Search Documents

Sort by

  • IOM3
    Crown pillar risk assessment - planning aid for cost-effective mine closure remediation

    By T. G. Carter, R. I. Miller

    First, the influence of variation in the

    Apr 1, 1995

  • SME
    Belt Replacement Methods for Long Conveyors

    By Allan D. Fernie

    Many long conveyors, 2 - 20 km plus, have been installed over the past 10 years. Conveyor belt life, depending on the conveyor length and material handled, will generally range from 10 - 15 years.

    Jan 1, 1993

  • AIME
  • AUSIMM
    Recovery of the Undercutting Front in a Mine with Conventional Panel Caving – Case Study at North Reserves Sector, El Teniente Mine

    By N Rivera, A Music, C Cisternas

    In an underground mine operated with panel caving and subjected to high stresses, geotechnical events such as collapses or rock bursts are fairly recurrent. Both situations can involve risks for peopl

    May 9, 2016

  • SME
    Progress Toward A Deep Underground Science And Engineering Laboratory At The Homestake Mine In Lead, South Dakota

    By Cathleen J. Webb, Arden D. Davis

    The Homestake Gold Mine at Lead, South Dakota, has been proposed as the host site for the Deep Underground Science and Engineering Laboratory. The laboratory will house neutrino experiments in mine w

    Jan 1, 2005

  • AUSIMM
    Stope Filling with Thickened Classified Flotation Tailings

    By Yates C, Gillie E. W, Finucane K. J

    During the year 1940 a complete investigation was made of the whole of the stoping operations throughout the Great Boulder Mine and, as a result, it was decided to convert some of the existing shrinka

    Jan 1, 1945

  • SAIMM
    Extending Zinc Production Possibilities Through Solvent Extraction

    The Modified Zincex® Process, developed by Técnicas Reunidas, is highly flexible dealing with a wide range of pregnant leach solutions. No matter if those solutions are produced from primary or second

    Jan 1, 2002

  • NIOSH
    Employment And Injuries In The Mineral Industries (61b88450-a330-4324-b7b4-85890e28ceed)

    By Forrest T. Moyer

    THE SAFETY record of the mineral and mineral-fuel-mining-and-processing industries retrogressed slightly in 1964, as indicated by the 3-percent increase in the frequency rate of all injuries. A slight

    Jan 1, 1965

  • IOM3
    The health of old colliers: discussion

    By Haldane J. S.

    Discussion of a paper presented at the Institution of Mining Engineers' general meeting held in London on 8th June 1916 included oral contributions by Louis H., Mowat D.M., Lupton A., Bailey T.H., Bla

    Dec 1, 1916

  • AIME
    New York Paper - Corrosion of Copper Alloys in Sea Water (with Discussion)

    By W. H. Bassett, C. H. Davis

    The late J. P. Sparrow, chief operating engineer of the New York Edison CO., carried out a series of practical tests on condenser tubes of several copper alloys and reported on the results to the Asso

    Jan 1, 1925

  • SME
    Field Site Data Processing A High-Frequency Radio Communication Link Between Field Camp And Computer

    By Joseph Moses Botbol

    The disposition of world mineral resources is such that a vital need exists for both the most efficient development of existing resources and the rapid disclosure of as-yet undiscovered resources. The

    Jan 1, 1975

  • NIOSH
    RI 2452 Jet

    By W. M. Myers

    Jet is a substance of organic origin and has been defined by the U. S. Geological Survey as a "dense black lignite, taking a good polish, and sometimes used for jewelry". Jet is characterized by the l

    Jan 1, 1923

  • AIME
    Production - Foreign - Oil and Gas in Iran - Courtesy of Anglo-Iranian Oil Co.

    Masjid-i-Sulaiman Field.—During the past year, drilling activities have been limited to repair work. No new developments of importance can be recorded in production technique. Fall of dome pressure is

    Jan 1, 1937

  • IIMP
    Utilización de un programa numérico de elementos finitos en el modelamiento y evaluación de taludes mineros: Algunas consideraciones para el cálculo del factor de seguridad.

    By Luis Martín Tejeda

    La simulación numérica es considerada como uno de los mejores métodos de modelamiento y planeamiento en la evaluación de la estabilidad de los taludes en minería superficial. En ese sentido, el presen

    Sep 19, 2006

  • SME
    Heavy- Mineral Deposits Of The Fox Hills Formation Located Near Limon, Colorado

    By F. L. Pirkle

    A heavy-mineral deposit about 1.6 kilometers (I mile) in length and averaging about three meters (10 feet) in thickness is exposed approximately130 kilometers (80 miles) east of Denver, along Intersta

    Jan 1, 2011

  • NIOSH
    IC 7584 Truck Haulage at the National Lead Co. Open-Cut Ilmenite-Magnetite Mine Tahawus, N.Y

    By Robert S. Sanford

    "INTRODUCTION AND SUMMARYThis paper is one of a series recently undertaken by the Mining Branch, Bureau of Mines, College Park, Md., to describe current practice in hauling ore and waste by truck at

    Oct 1, 1950

  • IIMP
    Reservorio San José - "Agua para el futuro"

    By Luis Campos

    A mediados del 2005 la empresa minera Yanacocha evaluó la posibilidad de convertir el tajo abierto de San José en un reservorio de agua que permita almacenar agua tratada durante la época de lluvias,

    Sep 9, 2007

  • AUSIMM
    Down-Hole XRD Analyses as a Guide to Hydrothermal Alteration in the Wharekirauponga Epithermal Gold-Silver Prospect, Hauraki Goldfield, New Zealand

    By R Soong

    The Wharekirauponga (WKP) epithermal gold-silver deposit is located about 10 km north of Waihi in the Hauraki Goldfield east of Auckland. WKP is notable for its sheeted to stockwork quartz veins hoste

    Jan 1, 2001

  • SME
    An Overview Of NIOSH Mine Illumination Research: Past, Present, And Future

    By J. J. Sammarco

    Illumination is essential for mine safety because miners depend most heavily on visual cues to detect hazards associated with slips/trips/falls and powered haulage. The National Institute for Occupati

    Feb 27, 2013

  • SME
    Truth, Judgement, Responsibility, Integrity, Conflict And Resolution In Exploration And Heavy Construction

    By Peter J. Tarkoy

    A great deal of attention has been directed toward the complexities and inadequacies of exploration and pre-bid geotechnical information for heavy construction projects, differing site conditions, and

    Jan 1, 1983