TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
Flow Control in Tunnels - NAT2022By Darold Woodward, Stefan Haydn, Petr Pospisil
Most fatalities in tunnel fires are caused by the spread of toxic smoke. Controlling the spread of smoke is crucial to provide a survivable environment for emergency egress. A properly designed and tu
Dec 1, 2022
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021By J. Rostami, P. P. Nelson, A. Khetwaln
Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in
Jun 13, 2021
-
Design of Precast Segmental Tunnel Lining in a Design‑Build Environment - RETC2021By David Mast, Irwan Halim, Seung Han Kim
Nowadays more infrastructure tunnel projects are procured using design-build method. In this environment, the Owner’s engineer would typically provide performance requirements for the design-builder,
Jun 13, 2021
-
Keep ’Em Separated—Managing Contract Interfaces for the Westerly Storage Tunnel (WST) - NAT2022By Ryan P. Sullivan, Ben D. DiFiore, Robert J. Auber, Michael A. Piepenburg, Lisa M. Smiley
Pollution to Lake Erie will be significantly reduced by the Westerly Storage Tunnel (WST) system, which is mainly comprised of a 10,000-ft long tunnel and a dewatering pump station in the downstream t
Dec 1, 2022
-
Tunnel Lining Design in Active Fault Zone: Case Histories and Innovations - RETC 2021By Peter Chou, Pooyan Asadollahi, Danny Lin
To maintain flexibility and ductility of tunnels crossing active faults, various mitigation measures are being utilized depending on fault offset movements and seismic design criteria. Examples of tho
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021By Arash Dahi Taleghani, Pooyan Asadollahi
Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr
Jun 13, 2021
-
Risk management for mining projectsBy T Atkinson, A Cobb, R AJIington
Risk management is concerned with the whole spectrum of financial, geological, engineering, legal, governmental, social and occasionally ethnic issues, concerned with mining projects. The inherent ris
Jan 5, 1996
-
Mining design software - a critical reviewBy G. B. Hooper, G. A. Ferguson
The technical capabilities and user-friendliness of the major computer-aided mining design software systems are reviewed. Recent experiences with three systems are outlined to indicate the practical
Jan 12, 1992
-
E-Power Pipe®: Two-Stage Trenchless Method for Long Drives in Small Diameters - NAT2022By Peter Schmäh, Tobias Engel
The E-Power Pipe technology was originally developed for the trenchless installation of protective pipes and pipelines of 10" to 28" diameter, over long distances of more than 4,000 ft. The twostage p
Dec 1, 2022
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021By Josh Willhite, Seth Pollak, Ben Seling
The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o
Jun 13, 2021
-
Advance Rates in Soft Ground Tunnelling - RETC2021By Dan Ifrim
Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi
Jun 13, 2021
-
Advances in drilling technologyBy Mohammed Ali Shah, Martin Waller
The mining industry depends to a large extent on the availability of high performance equipment. For drilling this means a requirement for well engineered, reliable machines with mechanised handling a
Jan 12, 1992
-
Influence of material properties on high-temperature zone reactions in sintering of iron oreBy L. T. Matthews, C. E. Loo, R. P. Williams
The behaviour of iron ores and fluxes in the high temperature zone of a sintering bed is extremely complex. Following a review of current knowledge, an attempt is made to define relevant terminology t
Jan 4, 1992
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Updating the GBR Gold Book - NAT2022By David Hatem, Paul Madsen, Daniel Adams, James Morrison, Randall Essex
Managing commercial risks associated with subsurface construction may be the greatest challenge the underground industry faces. The Geotechnical Baseline Report (GBR) was developed in the U.S. to help
Dec 1, 2022