Search Documents

Sort by

  • IIMP
    Shaft Boring as an alternative to Conventional Mechanised Drill and Blast Shaft Sinking.

    By Jordaan Koos

    This report looks at the application of Shaft Boring (SB) as an alternative methodology to conventional mechanized Drill and Blast (D&B), Shaft Sinking. Various Continuous Mechanized Shaft Sinking con

    Sep 1, 2017

  • CIM
    Shaft Boring with Oil Weil Drilling Equipment at Lynn Lake

    By Peter A. Cain, John C. Folinsbee

    "A 4-ft.-diameter shaft has been drilled to a depth of 2,790 ft. in strong, hard, basic Precambrian rocks at Lynn Lake Manitoba. This was done on the property of Sherritt Gordon Mines Limited for the

    Jan 1, 1966

  • CIM
    Shaft collar in deep overburden – Aur Resources Inc., Louvicourt project

    By R. C. Bryce, G. S. Martin

    "Aur Resources Inc. is the operator of the Louvicourt Mine located 40 km east of Val d'Or. Quebec. Les Entreprises Minieres Redpath Limitée a member of the 1.S. Redpath Group of companies was con

    Jan 1, 1994

  • CIM
    Shaft collaring through deep overburden -a novel approach

    By Jack J. Ayotte, Michael R. Nadon

    "Today's demand for better and more efficient methods inspires new approaches to construction and mine development.A project at Asarco's Aquarius Mine provided a challenge that resulted in t

    Jan 1, 1987

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • SME
    Shaft Construction By Raise Boring Through Artificially Frozen Ground

    By D. E. Hart, A. R. Walsh, Derek Maishman

    In order to safely construct a ventilation and escape shaft through saturated overburden into an operating mine, artificial ground freezing and raise boring were combined for the first time on a proje

    Jan 1, 1991

  • SME
    Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024

    By Jeremy Cawley, Horry Parker Jr., Clint Wilson

    The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam

    Jun 23, 2024

  • SME
    Shaft Construction in Toronto Using Slurry Walls

    By Vince Luongo

    PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located just north of Toronto, Ontario, Canada will see the construction of a tunnel extending a

    Jan 1, 2007

  • SME
    Shaft Construction Through Natural Crude Oil

    By Dale J. Sadowski, Richard J. Switalski, Kyle R. Ott

    This paper discusses design and construction aspects of shaft construction through rock saturated with petroleum hydrocarbons (crude oil). During the subsurface exploration phase for design of the Hil

    Jan 1, 1995

  • ABM
    Shaft Coolers For Efficient And Environmental Friendly Sinter Cooling

    By Michaela Böberl

    State of the art sinter coolers are working based on the cross flow cooling principle. Thus, only a part of the thermal energy can be used for heat recovery application. The other part of the cooling

    Oct 30, 2017

  • SME
    Shaft Design and Construction at the Hampton Roads Bridge-Tunnel - NAT2024

    By Richard Giffen, Martha Gross, Luca Pellegrini, Pa Ousman Njie

    The Hampton Roads Bridge-Tunnel (HRBT) Expansion project in Virginia includes parallel 1.5- mile (2.4 km) tunnels constructed using a tunnel boring machine (TBM). The TBM launching and receiving shaft

    Jun 23, 2024

  • SME
    Shaft Design Criteria ? Introduction

    By Kot F. Unrug

    When reading different studies discussing trends in coal mining, it appears that a substantial expansion of output by the year 2000 is predicted, even in the most pessimistic forecasts. Depletion of s

    Jan 1, 1984

  • SME
    Shaft Development At The Waste Isolation Pilot Plant

    By Dale A. Bivens

    INTRODUCTION The Waste Isolation Pilot Plant (WIPP) is currently being constructed for the United States Department of Energy in SE New Mexico. The purpose of the project is to store low level tran

    Jan 1, 1985

  • SME
    Shaft Development Using Blind Hole Drilling Methods: A Case History

    By A. S. Moss, J. Linkous

    Where difficult shaft sinking conditions exist, it may be appropriate to use a blind drilling technique. The success of the method is in part due to the presence of a drilling mud which fills the shaf

    Jan 1, 1986

  • AIME
    Shaft Drilling - Crownpoint Project

    By Hassell E. Hunter

    The Wyoming Minerals - Conoco Crownpoint Joint Venture represents the first time that big hole drilling has been exclusively used to develop a privately financed mine. Three shafts, one ten feet i

    Jan 1, 1982

  • SME
    Shaft Drilling! A Different Approach To Exploration And Development Of Ore Bodies

    By V. L. Magnus

    The text of this chapter was not received in time for printing.

    Jan 1, 1979

  • DFI
    Shaft End Bearing Capacity In Cavernous Limestone

    By Issa S. Oweis

    Limestone is a sedimentary rock composed primarily of calcite (calcium carbonate). In the presence of an aqueous solution of carbon dioxide (carbonic acid) bicarbonate radicals (2HCO3)- are produced t

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • SAIMM
    Shaft Excavation Method In Soft Soil ? Synopsis (57c66dec-079b-41a9-bafc-ab363857a914)

    By F. N. F. le Roux

    This paper describes the method used for excavating the upper 33m of emergency access shaft E2 for the underground single track tunnel running between Park and Rosebank station of the Gautrain Rapid R

    Jan 1, 2009

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959