  • SME-ICGCM
    Unanticipated Multiple Seam Stresses From Pillar Systems Behaving As Pseudo Gob - Case Histories

    By Michael Gauna, Christopher Mark

    "Underground coal mining in the U.S. is conducted in numerous regions where previous workings exist above and/or below an actively mined seam. Miners know that overlying or underlying fully extracted

    Jan 1, 2016

  • DFI
    Unbraced Circular Cofferdam For Vent Building No. 6 At The South Bulkhead - Introduction

    By Philip Bonanno

    The first major project in Boston's new access to Logan Airport was an Immersed Tube Tunnel which extended 3,600 ft. from South Boston to East Boston across Boston Harbor. Twelve tube sections, 3

    Jan 1, 1994

  • DFI
    Uncertainties Arising During Drilling And Performance Of Flight Auger - Cast Piles

    By F. M. Abdrabbo

    Flight auger bored piles are formed by screwing a continuous flight auger into the ground, and pumping cement/sand grout or concrete down the hollow stem of the auger as its withdrawn. The auger is dr

    Jan 1, 1993

  • DFI
    Uncertainties In CSL Test Interpretations And Recommendations Toward A More Efficient Process

    By Rohrbach

    Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, secan

  • DFI
    Uncertainties in CSL Test Interpretations and Recommendations toward a More Efficient Process (d88ba311-8a75-4265-90f4-c083be22cd1a)

    By Mark A. Rohrbach, Timothy R. Kovacs, PhD Saidin

    "Crosshole Sonic Logging (CSL) testing is commonly used to verify the integrity, quality and ultimately the acceptability of the concrete in structural elements such as drilled shaft foundations, seca

    Jan 1, 2017

  • AUSIMM
    Uncertainty - An Important Source of (Additional) Value for Mine Projects

    By S Watson, L Martinez

    Mine projects are complex opportunities that demand a constant assessment of uncertainty, ie risk and upside potential. This is because the value of a mine project is typically influenced by many unde

    May 24, 2012

  • AUSIMM
    Uncertainty About Uncertainty in Material Sampling ù A Crucial Part of Risk Assessment

    Material sampling theory is well established in mineral process monitoring, improvement and control. It has been much enhanced by fundamental contributions due to Gy. When GyÆs sampling theory is appl

    Jan 1, 2005

  • DFI
    Uncertainty And Bias In Evaluation Of LRFD Ultimate Limit State For Axially Loaded Driven Piles

    By James A. Schneider

    Selection of resistance factors within Load and Resistance Factor Design (LRFD) requires accurate assessment of uncertainty and bias in load and resistance. To date, many studies have focused predomin

    Jan 1, 2009

  • DFI
    Uncertainty and Reliability Appraisal of CPT-Based Methods for Axial Pile Bearing Capacity

    By Abolfazl Eslami, Sara Heidarie Golafzani

    CPT-based methods considered as complementary tools for static analyses outperform other axial pile bearing capacity predictive methods. Considering soil spatial variability and minor errors associate

    Sep 8, 2021

  • AUSIMM
    Uncertainty and Risk in Mineral Valuation - A User's Perspective

    The words ""Uncertainty"" and ""Risk"" pervade every discussion about mining exploration and investment. Perhaps these terms are subjectively understood by industry professionals, but objective por

    Jan 1, 1994

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • SAIMM
    Uncertainty Assessment For The Evaluation Of Net Present Value: A Mining Industry Perspective ? Synopsis (443bbb20-5eab-43f3-85de-c6c40fb656b6)

    By Ö. Erdem

    The investment decision making process in the insurance and finance industries is affected by new advances such as simulation techniques. These advances have improved the discounted cash flow method (

    Jan 1, 2012

  • SME
    Uncertainty Based Push-Back Design Algorithm In Open Pit Mining

    By J. Gholamnejad

    In open pit mine planning and design, push back mine sequencing is widely used for long-term production planning. In push back design, a series of nested pits is generated and then considered as possi

    Jan 1, 2007

  • SAIMM
    Uncertainty Determination in Rock Mass Classification When Using FRMR Software

    By M. Rafie, M. Rinne, F. Samimi Namin

    "SynopsisRock mass classification systems constitute an integral part of empirical underground excavation design. One system that is commonly used to classify rock mass is the Rock Mass Rating, or RMR

    Jan 1, 2015

  • SME
    Uncertainty Estimates for Geometallurgical Models

    By Mario E. Rossi

    Often geometallurgical models are prepared at various project stages from very few data and are assumed to be representative of very large tonnages. These may include recovery models; crushing and gri

    Jun 25, 2023

  • SME
    Uncertainty Estimation in Blast Vibration Attenuation Model Using Bayesian Probabilistic Approach - Mining, Metallurgy & Exploration (2021)

    By S. Rukhaiyar, M. Ramulu, G. Pradeep, P. K. Singh, P. B. Choudhury

    The drill and blast method is the most prominent rock excavation method used in mining and civil engineering projects. The ground vibration is the most undesirable effect of the blasting and needs to

    Sep 27, 2021

  • SME
    Uncertainty in Mineral Resources: Why It Should Be Part of a New Mining Ethos (Part 1) - SME Annual Meeting 2026

    By M. E. Rossi

    In mineral resources, geologic and mining data are acquired, processed, analysed, interpreted and modelled, eventually serving as basis to generate predictions and production plans. This is a complex

    Feb 22, 2026

  • SME
    Uncertainty In Planning ARD Control Measures: Risk Modeling And Interpretation

    By Dr. George W. Annadale, Dr. Adrian G. Chantler

    Materials which are likely to produce Acid Rock Drainage (ARV) can be identified with a reasonable degree of certainty. However, it is not currently possible to predict the concentrations of future co

    Jan 1, 1992

  • SAIMM
    Uncertainty in Rock Mechanics and Rock Engineering—Then and Now

    By H. H. Einstein

    This paper reviews how uncertainty has been dealt with over the past 40 years using the decision making cycle as a frame of reference. The review of the phases of this cycle, as applied to rockmechani

    Jan 1, 2003

  • AUSIMM
    Uncertainty in Soil Sampling ù A Case Study

    By K Luthbom, A Lagerkvist

    According to the Swedish Environmental Protection Agency, the number of potentially contaminated sites in Sweden is approximately 40 000. The funding for remediation from the Swedish Government alone

    Jan 1, 2005