Search Documents

Sort by

  • CIM
    Carmen De Andacollo – Start-up of Teck’s New Copper Concentrator

    By L. Torres, C. S. R. Rondestvedt, M. Bustos

    In February 2010, Teck’s newest Concentrator at Mina Carmen de Andacollo (CDA), Andacollo, Chile was commissioned. The Concentrator is a single line configuration, comprising of one 36 ft diameter x 2

    Jan 1, 2012

  • AIME
    Contents

    Jan 1, 1934

  • ISEE
    Effects of Accurate MS Delays on Productivity, Energy Consumption at the Primary Crusher, Oversize, and Ground Vibrations and Airblast

    By James W. Reil, Douglas A. Anderson, Steven L. Burchell

    A total of 26 full-scale production blasts at three sites were extensively monitored with sophisticated instrumentation systems to determine the benefits of more accurate detonators. The new and more

    Jan 1, 1986

  • AIME
  • SME
    A Laboratory Approach To Study Dust Generation Due To Regrinding

    By Danqing Xu, A. W. Khair

    This paper presents a laboratory simulation of regrinding and resulting dust generation. An Automated Rotary Coal Cutting Simulator (ARCCS) was modified to conduct regrinding experiment. In order to e

    Jan 1, 1991

  • SME-ICGCM
    A Case History of the Effect of Mine Subsidence on a Concrete Arch Bridge in Northern West Virginia

    By R. B. Alke

    Request to Mine Beneath Bridge The Jabs Run Bridge is a reinforced portland concrete arch filled bridge located on WV Bouts 7 near Pentress, WV. The bridge has a span of 22.9 m (meters) and a height o

    Jan 1, 1984

  • AIME
    Clearness

    By T. A. Rickard

    The notion prevails that writing is a knack, that the skilful use of the pen is a gift of nature. This is an error. Dogberry may be responsible for it; he said: "To be a well-informed man is the gift

    Jan 1, 1931

  • AUSIMM
    Construction Management of Hydrogeological Aspects of Melbourne City Link Project

    By I A. Lamb

    The Melbourne City Link Project has two tunnels, the Domain and Burnley Tunnels, which have been constructed by Transfield Obayashi Joint Venture (TOJV) under a design and construct contract. The two

    Jan 1, 1999

  • AIME
    Contents

    Jan 1, 1940

  • SME
    Assessment Of Modeling Techniques For Prediction Of Subsidence Over Longwall Areas

    By A. W. Khair

    This paper presents an assessment of modeling techniques in predicting subsidence over longwall areas. Extensive instrumentation, both at the surface and subsurface of three longwall mines in northern

    Jan 1, 1989

  • ISEE
    SEE Education Foundation (Scholarship Awards - 2004)

    By N/A N/A

    Aw a rd winners from the University of MissouriRolla. Back row from left: Seok Bin Lim, Chris B o l l i n g e r, Adam Kre s l e r, Scott Geer, Joseph Cohn, and James (Buck) Hawkins; Front ro w f rom l

    Jan 1, 2004

  • AIME
    AIME News

    Jan 10, 1951

  • IMPC
    Real-Time Condition Management of Critical Plant Equipment and Processes (ABSTRACT PAGE)

    By Rebecca Hope, Derick Moolman, Frikkie Malan

    "Despite the lip service that has been paid to pro-active plant maintenance processes over recent years, a significant portion of maintenance in industry is still reactive. The business driving force

    Jan 1, 2003

  • SME-ICGCM
    Anchorage Pull Testing for Fully Grouted Roof Bolts

    By Chris Mark

    Fully-grouted roof bolts comprise more than 80% of the primary roof supports used in U.S. coal mines. However, nearly 1,500 MSHA reportable, non-injury roof falls occur each year, and most of these ar

    Jan 1, 2002

  • SME
    Cationic Flotation of Mesabi Range Oxidized Taconite

    By G. Rinelli, Arthur F. Colombo, Donald W. Frommer

    With the opening of the Tilden mine near Ishpeming, MI, a new era in iron ore beneficiation was begun. A description of a U. S. Bureau of Mines investigation is summarized to illustrate the selective

    Jan 1, 1976

  • DFI
  • NIOSH
    Bibliography

    By R. V. Ramani, R. Stefanko, G. W. Luxbacher

    Ahmed, M.,• "Development of an Integrated Control System for Mine Ventila¬tion and Firedamp Drainage," Mining Engineer, Vol. 127, No. 91, April, 1968, pp. 382-392. Andrews, J. W., "U. S. Mine Venti

    Jan 1, 1977

  • CIM
    Accident Prevention

    By Walter E. Montgomery

    ACCIDENT-PREVENTION work in years gone by has been carried on by many mine managers as a philanthropic movement, but in recent years they have come to realise that Safety is good business and pays tan

    Jan 1, 1938

  • AUSIMM
    A Preliminary Investigation into Electro-Strengthening of Tailings for Surface and Underground Disposal

    By Chappell B

    Backfill in the form of mine waste tailings has inherent problems associated with attaining adequate strengths upon placement. Fines are usually removed to ensure adequate drainage, which lowers the

    Jan 1, 1998

  • AIME
    Contents

    Jan 1, 1954