Search Documents

Sort by

  • AUSIMM
    Savage River Mines Concentrator and Pumping Operation

    The Savage River Mines concentrator and pipeline has operated for seven years. During this time some problems of general interest have been overcome, particularly in the area of autogenous grinding

    Jan 1, 1975

  • AIME
    Savage River Mines Project Is Dedicated

    The new, internationally-owned Savage River Mines iron ore mining, concentrating and pelletizing project, built and operated by Pickands Mather & Co. International, was dedicated March 6 at Port Latta

    Jan 4, 1968

  • AUSIMM
    Savage River Mines The World's First Long Distance Iron Ore Slurry Pipeline

    By Davis RA, Wasp EJ, Cowper NT

    The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed

    Jan 1, 1969

  • SME
    Savage River Mines The World's First Long Distance Iron Ore Slurry Pipeline (95ef4bc8-b1e0-4cc3-a83b-5d9b8bd12eba)

    By W. F. McDermott

    The transportation of solids by pipeline is not new. In 1891 a United States patent broadly covering a method of pumping coal with water was granted to W. C. Andrews. His pilot plant was constructed o

    Jan 1, 1968

  • ISEE
    Save the Plant

    By James Camp

    "During the 1950's a cement plant was rebuilt along a Missouri River bluff. The escarpmentwas composed of inter_bedded shale and limestone, typical to western Missouri. All of theraw materials needed

    Jan 1, 1993

  • CIM
    Save Time and Money in Industrial Mineral Plant Start-ups

    By Michael G. Rulff, Tracy M. Holmes

    "Vast amounts of time and money are spent fighting flow problems in plants that involve the handling or processing of industrial minerals. Because these types of projects tend to be capitalintensive,

    Jan 1, 2008

  • SME
    Save Your Energy and Improve Your Productivity

    By W. J. Kennedy, John D. Gardner

    Introduction During the past 10 years, energy costs in mining have risen from about 4% to as much as 25% of total production cost. When combined with declining ore grades, these costs exert inordinat

    Jan 11, 1983

  • AUSIMM
    Saving Money on Safety

    A major problem with many items of underground equipment is that they have either been converted or adapted from surface equipment, or that they have been designed and assembled in comfortable offices

    Jan 1, 1992

  • ISEE
    Saving Time and Money with Mobile Reporting and Online Databases

    By Matt Slezak, Tristan Worsey, Nathan Rouse, Kyle Hall

    As everyone knows, blasters are required to file blast reports of every blast for regulatory purposes. To this day, the authors see many handwritten blast reports. Handwritten blast reports are notori

    Jan 1, 2018

  • AUSIMM
    Saving Your Back(s) (Reducing Overbreak and Perimeter Damage Through the Safe and Cost-Effective Application of Drill and Blast)

    Over the last 15 years working in the mining, construction and extractive industries, one of the areas that has always concerned and at the same time drawn the author to it is the application of drill

    Jan 1, 1999

  • AIME
    Savings Vs. Savagery

    By Rudyard Kipling

    Through the courtesy of the British Museum of Natural History we have received a copy of an address delivered by Rudyard Kipling at Folkestone, Feb. 15, 1918. We take pleasure in reproducing it in ful

    Jan 9, 1918

  • SAIMM
    Sawability Prediction Of Carbonate Rocks From Brittleness Indexes

    By O. Gunaydin

    Performance measurements of large-diameter circular saws were conducted on eight different carbonate rocks in marble factories located in some areas of Turkey. Rock samples were collected from these f

    Jan 1, 2004

  • SME
    Sawdust-supported passive bioremediation of western United States acid rock drainage in engineered wetland systems

    By D. N. Thompson, R. L. Sayer, K. S. Noah

    Economical remediation of acid rock drainage (ARD) at secluded high-altitude western ore mines is difficult given the current treatment technology. Several passive-engineered systems that are based on

    Jan 1, 2000

  • SME
    SAWS W-6 Upper Segment: Construction for Future Generations - NAT2024

    By Jason Swartz, Gerardo Gomez, Henry Leighton

    San Antonio has experienced sustained growth for decades, putting increased pressure on existing wastewater infrastructure. In June 2013, San Antonio Water System (SAWS) reached a Consent Decree agree

    Jun 23, 2024

  • AUSIMM
    Saxonvale Mine Development a Case Study in Project Planning and Project Management

    Saxonvale mine is a multi bench open pit coal mine developed to its Stage I capacity of 1.75 Mt/y of run of mine coal. Detailed engineering studies for the mine commenced in April 1980, approval t

    Jan 1, 1983

  • ABM
    Saúde De Ativos E Manutenção Por Condição Na Instrumentação De Usinas De Tratamento De Minério De Ferro

    By Juliene Beatriz de Oliveira Ragonesi

    O objetivo do trabalho é criar um método capaz de gerar indicadores de inspeção preditiva dos ativos de instrumentação, utilizando dados colhidos de recursos existentes (PIMS – Plant Information Manag

    Aug 17, 2017

  • ABM
    Sbq Production With Optimized Machinery Design And Process Parameters Of The 3-roll Rsb Scs®

    By Patrick Edward Connell

    The next generation of the well-established 3-roll Reducing & Sizing Block (RSB), the RSB SCS® is the latest milestone in reducing and sizing technology for SBQ products. It offers enhanced bar qualit

    Aug 16, 2017

  • AUSIMM
    SBRE framework – application to Olympic Dam deposit

    By D Clarke, I Minniakhmetov

    This paper describes the application of the SBRE framework to model the Olympic Dam deposit, one of the largest copper and uranium deposits in the world. Geostatistical simulations are the best practi

    May 24, 2023

  • AUSIMM
    SBRE – a simple, flexible and scalable framework to perform conditional simulations for uncertainty quantification

    By J Ashford, Minniakhmetov

    Geostatistical simulations are the best practice for uncertainty quantification in non-linear systems. Simulations are currently undertaken on an ad hoc basis in the mining industry due to high requir

    Mar 22, 2022

  • SME
    Scalable Framework for Worker Safety Assessments Inspired by Navajo Nation Mine Reclamation - SME Annual Meeting 2026

    By Ashley Woodward, S. Katharine Hammond, Mayela Padilla-Salas

    This paper presents a scalable framework for worker safety assessments. The paper focuses on uranium mine reclamation in underserved communities, specifically Cove Chapter of the Navajo Nation. By int

    Feb 22, 2026