Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
OFR-166(1)-82 Selective Placement Of Strip Mine Overburden In The United States - I Contract ReportThe selective placement of coal strip mine overburden is examined. Physical end chemical properties of spoil detrimental to revegetation and groundwater are detailed. The United States is divided into
Jan 1, 1981
-
OFR-47-87 Control Of Diesel Exhaust Missions In Underground MinesBy A. Stawsky
Effective use of diesel vehicles in underground mining requires attention to improved control of diesel exhaust pollutants such as particulate (soot), oxides of nitrogen and sulfur and carbon monoxide
Jan 1, 1987
-
Image analysis technique for rock fracture pattern studies around longwall excavationsBy D. J. Reddish, B. N. Whittaker, G. X. Sun
An image analysis technique has been used in the assessment of subsurface fracture levels in the context of water inflow into longwall mine workings. The technique was used to analyse results from phy
Jan 12, 1992
-
Digital simulation of a mechanical-drive dump truckBy I. R. Hanby
A simple but comprehensive method has been developed for the simulation of a mechanical-drive dump truck that enables various parameters to be predicted as a function of time throughout its whole cycl
Jan 4, 1992
-
50 lecciones aprendidas de la conflictividad social en la minería peruanaBy Jorge James
En los últimos 20 años la conflictividad social alrededor de las minas y proyectos mineros ha aumentado debido a diferentes razones. Haciendo un análisis de los conflictos se pueden extraer lecciones
May 10, 2023
-
InSAR Monitoring of Tunneling Surface Displacement - RETC2021By Brian Young, Ben Pantony
Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O
Jun 13, 2021
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Air-decked blasting techniques: some collaborative experimentsBy N. T. Moxon, D. Mead, S. B. Richardson
A laboratory and theoretical study of air decks was carried out to assess the effects of the size and location of air-decks on fragmentation. The degree of fragmentation was found to depend on both fa
Jan 4, 1993
-
Reflections; presidential address to the Nottinghamshire branch of IMinEBy P wade
This is the first Presidential Address given to the Nottinghamshire Branch of The Institution following the merger of the Nottinghamshire and North Derbyshire Branch of The Institution of Mining Engin
Jan 11, 1996
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Study of bucket trajectory in automatic scooping with load-haul-dump loadersBy A. Hemami
In order to automate the operation of mechanical loaders it is essential to have a knowledge of the forces that act on the bucket and of the trajectory that the bucket should follow. A trajectory for
Jan 4, 1993
-
Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021By Pafos Busch, Martin Fischer, Johannes Jaeger
The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo
Jun 13, 2021
-
Industrial news, September 1996By NA NA
RJB completes purchase of second lease-licence mine, Miller buys Wimpey Mining, Point of Ayr Colliery in North Wales closes, jobs created at Lithgow Minerals Processing Park, Australia.
Jan 9, 1996
-
Simply the Best; Presidential Address to the South Western Branch of IMinEBy G Williams
Discussing equipment, systems of work, the need for updated programmes of local seismic exploration, and developments within the South Wales coalfield.
Jan 1, 1993
-
Prediction of deposition velocities and their use on assessing sanding potential on spiral separatorsBy A. B. Holland-Batt
Deposition velocities play an important role in many fields of engineering and an impressive range of measured data has accumulated in the literature. Numerous workers have addressed the problems that
Jan 12, 1992
-
Emerging Safety and Productivity Technologies for North American Tunneling - NAT2022By David Maust, Rob Albinger, Mike Walling, Michael Rispin
The safeguarding of health and life is the number one priority for underground infrastructure projects. While culture and approach are critically important, the industry has also seen the development
Dec 1, 2022
-
El pasaporte geoforense: una herramienta para trazar el origen del oroBy Beck Barbara, Kiener Patrice
El pasaporte geoforense ha sido desarrollado científicamente como una herramienta de trazabilidad del oro para confirmar o refutar la declaración de origen de un proveedor de oro, doré o mineral. Sint
May 10, 2023
-
Extraction of copper from dry Salobo (Brazil) chalcopyrite concentrate and aqueous slurries thereof by chlorination with Cl2 gasBy E. A. Brocchi, P. K. Jena
Complete extraction of copper from Salobo chalcopyrite concentrate can be achieved in less than 10 minutes by chlorination of the dry concentrate with Cl2 at 450 degrees C and in 5 minutes by chlorina
Jan 4, 1992
-
Newly Adopted Structure Criteria for BART Underground Facilities—Industry Update - NAT2022By Samer Sadek, Phoebe Cheng, Changmo Kwon, Myat Ohn
BART Facilities Standards (BFS) Structural Criteria is a living document that governs planning, design, and construction of all BART projects. Since its development, the document undergoes incremental
Dec 1, 2022
-
Seattle’s Ship Canal Water Quality Project—Curved Microtunnel Drive - NAT2022By Chris D. Breeds
Northwest Boring, Inc. (NWB) deployed a skinned up AVN 2000AB Microtunnel Boring Machine (MTBM) to install 7.5-foot long, 118-inch outer diameter reinforced concrete pipe (RCP) sections along an align
Dec 1, 2022