Search Documents

Sort by

  • SME
    Improving Roof Bolter Safety - Preprint 09-024

    By A. Hammons

    Automated temporary roof support (ATRS) systems have been incorporated into roof bolters since the 1970's. During roof bolting, many injuries have occurred from large pieces of draw rock falling

    Jan 1, 2009

  • AUSIMM
    The Geology of the Woodcutters Lead-Zinc-Silver Deposit and Its Environment, Rum Jungle Area, Northern Territory

    The Woodcutters deposit, 65 km south- southeast of Darwin, N.T., consists of a series of veins of pyrite, sphalerite, and galena with some silver, cadmium, antimony, and arsenic minerals. The veins

    Jan 1, 1984

  • ISEE
    Is that Normal? Fundamental Observations for Best Practive Blast Vibration Anaysis

    By W. J. Birch, A. Wetherelt

    The scaled-distance model for blast vibration analysis is the standard method employed throughout the surface mining and quarrying industries to model Peak Particle Velocity (PPV) data. Although empir

    Jan 1, 2005

  • AIME
    Some Developments In The Production Of Magnesium From Dolomite By The Ferrosilicon Process

    By L. D. Fetterolf, G. T. Mahler, W. M. Peirce, R. K. Waring

    UNTIL recently, the only commercial method of producing magnesium has been fused salt electrolysis, despite a considerable amount of experimental work on the direct reduction of magnesium oxide. In th

    Jan 1, 1944

  • SME
    Predictive Control Of Flotation Plants

    By Frédéric Flament, Daniel Hodouin, Claude Bazin

    A control strategy is proposed to meet the following specifications of flotation control: minimize the variations of concentrate and tails grades and recovery while limiting the amplitude of variation

    Jan 1, 1993

  • TMS
    Oxidation Behavior of Al3Ti Intermetallics

    By R. G. Reddy

    The oxidation kinetics of A13Ti intermetallics have been studied at the temperature range of 850°C to 100O0C in pure dry oxygen. The oxygen diffusion rates were investigated using TGA method. Paraboli

    Jan 1, 1997

  • CIM
    Jaguar?s Caeté Gold Project in Brazil

    By Ivan C. Machado

    Jaguar Mining Inc. is implementing a 1.1 Mtpy, 7-year LOM gold project in the Iron Quadrangle (?Quadrilátero Ferrífero?), Brazil. Construction is on schedule and startup is programmed for Q2 2010. Mil

    May 1, 2010

  • AUSIMM
    Environmental Investigations and Procedures to Support Mining Consent Applications

    By M Foster

    The new environmental legislation of 1986 was left incomplete and to date remains so. The 'missing' process by which environmental consideration should be applied was never embodied in law a

    Jan 1, 1988

  • SAIMM
    Spotlight - Artificial Intelligence In Process Engineering

    The Western Cape Branch of the SAIMM recently held a one-day colloquium on the use of artificial intelligence (AI) in process engineering in the I.S. Gericke conference room at the University of Stell

    Jan 1, 1992

  • TMS
    Aqueous/Organic Processing Of Rare-Earth Carbonate Powders from Rare-Earth Loaded Carboxylate Solutions Using CO2 Gas

    By Yasuhiro Konishi, Yoshiyuki Noda

    "This paper describes a new processing of rare-earth oxide precursor, in which rare-earth carbonate powders are precipitated directly from emulsions of rare-earth loaded carboxylate solutions, using C

    Jan 1, 2000

  • CIM
    Three-dimensional fracture mapping in granite excavations using ground-penetrating radar

    By A. L. Holloway, N. M. Soonawala, L. S. Collett

    "Since the late 1970s, a major R&D program has been under way in Canada to assess the concept of disposing of nuclear fuel wastes in deep plutonic rock. Atomic Energy of Canada Ltd . (AECL), a federal

    Jan 1, 1986

  • NIOSH
    IC 8783 Inmine Fire Tests Of Mine Shaft Fire And Smoke Protection Systems

    By Guy A. Johnson

    This Bureau of Mines report summarizes the results of efforts to develop reasonably priced, reliable mine shaft fire and smoke protection hardware for metal and nonmetal mines. The hardware was incorp

    Jan 1, 1978

  • CIM
    Challenges of ISRU Rover Development

    ?Four-wheel, skid-steer, rover developed for CSA ?U-chassis for payload accommodation ?Passive geometric suspension ?Max speed 13km/hr ?Remote workstation ?275kg payload capacity ?On-board

    May 1, 2013

  • NIOSH
    RI 8989 - Electrostatic Sensitivity, Strength, and No-Fire Current of Short-Delay Detonators

    The Bureau of Mines evaluated short-delay coal mine detonators manu-factured by three domestic companies for electrostatic sensitivity, strength, and no-fire current level. Electrostatic sensitivity w

    Jan 1, 1985

  • IIMP
    Miniplantas siderúrgicas

    By Alan Shakespeare

    El presente texto desarrolla los aspectos económicos de las miniplantas siderúrgicas de Brasil, las materías primas, ubicación, transporte, dimensiones de la planta, tipos de productos, mano de obra y

    Jul 1, 1974

  • AIME
    PART IV - Communications - The Standard Free Energy of Formation of Cuprous Oxide

    By F. E. Rizzo, L. R. Bidwell, D. F. Frank

    THE use of galvanic cells for the determination of oxygen activities has spread rapidly since the suitability of calcia-stabilized zirconia as a solid electrolyte material was first demonstrated by Ki

    Jan 1, 1968

  • AUSIMM
    A Potential Type on Tin Deposit in East Guangdon, China

    By Bin H

    East Guangdong tin province overlaps the southmost part of the mesozoic magmatic arcof continental margin type in Southeast China and is dominated by mesozoic syntectic magmatism,which associated to t

    Jan 1, 1990

  • AUSIMM
    Primary vertical Crafter Retreat Mining at the Zinc Corporation, Limited

    By Hebbard GJ

    Vertical crater retreat mining is being used at Zinc Corporation, Limited and New Broken Hill Consolidated, Limited for pillar recovery between previously mined and filled stopes. In order to increase

    Jan 1, 1985

  • ISEE
    Journal: Recent Projects Paseo Bridge Pier Demolition

    By David Hersey

    The Paseo Bridge was located at the I-29/I-35/US-71 Missouri River Highway Crossing. It was built between 1952 and 1954 by Massman Construction Company. The 1,232 foot long, self-anchored suspension b

    Jan 1, 2013

  • TMS
    ESP Dust Recovery Process Test Works, Plant Trial, Commissioning, Operations and Metallurgical Performance

    By Peter Woodall, Paul Telford, Pengfu Tan

    "Arsenic enters the Mount Isa copper circuit in the form of arsenic rich minerals in concentrates from both the Mount Isa and Ernest Henry copper mines. Arsenic is a volatile metal, and will partition

    Jan 1, 2011