    The role of the regulator in promoting a highly reliable mining industry

    By S Johnston, L Howe, S Stevens

    Regulators have an important role to play in fostering and enabling reliable, effective, environmental management. Given this, it is perhaps surprising that there has been relatively little debate on

    Aug 2, 2023

  • AUSIMM
    Unlocking value chain optimisation with a digital mining system

    By S Gulati, N Sarkar, T Vink, S Battersby, L Okada

    This paper examines a successful project implemented by BHP Mitsubishi Alliance (BMA) and the Polymathian team at Deswik, aimed at enhancing short-term scheduling processes to reduce vessel turn times

    Sep 1, 2024

  • AUSIMM
    The hidden path to sustainable mining – an incentive for transforming scope 3 emissions across industries

    By K Sherry, N Shahbazi

    Scope 3 emissions are a set of often overlooked indirect greenhouse gas emissions within a company’s value chain and represent the majority of emissions for many sectors. These emissions arise from ac

    Sep 1, 2024

  • AUSIMM
    Visualising risk – proactive is better than reactive

    By S Withell, K Sheehan

    Whitehaven Coal (WHC) is undergoing a transformative journey, deeply committed to the principles of a High Reliability Organisation (HRO) and the establishment of a mature, interdependent culture foun

    Apr 16, 2024

  • AUSIMM
    Above and beyond NPV – determining the life-of-mine from an economic perspective

    By C Tapia, B Hay

    There is a close relationship between the mining industry, economic growth, and technological and social development. Mining activities benefit all economic agents, but only during a timespan determin

    Aug 2, 2023

  • AUSIMM
    Cayeli Mine journey to become a safer mine with an innovative approach – Think! Safety Program

    By S Flanagan, M M. Mete, A R. Tiryaki, M Guresci

    First Quantum Minerals (FQM) operates the Cayeli underground copper mine in Turkey. In response to a lost time incident (LTI) that occurred at the mine in 2022, the mine management decided to introduc

    Apr 16, 2024

  • AUSIMM
    Alternative mineral processing strategies for copper-gold tailings management

    By C Antonio, R Narayan, A Scheuermann, S Quintero, M Edraki, M Ziemski

    Tailings are mostly loose material and can be classed as non-plastic sandy silts. They also tend to have low permeability, resulting in slow consolidation (settling) rates and low shear strength, even

    Aug 2, 2023

  • AUSIMM
    Case studies illustrating the role of F-series mine reconciliations in production forecast improvement initiatives

    By S J. Loach

    F-Series reconciliations are formal comparisons of estimates and measurements of ore quantity and quality made at pre-determined points along the mining value chain. F1 is the ratio of ‘Depleted Grade

    Sep 18, 2023

  • SME
    Application of Post-Tensioning in TBM Tunneling: Case Study of JWPCP Effluent Outfall Tunnel Project in Los Angeles, USA - NAT2024

    By I. Abdullayev, M. Soberano Capistran, J. Garcia

    The application of post-tensioning in segmental structures was introduced in the early 1900s and has been successfully applied in different types of structures including immersed tunnels, bridges, bui

    Jun 23, 2024

  • SME
    Automation in Segmental Tunnel Lining Design: Case Study of the Northside Interceptor Tunnel Project (NSIT) - NAT2024

    By Irwan Halim, Bhoshaga Mitrran Ravi Chandran, Kevin Huynh

    Tunnel segmental lining design constitutes a significant iterative process where modeling and numerical analysis are factors in deciding the number of segments, their dimensions, gasket placements, as

    Jun 23, 2024

  • SME
    Risk Mitigation for the Big Walnut Sewer Tunnel Construction in Columbus, Ohio - NAT2024

    By Rob Herr, Irwan Halim, Heather Marsh

    This project will expand sanitary sewer within the City of Columbus. It consists of 2.5 mile long, 72-inch finished diameter pipe grouted inside 10.8-foot diameter tunnel excavation in shale. This pap

