Search Documents

Sort by

  • AUSIMM
    Tunnel Boring in the Mount Lyell Mine

    The Channel Tunnel is an outstanding example of an undersea tunnel and its design illustrates most of the unique features of this type of tunnel. The marine site investigation was partic- ularly vuln

    Jan 1, 1976

  • SME
    Tunnel Boring Machine Concept for Converging Ground

    By Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass

    The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig

    Jan 1, 1995

  • SME
    Tunnel Boring Machine Development

    By Martin Herrenknecht

    Tunnel boring machine (TBM) development continues to take on not only larger diameters, but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressures u

    Jan 1, 2008

  • SME
    Tunnel Boring Machine Development (40a6f155-647d-4f40-8bd5-2913a0c65ac8)

    By Martin Herrenknecht

    Tunnel boring machines continue to develop to take on not only larger and larger diameters but also more difficult ground conditions. Ground conditions consisting of unstable faces with water pressure

    Jan 1, 2008

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • SME
    Tunnel Boring Machine Experience In The Milwaukee Program

    By Philip U. Santacroce, James H. Meinholz

    One-half of the $607 million Conveyance construction portion of the Milwaukee Metropolitan Sewerage District's Water Pollution Abatement Program is completed or under contract. 12,200 m (7.5 m

    Jan 1, 1987

  • SME
    Tunnel Boring Machine Instrumentation

    By Larry Snyder, Levent Ozdemir, Charles Fishman, Fun-Den Wang

    Tunnel Boring Machine Instrumentation A 9.17 m. diameter tunnel boring machine presently in operation in Chicago, Illinois, has been instrumented to continuously monitor and record machine thrust,

    Jan 1, 1979

  • SME
    Tunnel Boring Machine to be Used on Australian Decline Tunnel

    On Dec. 20, 2013, an 8-m (26.2-ft) diameter Robbins hybrid single shield/earth pressure balance tunnel boring machine (EPB TBM) was launched to bore the Grosvenor decline tunnel for Australia?s Anglo

  • AUSIMM
    Tunnel Boring Machine Usage Speeds up Development at Stillwater Mine

    By D Willis, A Shanahan, C Jacobs, T Luxner

    The application of tunnel boring machines (TBM) for reef mining is a unique practice with benefits over current mining methods given the right geology and geometry of the orebody. The Stillwater Minin

    Sep 17, 2014

  • SME
    Tunnel Boring Machines in Hong Kong

    By Ian McFeat-Smith, Odd G. Askilsrud

    Introduction Given the mountainous nature of the local igneous terrain, hard rock tunnelling plays an important role in the development of Hong Kong's infrastructure. In 1990, tenderers for

    Jan 1, 1993

  • AUSIMM
    Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia

    By M Rauer

    With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral

    Sep 17, 2014

  • SME
    Tunnel Boring Under Coal Mining Conditions

    By H. Dr. Boldt, J. Dr. Henneke

    PREFACE In German coal mines the application of tunnel boring machines has become a very effective and economic technique for major development works. After initial trials around 1970 the breakthro

    Jan 1, 1981

  • AUSIMM
    Tunnel Boring Under Stockholm City

    Boring of a 7.5Km long tunnel under the city of Stockholm commenced in January, 1987. The 3.5m diameter tunnel will pass under the buildings and as no ground settlement is allowed, the regulation f

    Jan 1, 1987

  • SME
    Tunnel Boring With Hydraulic Debris Disposal

    By W. Setzepfandt, J. Henneke

    PREFACE Debris disposal can very often be a severe problem and major restriction on tunnel boring projects, especially for small diameter tunnels and in underground mines. Hydraulic transport could

    Jan 1, 1981

  • SME
    Tunnel Condition Assessment: State of the Practice - RETC2023

    By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani

    In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con

    Jun 13, 2023

  • AUSIMM
    Tunnel Construction by TBM Sand Bar Hydroelectric Project

    This paper discusses the recently com- pleted TBM-driven pressure tunnel at the Sand Bar Hydroelectric Power Project. The Sand Bar Project is a diversion scheme situated on the middle fork of the S

    Jan 1, 1987

  • ISEE
    Tunnel Construction Efficiency and Vibration Control using Electronic Detonators: Focusing on the Contour Holes and Decking Mode

    By Sami Kara, Yunseok Park, Seung-Joong Lee, Namsun Hwang, Michael Laing

    This study conducts a comparative analysis of construction efficiency. In the first part we compared electronic and non-electric initiation systems, focusing on tunnel contour holes. Field blasting op

    Jan 21, 2025

  • SME
    Tunnel Construction For The Muck Valley Hydro Project

    By Jorge Martinez

    The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engi

    Jan 1, 1989

  • SME
    Tunnel Construction For The Sao Paulo Subway

    By Luiz Roberto Amaral, Peter Frobenius

    Construction of the first phase of the Sao Paulo Metro, the North-South Line, will be completed late in 1974. The downtown section of this line consists of 2.2 miles of 19.6-foot diameter soft ground

    Jan 1, 1974

  • SME
    Tunnel Construction in Difficult Site Condition for the Longest Highway Tunnel in Himalayan Ranges—India

    By Alok Garg, Rajeev Kumar Dayal

    The Himalayan ranges have complex geological formation induced with locked up tectonic stresses and squeezing ground conditions. High overburden, steep slopes, perennial snow, and forest cover restric

    Jan 1, 2001