxygen demand

    Sep 26, 2013

  • DFI
    p-y Curves For Analyzing Micropiles in Sandy Soils Using Lateral Load Test Data

    By Mahdi Soudkhah, Akhter Hossain

    Vertical micropiles are generally considered to be low in lateral resistance. Therefore, battered micropiles are often used when additional lateral load carrying capacity is required. However, batteri

    Jan 1, 2019

  • NIOSH
    Proceedings: Mechanics And Mitigation Of Violent Failure In Coal And Hard-Rock Mines

    Papers presented at a U.S. Bureau of Mines (USBM) technology transfer seminar describe the causes of violent material failure in U.S. mines, measurement techniques for monitoring events that result in

    Jan 1, 1995

  • IMMS
    Prospectivity Modeling Of Seafloor Massive Sulphide (SMS) Deposits In The Kermadec Arc And Colville Ridge Regions, New Zealand

    By C. Wildman

    Prospectivity modeling of seafloor massive sulphide (SMS) deposits has been completed over the Kermadec Arc-Colville Ridge area using the GIS based weights of evidence and fuzzy logic modeling techniq

    Jan 1, 2011

  • DFI
    Protection of Waterfront Properties by Pressed-In Sheet Pile Seawalls

    By Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa

    "This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco

    Jan 1, 2016

  • DFI
    Pullout Capacity of Pile Groups in Sand

    By S. P. Mukherjee, Smita Tung

    "Piles are generally subjected to uplift in case of under ground and water front structures. Sometimes piles are also to resist uplift loads in transmission towers, dry rock, and so on. Experimental i

    Jan 1, 2015

  • TMS
    Pullout Tests of Curaua Fibers in Epoxy Matrix for Evaluation of Interfacial Strength

    By Sergio N. Monteiro

    The interface between the matrix and the reinforcing fiber plays an important role in the efficiency by which an applied load is transmitted through the composite structure. The shear stress at the fi

    Jan 1, 2009

  • TMS
    Purification of Oil-Contaminated Soil by Flotation

    By Georgios N. Anastassakis, Nickolaos Georgiou

    "Soil contamination by oil as well as by other organic pollutants poses a major problem to the environment. Various methods have been used to remove organic contaminants from soil, such as: biological

    Jan 1, 2008

  • DFI
    Quality Assessment of Seismic Data Sets and the Impact on Interval Velocity Estimates in DST

    By Gerald Verbeek, Erick Baziw

    "Downhole Seismic Testing (DST) is an important geotechnical testing technique for site characterization as it provides low strain (<10-5) in-situ interval compression (Vp) and shear (Vs) wave velocit

    Jan 1, 2017

  • DFI
    Quality Control and Testing of Jet Grouting and its Interpretation in Relation to the Christchurch Town Hall Restoration Project.

    By David Chadwick, Paul Marsden, Chris Hughes, Mathias Delapille

    "Following damage caused by the 2011 Christchurch earthquakes, the NZ$127.5million Christchurch Town Hall Restoration project is due for completion in 2018. The building is undergoing extensive repair

    Jan 1, 1900

  • TMS
    Quantification of the Mineral Phases in Iron Ore Sinters From Gray Historgram of Micrograph

    By Xuewei Lv

    An intelligent recognition and quantification system for the micrographs iron ore sinter was developed in the current paper. The average distribution parameters in a gray histogram of minerals by a Ga

    Jan 1, 2009

  • CIM
    Quantifying the Effects That Changes in Transmitter-Receiver Geometry Have on the Capability of an Airborne Electromagnetic Survey System to Detect Good Conductors

    By C. Samson, R. S. Smith, S. W. Hefford

    "Abstract - Time-domain electromagnetic systems are most sensitive to highly conductive targets during the transmitter on-time. Data collected during the on-time is highly influenced by the geometric

    Jan 1, 2006

  • DFI
    Radium Hospital Project in Oslo, Norway.

    By Dominik Gächter, Wojciech Szczepiñski

    In early 2020, the construction phase began for the new complex of buildings for Radium Hospital in Oslo – the leading facility for cancer treatment in Norway. Settlements in the surrounding area, cau

    Sep 8, 2021

  • NIOSH
    OFR-94-77 Study Of A Water Jet Continuous Coal Mining System

    By P. J. G. du Toit

    Coal has been mined by hydraulic means in various countries, i.e., the hydraulic excavation as well as the hydraulic transportation of coal has been practiced. The hydraulic breaking (excavating) of t

    Jan 1, 1977

  • AUSIMM
    Particle Dissolution in the Chemical Regeneration of the Ceramic Filter Medium used for Magnetite Dewatering

    By B Ekberg, R Salmimies, T Kinnarinen, A HSkkinen

    The regeneration of the ceramic filter medium used in iron ore dewatering is often done by combining backwashing, ultrasonic cleaning and chemical regeneration. Of these three, the first two are appli

    Aug 12, 2013

  • IMMS
    Pelagic Sediments Associated With Polymetallic Nodules In The Clarion Area Fracture Zone

    By Marlene Olivares Cruz

    The particles that make up the deep-sea sediments have two main sources: 1) those that are created in situ from dissolved components and 2) those that are washed into the ocean in solid phases from th

    Jan 1, 2011

  • IMMS
    Pelagic Sediments Associated with Polymetallic Nodules in the Clarion Area Fracture Zone (0561cd29-9a1e-44e4-ad6d-1907506df123)

    By Marlene Olivares Cruz

    The particles that make up the deep-sea sediments have two main sources: 1) those that are created in situ from dissolved components and 2) those that are washed into the ocean in solid phases from th

    Sep 14, 2011

  • DFI
    Performance Monitoring for Deep Excavations

    By Alexi J. Neill

    "This presentation will showcase two challenging projects with deep excavation support systems in the Atlanta area where state-of-the-art instrumentation and monitoring systems were used to manage ris

    Jan 1, 2016