Search Documents

Sort by

  • CIM
    Ammonia Nitrogen Removal by Enhanced Algae Growth – Case Study of a Subarctic Mine Site

    By Thomas Genty, Pascal Marcotte, Matthew Gillman, John Baechler

    Elevated concentrations of ammonia nitrogen is a common characteristic of mine impacted water and generally results from the dissolution of undetonated explosives (i.e., Ammonium Nitrate and Fuel Oil

    Jan 1, 2023

  • SME
    Design and Construction Challenges at the Potomac River Tunnel in Washington DC - RETC 2021

    By Moussa Wone, Martino Scialpi, Colin LaVassar, Carlton Ray

    The Potomac River Tunnel (PRT) is the next major phase of the DC Clean Rivers Program. The design-build PRT project includes a 5.5-mile-long, 18-foot-internaldiameter tunnel, seven shafts, and two und

    Jun 13, 2021

  • SME
    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • SME
    Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022

    By Greg Colzani, Emily Thompson

    The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma

    Dec 1, 2022

  • IOM3
    Geochemical reconnaissance using stream-sediment pebble coatings and laser ablation ICP-AES

    By M. Thompson, B. Coles, M. Hale

    The use in regional geochemical reconnaissance of replicate analysis of natural coatings of iron and manganese oxides on the surface of pebbles in stream sediment is described. Pebble coatings were se

    Jan 4, 1992

  • SME
    High-Speed 3D Tunnel Inspection in Subway Tunnels— Case Study San Francisco BART - RETC2021

    By Thomas Pea, Heiner Kontrus, Jérôme Steinkühler

    In tunnel condition assessment, the trend is towards comprehensive 3D measurement combined with high quality image texture to document and quantify damages to the tunnel surface and to create a cohesi

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021

  • SME
    How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022

    By Hongjie Yu, Mike Mooney

    Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q

    Dec 1, 2022

  • IIMP
    Multivariate analysis of stream sediment chemistry for better anomaly detection and investigation

    By Natalie Caciagli

    Catchment basin sampling allows for rapid assessment of large areas. Stream sediment surveys are a common tool used in regional exploration. The difficulty in detecting geochemical anomalies in stream

    May 10, 2023

  • SME
    Design and Construction of Load Transfer System to Replace Existing 39th Street Bridge Piers with New Integral on the Track B/C Approach Structure for the East Side Access Project - RETC2021

    By Julio C. Martinez, Jeffrey L. Rice, Hayden Weschler

    This paper details the extensive underpinning required to hold up the 39th street Bridge while demolishing its massive support piers and building a 30ft deep Cut/ Cover RR tunnel beneath it. The under

    Jun 13, 2021

  • IOM3
    Microflotation measurements based on modified Hallimond tube

    By J. Drzymala, K. L. Wolters, T. Chmielewski, T. D. Wheelock, D. H. Birlingmair

    Microflotation tests were conducted with a modified Hallimond tube equipped with a fritted glass disk and magnetic stirrer to determine whether the results would support an equation that predicts a li

    Jan 4, 1992

  • SME
    The Variable Density TBM—Current Level of Development - RETC2021

    By Werner Burger

    After its first introduction in 2013, Variable Density TBMs have increased their application significantly in mechanized closed mode tunneling. Throughout a variety of successfully completed and ongoi

    Jun 13, 2021

  • SME
    Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022

    By Adam Bedell, Jack Raymer, Brad Crenshaw

    Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There

    Dec 1, 2022

  • IOM3
    Sintering mechanism of Western Australian pisolitic limonite

    By J. Ostwald, L. T. Matthews, C. E. Loo

    Australia has large reserves of pisolitic limonite. Mining recently commenced on the Yandicoogina deposit to produce a high-grade sintering ore. The ore contains about 10 wt% combined water and simul

    Jan 12, 1992

  • SME
    Utilizing “Big Tex” for the Dallas Mill Creek Drainage Relief Tunnel - RETC2021

    By Paul J. Smith, Eudomar A. Silva, Quang D. Tran, J. Milton Brooks

    The Dallas Mill Creek Drainage Relief Tunnel is an 8.04 km (5 mile) tunnel that will provide 100-year flood protection for impacted neighborhoods in the east Dallas area. “Big Tex” is a main beam grip

    Jun 13, 2021

  • SME
    Implementing BIM Underground on Progressive Design-Build Atlanta Plane Train West Extension Project - NAT2022

    By Jeff Fontana, Daniel Ebin, Eric Westergren, William Currier

    The PMott MacDonaldlane Train Tunnel West Extension (PTTWE) Project at HartsfieldJackson Atlanta International Airport includes the extension of the existing automated people mover system and terminal

    Dec 1, 2022

  • SME
    Real Challenges of Digging a Shaft in Free Phase Oil and Hydrocarbons - RETC2021

    By Ehsan Alavi, Sanjeer Yogendran, Savreet Singh

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel Project in Toronto extends approximately 10.5 km from Ashbridges Bay Treatment Plant west under Lake Shore Boulevard, north under Bayv

    Jun 13, 2021

  • SME
    Construction of Ottawa’s Combined Sewage Storage Tunnel (CSST) - RETC2021

    By Alejandro Sanz Garrote, Juergen Laubbichler, Fernando Triana Gracian, Paz Navarro Gancedo-Rodriguez, Andreas Feiersinger

    The Combined Sewage Storage Tunnel (CSST) is part of the Ottawa River Action Plan and will greatly reduce the frequency of sewage overflows into the Ottawa River during storms. The project consists of

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • IOM3
    Analysis of transient IP decay curves: case study from Pisnari, Lalitpur district, Uttar Pradesh, India

    By P. Rama Krishna, B. Narasimha Rao, P. Ali i Peera

    Induced polarisation (IP) surveys are commonly used in uranium exploration programmes in India. The IP method is effective in detecting the disseminated metallic sulphides that are often associated wi

    Jan 4, 1993