Search Documents

Sort by

  • ABM
    “state-of-the-art” Coking Technologies. Challenging Emissions At The Service Of The Environment: A Practical Brazilian Example

    By Antonio Esposito

    Saving energy and reducing pollution by minimizing emissions are today great challenges in the coking industry worldwide. In order to achieve satisfying results, equipment as well as technology should

    Aug 1, 2018

  • SME
    “The Dome” and the “Shaft” in the Castle Hill of Graz

    By Ralf Vergeiner

    The most famous landmark of the city of Graz (Austria) is the clock tower on the castle hill. An underground chamber was built as a multifunctional structure beneath this landmark. The required struct

    Jan 1, 2001

  • SME
    “They Want to Dig a 100-Foot Hole in Front of My House for Two Years!” - Community Mitigation and Outreach for DC Water’s First Street Tunnel

    By Carlton M. Ray, William P. Levy, Thomas Lindberg

    "The District of Columbia Water and Sewer Authority (DC Water) is implementing its $2.6 billion DC Clean Rivers Project to reduce combined sewer overflows to the District’s receiving waterbodies and m

    Jan 1, 2016

  • DFI
    “Trevi-Calatore”: Innovation in Cut and Cover and Tunneling for the Installation of Plunge Columns Aimed to Excavate Underground Structures through the Top-Down Method

    By Alessandro Bertero, Manuel Toniolo, Vincenzo Tirozzi

    "The installation of foundation elements (large-diameter Bored Piles or Diaphragm Walls) for the execution of underground works to be performed through the ""Top Down"" Technique (Stations, Car Parks,

    Jan 1, 2016

  • ABM
    “upgrade” Do Sistema De Controle Automax Em Um Laminador De Fio Máquina

    By Alexander Schultz Rizek

    O trabalho que será apresentado irá descrever o projeto realizado de atualização tecnológica do sistema de controle com controladores Automax instalado em um laminador de fio máquina de dois veios, a

    Jul 30, 2018

  • DFI
    “Value Engineering” — Four Case Histories

    By Maral Papazian Bedian

    "Case 2. 100th Street Bus Depot: Elimination of Deep Caissons in Favor of Spread FootingsThe PROJECTThe 100th Street Bus Depot is a new five-story bus terminal for the New York City Metropolitan Trans

    Jan 1, 2003