Search Documents

Sort by

  • CIM
    St. George-Table Head Disconformity and Zinc Mineralization, Western Newfoundland

    By L. M. Cumming

    "The contact between dolomite of the St. George formation (Cambro-Ordovician) and limestone of the overlying Table Head formation (Middle Ordovician) is a regional disconformity. This is best illustra

    Jan 1, 1968

  • SME-ICGCM
    Rock Mechanics Issues In The Trona Patch

    By Archie Richardson

    The trona mines in the Green River Basin, commonly known as the "trona patch," present an interesting set of rock mechanics issues stemming from mining in a unique underground environment. Like other

    Jan 1, 1999

  • SME
    5. Remote Sensing and Digital Image Processing ? Introduction

    By Ralph Bernstein

    The processing of earth observation sensor data by digital technology is almost two decades old. Only recently, however, has this technology become practical and economical. The reasons for this are i

    Jan 1, 1979

  • AIME
    Measurement Of The Support Resistance Of Shortwall Chocks And Its Applications

    By Duk-Won Park, Syd S. Peng

    For an adequate design of the shortwall face support, it is necessary to understand fully the support- roof interaction. A series of studies has been carried out at a shortwall panel to develop the me

    Jan 1, 1981

  • AUSIMM
    Development of a Cover System Design for Potentially Acid-Forming Tailings at Peak Gold Mines

    By M, C Silveira, C Ellice, D Christensen

    Peak Gold Mines (PGM), a member of the Rio Tinto Group, is an underground and open cut gold mining operation located near Cobar, NSW. A multi-phase study was initiated in 2001 in support of developing

    Jan 1, 2003

  • SME
    Chicago TARP McCook Main Tunnel - World’s Largest Live Tunnel Connection is Underway at Chicago’s Tunnel and Reservoir Plan (TARP)

    By Faruk Oksuz, Dave Schiemann, Matt Trotter, Mike Padilla, Miguel Sanchez, Carmen Scalise

    "Chicago’s Tunnel and Reservoir Plan (TARP) is a nearly $4.0 billion and over 30 years long program and arguably the largest and longest combined sewer tunnel and reservoir system in the world. Recent

    Jan 1, 2016

  • CIM
    Reducing CIP Tails Solution Losses at Goldcorp’s Campbell Processing Facilities

    By Monique Pharand, Jeet Basi, Simon Hille

    "High quality activated carbon is essential in the recovery of gold in Carbon-in-Leach (CIL), Carbon-in-Pulp (CIP), and Carbon-in-Column (CIC) circuits. Goldcorp’s Campbell complex at Red Lake Gold M

    Jan 1, 2016

  • SME
    Monolithically Placed Tunnel Lining A Case History

    By Vinton A. Garbesi

    INTRODUCTION The placing of the monolithic concrete lining of the Bi-County water tunnel illustrates the state of the art in the materials, equipment, methods and productivity available to the indu

    Jan 1, 1981

  • CIM
    Evaluation of the Performance of a CIP Gold Recovery Process

    By M. Courchesne, C. Barbery, D. Hodouin, C. Carrier

    "The carbon-in-pulp process for recovery of gold dissolved in dilute cyanide solutions, in the presence of solids, has now replaced the convedntional processes of pregnant liquid/barren solids separat

    Jan 1, 1987

  • AIME
    Slurries, Sludges, Slimes And Water Treatment (484d41af-5d0b-4e5c-9358-a57ac2d3ac85)

    By David R. Mitchell, E. A. Reilly, G. R. Gardner, F. P. Lasseter

    THE methods that may be applied to the treatment of slurries and water, as these are related to practical coal-preparation problems, are concerned essentially with the movements of solids suspended in

    Jan 1, 1950

  • SME-ICGCM
    Safe, Efficient, and Cost-Effective Support of Longwall Cut through Entries

    By John R. Poland, Benjamin Mirabile

    "There are significant ground support hazards to both personnel and equipment when longwall equipment must mine through cross-panel entries. Backfilling support strategies are often cost prohibitive.

    Jan 1, 2016

  • CIM
    Un système de refroidissement localisé sous-terre pour nos opérations à la mine Laronde

    By Nathalie Gauthier

    Bien que le système de ventilation du Puits Penna soit de taille imposante et que plus de $30M y seront engloutis pour son développement, aucun budget spécifique n?avait été préalablement consenti pou

    May 1, 2003

  • SME
    Electrochemical and column flotation technologies can mean higher recovery at lower operating costs

    By Garrett R. Hyde, Aleksandar Stojsic

    Introduction Economic pressures in the international marketplace have spurred advances in almost every facet of flotation. New developments have occurred in flotation chemicals, flotation machines, a

    Jan 7, 1987

  • AUSIMM
    Structural Controls of Bedded Iron Ore in the Hamersley Province, Western Australia ù An Example From the Paraburdoo Ranges

    Structure is the most important control on the location of hematite deposits in the Hamersley Province in the Pilbara region of Western Australia. Unravelling the structural history of mineralised are

    Jan 1, 2005

  • AIME
    Minerals Beneficiation - Tailing Disposal at the Morenci Concentrator

    By P. F. Allen

    WITH capacity of 51,000 tpd, the Morenci concentrator produces approximately 49,000 tons of tailing for final deposition. Disposal involves distribution of thickened tailing to dams in such a manner t

    Jan 1, 1957

  • SAIMM
    Diamond Value Management - Knowledge Management And The Measurement Of Value Addition

    By P. J. Rider

    Diamond Value Management?s objective is to achieve $/ton revenue improvement across De Beers group mines. The respective %improvement contributions are measured against targets set by each of the oper

    Jan 1, 2003

  • NIOSH
    IC 6808 Natural-Gasoline Plants In The United States, January 1, 1934 ? Introductory Summary

    By G. R. Hopkins

    For several years prior to about the middle of 1928 both the number and capacity of natural-gasoline plants showed a steady increase; this resulted from a material gain in the supply of casinghead has

    Jan 1, 1934

  • AIME
  • NIOSH
    OFR-11-77 The Correlation Of Mine Roof Failure With The Time Elapse Before Support Installation

    By Robert M. Cox

    The objective of this study was to determine if significant relationships exist between coal mine roof stability and the time roof is left unsupported. Additional factors such as geology, opening geom

    Jan 1, 1974

  • NIOSH
    RI 7508 Sampling Gold Ore By Diamond-Drilling In The Homestake Mine, Lead, S. Dak.

    By George S. Koch

    Several methods of calculating ore grades by diamond-drill sampling in the Homestake mine, Lead, S. Dak., have been evaluated by statistical analyses of assay data. The natural distribution of gold pa

    Jan 1, 1971