The Design and Performance of Underground Explosion Barriers ù A ReviewBy T O&apos, Beirne
The paper focuses on explosibility conditions in underground coal mines, the behaviour of explosions from initiating gas ignitions to violent dust explosions and the effectiveness and limits of operat
Jan 1, 1997
-
The design and scale-up of a new flotation cellBy A. L. Hinde, P. J. D. Lloyd, D. Hebden
The philosophy behind the design of a rougher cell for the handling of coarse feed and for the maximization of recovery within a given time is presented. The application of this philosophy in cells of
Jan 1, 1983
-
The Design And Selection Of Powered Supports For Application In 4.5 Metre Extraction At Daw Mill CollieryBy Clive Chadbourne
Investigations of world wide coal face strata control practice, the study of theoretical calculations and detailed engineering analysis have been combined to design and select a powered roof support s
Jan 1, 1994
-
The design and testing of pipe-sticks for underground stope supportBy J. J. van Vuuren
Pipe-stick support in deep-level gold mines is first described and illustrated, a pipe-stick being a mine pole trimmed to the required size and sleeved by a pipe. An account is then given of an invest
Jan 1, 1979
-
The Design And Use Of A Laboratory Pellet Plant AnalogueBy Roderick W. F
The equipment and procedures used for green pellet production on a laboratory scale are given, together with a description of the straight grate pellet strand analogue which has been developed to
Jan 1, 1974
-
The Design and Use of Grout Pillars for the Purpose of Holing Longwalls into Pre-driven RoadwaysBy Rob Thomas
It is generally agreed that standing support should be installed in roadways that will for various reasons, be holed through with a longwall. Considering the magnitude of the associated abutment loadi
-
The Design and Use of Novel Devices for Measuring Oxygen Flux Through Covers on Sulfidic Waste RockBy Timms. Greg P., John W. Bennett
A field-based method for measuring the diffusive oxygen flux through covers placed on sulfidic waste rock dumps has been developed and applied at a number of mine sites. The technique provides a means
Jan 1, 2000
-
The Design and Use of Steel Fiber Reinforced Concrete SegmentsBy Michael R. King
The application and use of steel fibre reinforced concrete in precast tunnel lining design is a growing trend due to its advantages in performance over plain concrete, and ease of manufacture compared
Jan 1, 2005
-
The Design Aspects of Centrifugal Pumps for Abrasive SlurriesBy G. Wilson
"Satisfactory hydraulic performance of a centrifugal slurry pump is not the only design criterion. If abrasive wear exists the severity of any damage can be reduced and the life of the wearing parts p
Jan 1, 1973
-
The Design Challenges of a Soft-Ground Twin-Bore Tunnel on a Connection Motorway in NW ItalyBy Shulin Xu, Moreno Pescara, Nicola Avagnina, Piergiorgio Grasso
The Roreto Tunnel is a shallow, twin-bore, road tunnel on the connection between the A6 and the A21 motorway in NW Italy. The challenges faced the design and construction of this tunnel derive from 1)
Jan 1, 2003
-
The Design Criteria Of A New Precision Weighing High Capacity Conveyor ScaleBy Donald Babbitt
In 1971, during the planning and design stages of a $300 million expansion, the Iron Ore Company of Canada Ltd. through its Engineers, Canadian Bechtel Ltd., came out with a preliminary request for tw
Jan 1, 1975
-
The Design Development, and Mining of the Southern 'B' Lode Orebody at NBHCThe Southern 'B' lode orebody at the New Broken Hill Consolidated Limited (NBHC) mine, Broken Hill, is a continuation of the zinc-rich orebody that was first mined in NBHC in the 1940&apo
Jan 1, 1977
-
The Design Of A Backfill System, With Particular Emphasis On Randfontein Estates Gold Mining Company (W) LimitedThis paper details the preliminary design work carried out before and during the implementation of an extensive backfilling programme on Cooke 3 Shaft, Randfontein Estates Gold Mining Company (Witwate
Jan 1, 1988
-
The Design Of A Base Metals Separation ProcessBy P. J. Brown, R. W. Nice
The Thalanga Copper-Lead-Zinc Concentrator in Northern Queensland was commissioned in early 1990. The design of a flotation process for the sequential production of separate copper, lead, and zinc con
Jan 1, 1995
-
The Design Of A Concrete Transport System On Cullinan Diamond MineIn order to deliver a quality shotcrete and concrete product underground for the extensions to the Cullinan Diamond Mine operations it was decided to develop a new, simpler concrete product to meet un
Jan 1, 2006
-
The Design of a Laboratory Apparatus to Simulate the Dust Generated by Longwall Shield AdvancesBy M. R. Shahan, W. R. Reed
A laboratory apparatus (shield dust simulator) was designed and constructed to simulate the dust generated during the advance of longwall hydraulic roof supports, or shields. The objective of the stud
Jan 1, 2019
-
The Design of a Roadway Support System for Dynamic Loads of tremors and RockburstsBy Maloszewski J, Kidybinski A, Sawka B
A forecast of mining conditions in Upper Silesia collieries for the beginning of the 21st century has special focus on average depth of mining, energy of seismic tremors induced by mining and ener
Jan 1, 1988
-
The Design Of A Sand Pump For Optimum ResultsThe design of a sand pump is similar in principle to that of a water pump but differs in several areas. Results of experiments on sand pump performance have been summarized and values of design par
Jan 1, 1973
-
The Design Of A Single Aggregate Concrete On Cullinan Diamond MineA single aggregate mix design was developed based on a slag/Portland binder blend and crusher sand. The primary design criterion, after performance, was the fluidity of the shotcrete and concrete prod
Jan 1, 2006
-
The design of a stoping scraper scoopBy P. van Niekerk, V. J. Solomon
Improvements in the drilling and blasting techniques used in the stopes of narrow reefs have caused the clearing of broken rock to become the major cause of delay in the achievement of a regular cycli
Jan 1, 1979