Search Documents

Sort by

  • IOM3
    Simply the Best; Presidential Address to the South Western Branch of IMinE

    By G Williams

    Discussing equipment, systems of work, the need for updated programmes of local seismic exploration, and developments within the South Wales coalfield.

    Jan 1, 1993

  • IOM3
    Prediction of deposition velocities and their use on assessing sanding potential on spiral separators

    By A. B. Holland-Batt

    Deposition velocities play an important role in many fields of engineering and an impressive range of measured data has accumulated in the literature. Numerous workers have addressed the problems that

    Jan 12, 1992

  • SME
    Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022

    By David Maust, Rob Albinger, Mike Walling, Michael Rispin

    The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development

    Dec 1, 2022

  • IIMP
    El pasaporte geoforense: una herramienta para trazar el origen del oro

    By Beck Barbara, Kiener Patrice

    El pasaporte geoforense ha sido desarrollado científicamente como una herramienta de trazabilidad del oro para confirmar o refutar la declaración de origen de un proveedor de oro, doré o mineral. Sint

    May 10, 2023

  • IOM3
    Extraction of copper from dry Salobo (Brazil) chalcopyrite concentrate and aqueous slurries thereof by chlorination with Cl2 gas

    By E. A. Brocchi, P. K. Jena

    Complete extraction of copper from Salobo chalcopyrite concentrate can be achieved in less than 10 minutes by chlorination of the dry concentrate with Cl2 at 450 degrees C and in 5 minutes by chlorina

    Jan 4, 1992

  • SME
    Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022

    By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn

    BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental

    Dec 1, 2022

  • SME
    Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022

    By Chris D. Breeds

    Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align

    Dec 1, 2022

  • IOM3
    Mining education in the European Community

    By C. T. Shaw

    Fur a secure mineral supply position to be maintained in the Fiuropean Community there must be a supply of qualified people in the minerals industries. The education of the people required to run and

    Jan 1, 1993

  • SME
    Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021

    By Ross Goodman, Jesse Salai

    The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the

    Jun 13, 2021

  • SME
    Implementation of Vibration Monitoring to Improve Blast Design for the Mitchell Point Crossing - NAT2022

    By Nathaniel White, Todd Kilduff, Justin Laviolette, Dan Laviolette, Randy Zeigler, Sean Sundermann

    The Mitchell Point tunnel is a part of several ongoing efforts to connect the 12-mile-long Historic Columbia River trail between Mitchell Point Outlook to Mitchell Point Drive. The tunnel lies inside

    Dec 1, 2022

  • SME
    TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021

    By Devan Naik, Matthew Stokes, Andy Nigro

    This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co

    Jun 13, 2021

  • SME
    Crossing an Environmentally Sensitive Shore Area— Micro-Tunneling in the Australian Outback - RETC2021

    By Taner Aydogmus

    The A$29 billion Chevron-operated Wheatstone Project is one of Australia’s largest resource projects. Located at Ashburton North, 12 kilometers west of Onslow in Western Australia, the project will co

    Jun 13, 2021

  • SME
    Courthouse Commons Tunnel: A Case Study of Modern SEM Tunneling - NAT2022

    By Yiming Sun, John Stolz, Jakob Walter, Drew Mason

    The Courthouse Commons SEM Tunnel was excavated within 6 feet of cover beneath two buildings in downtown San Diego utilizing high-precision geotechnical instrumentation. The excavated dimensions are a

    Dec 1, 2022

  • IOM3
    Industrial news August 1997

    By NA NA

    Listing safety award winners, £I43M has been added to proceeds from coal privatisation in the year to March 1997, bringing total revenues to over £1.3bn, some company news in brief.

    Jan 8, 1997

  • CIM
    Sustainability in the Steel Industry: The potential and results of Biochar applications for iron ore pellet plants

    By Michelia Alba, Ronaldo S. Sampaio, Davi S. Braga, Mathieu Dubé

    Climate change is pressuring industries and governments for decarbonization commitments, research, testing, and use of best practices to achieve the target of global warming below 1.5/2 °C. As it acco

    Jan 1, 2023

  • SME
    Planning for Emerging Technology Underground Connection Between Rancho Cucamonga Metrolink Station and Ontario International Airport

    By Mike Wongkaew, Brandon Kluzniak, Per Vilhelmsson

    Rail access to Ontario International Airport (ONT) has long been a goal of San Bernardino County Transportation Authority (SBCTA) to increase public transit options to ONT and provide incoming ONT pas

    Dec 1, 2022

  • IOM3
    Mine climate control, both present and future, for high production force in state temperature exceeding 40°C; a case study

    By P Shead, M A. Tuck

    Both climate and methane control have been a prime concern in the development of the workings within the Deep Soft seam at Harworth Colliery. This paper describes the numerous methods employed over th

    Jan 7, 1997

  • IOM3
    Residual coal mining subsidence - some facts

    By C R. Ferrari

    Residual subsidence is generally accepted as being about 5% of the total subsidence occurring within 12 months of all mining finishing. This paper looks at five case studies from different parts of th

    Jan 7, 1997

  • IOM3
    Numerical prediction of strata deformation associated with longwall mining

    By R. I. Jeffery, J. W. Summers

    An account is given of the verification and calibration of a numerical modelling technique that has been developed for the prediction of subsurface strata deformation following the extraction of coal

    Jan 4, 1992

  • SME
    Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021

    By Todd Kilduff, Paul Wilkinson

    Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project

    Jun 13, 2021