    Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) City of Fort Wayne Tunnel Alignment and Adit Redesign in Construction: A Schedule Driven Journey - NAT2022

    By Todd S. Webster, Matthew J. Pierce, Brad D. Krumel

    With the Working Shafts and Starter Tunnel under way, it became apparent this 4.7-mile, 19-foot diameter wet weather tunnel was going to live up to its name. The shaft’s pre-excavation grouting was co

    Dec 1, 2022

  • SME
    The Use of Cloud-Based Geotechnical Software During the Final Design of the New Haven Downtown Storm Sewer Infrastructure Improvement Project - NAT2022

    By Michael Schultz, Gregory Sanders

    The City of New Haven is planning to construct the Downtown Storm Sewer Infrastructure Improvement project to mitigate on-going stormwater flooding in the Long Wharf District. The proposed project inc

    Dec 1, 2022

  • SME
    Design and Construction of a Deep Underground Station in Urban Area - RETC2021

    By Verya Nasri

    This paper will present the design and construction of a deep underground station of the Réseau Express Métropolitain (REM) project; the Édouard Montpetit station. The Édouard-Monpetit station is an i

    Jun 13, 2021

  • SME
    Methodologies for Sound Transit’s Proposed New Tunnels for LINK Light Rail Expansion - RETC2021

    By Matthew Preedy, Anthony Pooley, Mike Wongkaew, Dirk Bakker, Raghu Bhargava

    Sound Transit’s ST3 program will add 62 miles of light rail to the Puget Sound area, including connections to the neighborhoods of West Seattle currently anticipated by 2031 and Ballard by 2036. These

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • IOM3
    Aluminium-lithium aerospace alloys: a new challenge for recycling

    By D. J. Allan, W. R. Wilson

    For conventional aerospace aluminium alloys of the 2000 (copper) and 7000 (zinc, magnesium) series the recycling of process scrap from both metal suppliers and aircraft manufacturers is a well-establi

    Jan 4, 1993

  • IIMP
    Exploración de pórfidos cupríferos en los Andes Septentrionales utilizando magnetotelúrica aerotransportada: caso Proyecto Santiago, Ecuador

    By Andrei Bagrianski, Marco Nieto, Alexander Prikhodko

    Se realizó una adquisición magnetotelúrica helicotransportada con el sistema MobileMT sobre un depósito metálico asociado a un pórfido de cobre conocido como Proyecto Santiago en el Cinturón Metalogén

    May 10, 2023

  • IOM3
    Reliability and availability analysis of mining systems

    By Tuncel M. Yegulalp, Selamet G. Ergelebi

    A description is given of a method of analysing modern mining systems in terms of reliability and their effects on productivity. Non-exponential distributions, such as the Weibull and lognormal distri

    Jan 4, 1993

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021

  • IOM3
    Spotlight on Stamler Corporation

    By NA NA

    Stamler Corporation manufactures of mining machinery and material handling equipment specialising in Feeder-Breakers to the mining and quarrying industries.

    Jan 9, 1996

  • IOM3
    Computers and blasting

    By T. J. White, R. A. Farnfield

    Early computerised blast monitoring equipment consisted of a digital version of the existing analogue machines with, perhaps, a few enhancements. Many additional facilities have since been developed t

    Jan 4, 1993

  • IOM3
    Implications of use of Mayer curves for coal data

    By G. J. Lyman

    Mayer curves are used for process calculation in coal preparation. They can also be used to smooth washability data by fitting a hyperbola of particular properties to ash and yield, but to introduce t

    Jan 8, 1992

  • SME
    High-Frequency InSAR Displacement Monitoring and Trend Detection Analysis for Tunneling Projects - RETC2021

    By Marie-Josée Banwell, Cyriac Sebastian, Giacomo Falorni, Sara Del Conte

    Interferometric Synthetic Aperture Radar (InSAR) is a satellite-based monitoring technique that complements other in-situ methods for detecting and measuring surface displacement. Recent advances in d

    Jun 13, 2021

  • IOM3
    Conveyor chain experince in Australia and South Africa (twin inboardside discharge installations)

    By P A. Collier

    The general view of the author is that all the good intentions of manufacturers can fail completely if the variations in circumstances in underground mining are not considered at all times. With a bel

    Jan 5, 1996

  • SME
    Improved Contracting Practices and Ground Risk Management Using Geostatistics - NAT2022

    By Jacob Grasmick, Bill Newns

    Despite ongoing digitization and “hardware” technological advances, geotechnical uncertainty remains the most significant risk in underground and tunnel construction. And, whilst they are commonly hel

    Dec 1, 2022

  • SME
    Upgrading the Coal Creek Trunk Sewer - RETC2021

    By Joseph Clare

    It’s not the 1960s anymore. Upgrading wastewater pipelines in the current era demands the latest trenchless technology to minimize impacts. King County Wastewater Treatment Division in Seattle, Washin

    Jun 13, 2021

  • SME
    Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021

    By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry

    Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel

    Jun 13, 2021

  • SME
    Analytical Behavior of a Tunnel with Rock Bolts and Shotcrete During an Extreme Fire Event - NAT2022

    By Dean Newman, Michael Behrens, Mark Trim, Justin Arifin

    Road tunnels in recent infrastructure projects in Sydney, Australia, are designed to have a fire resistance level of either a 4-hour cellulosic fire or a 2-hour hydrocarbon fire. Where permanent groun

    Dec 1, 2022

  • SME
    Remediation of Soil and Water Contaminated by Cyanide Using Peroxide and Biodegradation

    By Pat Gochnour, Jim V. Rouse

    Advances in the design and construction of heap­leach pads and process plants have greatly reduced. the potential for accidental releases of process olut1on. While workers in the field, and regulatory

    Jan 1, 1992

  • SME
    Continuous Elution of Gold from Activated Carbon

    By Francois J. E. Scholtz, Raymond J. Davidson, Peter Greenhalgh, R. Paul Riley

    A 1 t/d continuous elution pilot plan is being operated by General Mining at their Grootvlei Gold Mine using the technology developed at the Anglo American Research Laboratories. Flowsheet design and

    Jan 1, 1990