Search Documents

Sort by

  • AUSIMM
    Key Drivers of Energy and Cost Efficiency in Autogenous/Semi-Autogenous Grinding Circuits

    By G Lane, M Bueno

    In a recent publication (Bueno and Lane, 2011) the authors presented the analysis of a consolidated dataset composed by 137 autogenous/semi-autogenous grinding (AG/SAG) mill pilot trials. By comparing

    Oct 29, 2012

  • DFI
    Innovative Driven Pile Solution for the Rhode Island Route 6/10 Interchange Project

    By Seth H. Hamblin, Leo J. Hart, John E. Regan

    The Route 6 /10 10 Interchange Design/Build project, located in Providence, Rhode Island, involves the design and construction of five (5) new elevated bridge structures to replace and reconfigure the

    Jan 1, 2019

  • DFI
    Innovative Earth Retention Project for a Parking Garage

    By Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing

    "A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui

    Jan 1, 2016

  • DFI
    Innovative Grouting Techniques for Installation of a Seepage Barrier at Barrage Des Quinze Dam (Quebec, Canada)

    By Danny Déry-Chamberland, Peter Bowman, Michael Byle

    "The Barrage des Quinze dam is a concrete sluice dam consisting of 19 spillway sections, each of which is approximately 7.6 metres wide and 14.5 metres deep. Rehabilitation efforts being performed on

    Jan 1, 2016

  • DFI
    Innovative SSP Design and Construction for a Complex Soil Remediation Project

    By Matthew C. Janes, Mark C. Spence

    "A former coal gasification site next to Rock Bay in Victoria, BC, Canada required a barrier to permit dewatering and excavation of the bay and surrounding property. The adjacent property owners had s

    Jan 1, 2016

  • DFI
    Innovative Use of an Active Soil Nail Wall in Lieu of Pit Underpinning for a Historic Building

    By Tai Luu, Maxim C. Schisler, Yaser Taheri

    The Stevens Gateway Project is an expansion of the Stevens Institute campus overlooking the Hudson River in Hoboken, NJ. The plans call for 90,000 ft2 (8360 m2) of new classroom, research, and student

    Jan 1, 2019

  • DFI
    Innovative Use Of Ground Improvement

    By Mark Koelling

    This paper presents a case history of a ground improvement program conducted in a soft soil environment and seismically active region in the northwest corner of Washington State near the Canadian bord

    Jan 1, 2010

  • DFI
    Installation and Efficiency of Common Helical Pile Couplings

    By Jason Herron, Joseph Brown

    The common couplings for joining sections of helical piles with an outside diameter of 6.625 inches and 8.625 inches are square on square, flange to flange, external pipe sleeve, internal pipe sleeve,

    Jan 1, 2019

  • DFI
    Installation Effects of Drilled Screw Pile In Soft Clay

    By Jianhua Wang, Jianming Yao, Zhen Meng, Jinjian Chen

    "Drilled screw pile is a newly developed displacement pile foundation which has been applied in soft clay for many years. Compared with traditional circular displacement pile, It is characterized by h

    Jan 1, 2015

  • DFI
    Installation of 10 Feet Diameter CIDHs in Soft Clay Using Rotator/Oscillator on Trestle

    By Babak Mamaqani, Pirooz Barar

    The Moanalua trestle spanned over Moanalua Stream, Honolulu, HI and was designed to accommodate construction of five 10 feet diameter cast in drilled hole (CIDH) piers as a part of Honolulu Authority

    Jan 1, 2019

  • DFI
    Installation of Secant Pile Wall in Rock Adjacent to Fragile Building

    By Chu E. Ho, Alfredas Daugiala, Nicola Ebanks

    "The construction of an ancillary structure for the new Second Avenue Subway Line in Manhattan, New York City involved a deep excavation in highly variable rock conditions adjacent to a fragile masonr

    Jan 1, 2016

  • DFI
    Integrity Evaluation Of Driven Concrete Piles Utilizing Embedded Data Collectors

    By Donald T. Robertson

    This paper presents case histories of driven concrete pile damage detected with dynamic testing methods utilizing strain gages and accelerometers embedded in the pile at the prestressing yard during p

  • DFI
    Integrity Testing of Drilled Displacement Piles at a Major Campus

    By Mark D. Fuhriman, Parham Khoshkbari, Robert Fosse

    Drilled displacement piles are becoming an increasingly common deep foundation choice for their relatively simple installation methods, applicability to a wide range of subsurface conditions, and vers

    Sep 8, 2021

  • SME
    Interaction Models for Mechanized Tunneling

    By G. Meschke

    "This paper reports on computational and experimental research, performed at the Collaborative Research Center “Interaction Models for Mechanized Tunneling” at Ruhr-University Bochum, Germany. Researc

    Jan 1, 2016

  • SAIMM
    Interaction Of Graphite With Synthetic Matte

    By B. M. Thethwayo

    Graphite blocks are currently used in the concentrate - slag zone in primary PGM smelters, and can possibly be extended to the matte zone. This project evaluates the interaction between synthetic matt

    Jan 1, 2012

  • DFI
    Interactive 3-Dimensional Modeling of Anchors at Bluestone Dam

    By Jamey Rosen, Georgette Hlepas

    "Bluestone Dam is a concrete gravity structure with an overall length of 2,060 feet and a maximum height of 165 feet above the streambed. Several major project modification designs have been implement

    Jan 1, 2016

  • NIOSH
    International Land Reclamation And Mine Drainage Conference And Third International Conference On The Abatement Of Acidic Drainage - Volume 1 Of 4: Mine Drainage

    Mine drainage and mine reclamation are topics of major interest to the mining industry, federal and local governments, and the general public. This publication and its companion three volumes are the

    Jan 1, 1994

  • NIOSH
    IC 9184 Mine Drainage And Surface Mine Reclamation Proceedings Of A Conference Sponsored By The American Society For Surface Mining And Reclamation, The Bureau Of Mines, And The Office Of Surface Mining Reclamation And Enforcement.

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conferenc

    Jan 1, 1988

  • NIOSH
    IC 9183 Mine Drainage And Surface Mine Reclamation - Proceedings Of A Conference Sponsored By The American Society For Surface Mining And Reclamation, The Bureau Of Mines, And The Office of Surface Mining Reclamation And Enforcement.

    Mine waste and mine reclamation are topics of major interest to the mining industry, the government and the general public. This publication and its companion volume are the proceedings of a conferenc

    Jan 1, 1988

  • NIOSH
    IC 9508 - The Application of Major Hazard Risk Assessment (MHRA) to Eliminate Multiple Fatality Occurrences in the US Minerals Industry

    By A. Iannacchione

    Major Hazard Risk Assessment (MHRA)1 is used to help prevent major hazards, e.g., fire, explosion, wind-blast, outbursts, spontaneous combustion, roof instability and chemical and hazardous substances

    Jan 1, 2008