    Jun 23, 2024

  • SME
    Value Engineering for the Shoreline Consolidation Sewer: An Example of Collaboration Between Owner, Engineer, and Contractor - NAT2024

    By Colin Irwin, Adrian Naranjo-Castillo, Christopher Petta, Eric Zarobila

    The Shoreline Consolidation Sewer is a CSO control project in Cleveland, Ohio that requires the installation of 5,000 feet of 72-inch inside diameter pipe using microtunneling methods. After award, th

    Jun 23, 2024

  • SME
    Influence of Early Ring Closure of Center Drift on Main Tunnel Excavation Under High Overburden Conditions - NAT2024

    By Sadatoshi Ohmori, Simin Zhai, Devini Abeyawardena

    A road tunnel is planned to be constructed in soft, high overburden ground of around 600 m in Japan by using the center drift advancing method. The dodging effect and early ring closure of the center

    Jun 23, 2024

  • SME
    XXL Pipe Jacking: Technological Aspects of Large-Diameter and Long-Distance Drives - NAT2024

    By Peter Schmäh

    Pipe-jacked tunnels are considered for a large variety of applications from water and sewage, cable ducts to challenging pipeline crossings or landfall construction. In most cases, Slurry MTBMs are us

    Jun 23, 2024

  • SME
    Determining Tunnel Clearance by Automating 3D Mobile Laser Profile Data - NAT2024

    By Ali Hafiz, Rich McCafferty, Chris Blanchard, Kaz Tabrizi, Kevin Ruston, Joseph Rigney, Mike Keville, James Dorta

    Many existing tunnels have deteriorated as they age, requiring a massive amount of investment for their rehabilitation. The tunnel of interest in this paper is being rehabilitated by adding precast co

    Jun 23, 2024

  • SME
    Lessons Learned from Larger Diameter Waterview Road Tunnel to Smaller Diameter CRL Rail Tunnel in Auckland, New Zealand - NAT2024

    By Matt Bilson, Ritesh Mahajan, Antoni Kuras, Wataru Okada

    The Waterview Tunnel comprises twin 2.4 km long 13.1 m internal diameter three lane road tunnels in Auckland, New Zealand. The City Rail Link (CRL) is a 3.45 km long, 6.24 m internal diameter twin rai

    Jun 23, 2024

  • SME
    TBM Tunneling Between the Westridge Marine Terminal and the Burnaby Terminal in British Columbia - NAT2024

    By Jeff Reid, Mohamed Maghari, Nicholas Joens

    The Burnaby Mountain Tunnel was an integral part of the Trans Mountain Expansion Project. General Contractor, Kiewit Ledcor TMEP Partnership (KLTP), contracted with McNally Construction to build an un

    Jun 23, 2024

  • SME
    Quality Control of Deep Bedrock Tunneling in Urban Areas: A Case Study of Louisville MSD’s Ohio River Tunnel - NAT2024

    By Jacob Mathis, Mark Bradford, Alston Noronha, R. M. True

    In June 2022, Louisville MSD completed a 6.5-km (4.0-mi), 6.1-m (20-ft.) diameter CSO conveyance and storage tunnel system located along the Ohio River in downtown Louisville, Kentucky. For large diam

    Jun 23, 2024

  • SME
    Extended Application Ranges for EPB-Shields in Coarse-Grained Soils, the Lower Olentangy Tunnel Project Case History - NAT2024

    By Elisa Comis, David Chastka, Miriam Piemontese, Maria Chastka

    The Lower Olentangy Tunnel (LOT) Project involves the construction of a 17,000 ft (5,200 m) long, 12 ft (3.65 m) internal diameter Combined Sewer Overflow (CSO) tunnel. The tunnel is excavated by usin

    Jun 23, 2024

  • SME
    Sumner Tunnel Rehabilitation - NAT2024

    By Joe Rigney, Conrad Stacey, David Nowak, Chris Blanchard, Michael Beyer, John Czach

    Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both de