Search Documents

Sort by

  • NIOSH
    Bulletin 107 Prospecting and Mining of Copper Ore At Santa Rita, N. Mex

    By Charles Enzian, Donald F. MacDonald

    It is a far cry from the small and uncertain mining efforts of 50 years ago to the splendidly equipped and solidly financed organiza- tions that now handle thousands of tons of ore per day. The old mi

    Jan 1, 1916

  • NIOSH
    Bulletin 78 Approved Explosion Proof Coal Cutting Equipment

    By L. C. IlsLey, E. J. Gleim

    Electrical apparatus because of its flexibility and its adaptability to all classes of service has become essential to the mining industry. Hence the problem of providing electrical equipment that is

    Jan 1, 1920

  • NIOSH
    Bulletin 98 Report of the Selby Smelter Commission

    By J. A. Holmes, EDWARD C. FRANKLIN, RALPH A. GOULD

    The commission may be permitted to express its earnest hope that the litigation which comes to an end with the findings and recom- mendations herein set forth will be considered by both parties to the

    Jan 1, 1915

  • NIOSH
    Bulletin 119 Analyses of Coals Purchased by the Government During the Years 1908-1915

    By GEORGE S. POPE

    The Government of the United States annually expends approximately $8,000,000 for coal. Prior to 1906, this coal was purchased mainly on its reputation, or trade name, rather than under contracts spec

    Jan 1, 1916

  • NIOSH
    Bulletin 65 Oil and Gas Wells Through Workable Coal Beds

    By George S. Rice, O. P. Hood

    The need of protecting mines from the danger of inflow of natural gas from neighboring wells has become more apparent each year since it was found that oil and gas underlie the productive coal measure

    Jan 1, 1913

  • NIOSH
    Bulletin 83 The Humidity of Mine Air

    By R. Y. Williams

    The investigative work described in this report was undertaken by the Bureau of Mines under a cooperative agreement with the department of mining engineering of the University of Illinois and the Illi

    Jan 1, 1914

  • SME
    Tunnel Load Rating—A Case Study: Port of Miami Tunnel - NAT2022

    By Ali Kazmi, Wern-ping N. Chen

    A load rating procedure was performed to evaluate safe load capacity of the Port of Miami Tunnel (POMT), FDOT Tunnel No. 871071 SR 887. The rating procedure performed on a total of eleven stations ben

    Dec 1, 2022

  • CIM
    Mineral Agreements and Royalties Volume I - II

    By Karl J. C. Harries

    Mineral Agreements and Royalties

    Jan 1, 2003

  • IOM3
    A review of diesed emission monitoring and control technology

    By I S. Lowndes, K. Moloney

    Diesel powered equipment is currently used extensively in mining and tunnelling operations around the world due to its mobility, flexibility and through selective application to enhance productivity.

    Jan 10, 1996

  • IIMP
    Geología e historia del Proyecto Cachorro, descubrimiento greenfield bajo cobertura de gravas, Cordillera de la Costa de la Región de Antofagasta, Chile.

    By Miguel Tapia, Javier Alfaro, al et, Boris Alarcón, Sergio Giglio

    El Proyecto Cachorro está ubicado a 150 Km al NE de la Ciudad de Antofagasta, en la Cordillera de la Costa de la Segunda Región de Chile, donde se encuentran depósitos de cobre tipo estratoligados, IO

    May 10, 2023

  • SME
    Mechanism of Advancing Drift on Weak Ground Excavation - RETC2021

    By Sadatoshi Ohmori, Karen Shinoda, Nobuharu Isago

    Method of tunnel excavation is generally classified such as full-face excavation, bench-cut excavation, diaphragm with center pillar excavation, center drift advancing excavation and so on. These exca

    Jun 13, 2021

  • SME
    Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021

    By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber

    The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g

    Jun 13, 2021

  • SME
    Mechanized Tunneling in Flowable River Sands—The TBM Drives of the Annacis Island WWTP New Outfall System - NAT2022

    By John Newby, Edward Kennedy, Ulf Gwildis

    Alluvial deposits of major rivers often provide relatively uniform tunneling conditions. However, these conditions pose specific challenges due to the tunneling behavior of the granular soils as flowi

    Dec 1, 2022

  • IIMP
    Reporte de Recursos Minerales bajo la Nueva Regulación S-K 1300 (NYSE)

    By José Gutiérrez, Cosme Soto, Octavio Vargas

    El presente trabajo detalla las etapas más relevantes del proceso de cambio de la Guía Industrial 7 (IG-7) a la regulación S-K1300 cuya finalidad es reportar Recursos Minerales en la Bolsa de Nueva Yo

    May 10, 2023

  • SME
    Analysis of Near Field Vibration Monitoring in Construction Blasting - NAT2022

    By Jim Buckley, Ryan Sibley, Scott G. Giltner, Thomas Pallua, Joe Schrank, Robert Cidlik

    Because of variation in rock type and site conditions, it is important to create site-specific prediction models for peak particle velocity (PPV) and understand instrumentation mounting locations to b

    Dec 1, 2022

  • SME
    Tunnel Design Aspects for the New Haven Downtown Storm Sewer Infrastructure Improvement Project - RETC2021

    By Michael Schultz, Gregory Sanders

    The City of New Haven is proposing to construct Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project includ

    Jun 13, 2021

  • SME
    Application of Surrogate Modeling for SEM Tunneling Simulation

    By Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney

    This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri

    Jun 13, 2021

  • IIMP
    Descubrimiento de un Sistema de Pórfido Cu-Au-Mo de alta ley Proyecto El Encierro, Región de Atacama, Chile

    By Miguel Tapia, al et, Milenko Gonzalez, Sergio Giglio

    El Encierro es un yacimiento de tipo pórfido Cu-Au del Mioceno superior ubicado en la zona intermedia entre las franjas de El Indio y Maricunga, en el norte de Chile. Está emplazado bajo un extenso li

    May 10, 2023

  • IOM3
    Electrowinning of copper from chloride solutions in presence of gas sparging

    By D. J. Fray, F. Tailoka

    Microporous ceramic tubes (15 micrometre pore diameter) and PVC membranes (10 micrometre diameter) have been used as spargers in the electrowinning of copper from concentrated and dilute chloride elec

    Jan 4, 1993

  • SME
    Long Distance Tunnelling: Challenges and Trends - NAT2022

    By Karin Bäppler

    Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct

    Dec 1, 2022