    Risk Quantified Ore Control in Open Pit Gold Mining

    By Coskun B

    The classification of selective mining units (SMU's) and the assignment of grades to those classified SMU's are very important in open pit mining, especially for precious metal mining. Dur

    Jan 1, 1998

  • SME
    Risk Ranking In Tunneling Projects With Fuzzy Electre Method

    By A. Yazadni-Chamzini

    Risk ranking of projects is one of the importance parts of the complicated risk management procedure. Recognizing the riskiest criteria enable the managers to plan for risk reduction. The first stage

    Jan 1, 2012

  • SME
    Risk Reduction and Performance Improvement through TBM Robotization

    By Salam Moubarak, Thomas Camus

    "INTRODUCTION Since the introduction, several decades ago, of the first concepts of tunnel boring machines (TBMs), the unremitting increase of mechanized and automated tasks and the reduction of manua

    Jan 1, 2016

  • SME
    Risk Related to PPP Tunneling Projects for Design Professionals

    By David J. Hatem

    Tunnels and underground projects are inherently more risky than vertical projects, which typically utilize more conventional design and construction approaches and are undertaken in the context of rel

  • SME
    Risk Sharing Principles in Tunnel Contracts

    By Eivind Grøv

    "INTRODUCTION Tunneling and underground excavation is related to handling of uncertainties, risks associated with geological conditions are significant and ‘unexpected geological conditions’ often cla

    Jan 1, 2016

  • CIM
    Risk Simulation of Aquifer CO2 Disposal from Thermal Power Plants

    By Samuel Frimpong

    Green house gases have become a major concern within the international community over the last two decades due to their potential link to global warming. Carbon dioxide (CO2) is the principal greenhou

    May 1, 2001

  • AUSIMM
    Risk Transfer in a Hard Insurance Market

    The current insurance market has been brought about by a number of pressures, including: collapsing investment returns; growing losses, both normal and catastrophic; and reserve strengthening. Th

    Jan 1, 2003

  • CIM
    Risk Weighted Cash Flow, a Communication Tool for Engineers and Financial Professionals on New Technology Projects

    By Mark Kennedy, Allan MacRae, Cameron Hams

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2011

  • METSOC
    Risk Weighted Cash Flow, A Communication Tool For Engineers And Financial Professionals On New Technology Projects (d41d36b5-72c1-4d61-8c6a-fe26069e74d8)

    By Mark Kennedy

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2013

  • AUSIMM
    Risk, Responsibility, Return û Geotechnical Practice in Mining

    Geotechnical practice combines the site engineering geological model with engineering design and operations to control risk. The responsibility of the geotechnical professional is to present relevant

    Jan 1, 2004

  • AUSIMM
    Risk-based approach for minimising tailings dam failures

    By M Barker, H Li

    The total number of tailings accidents has reduced from over 50/decade in the 1960s-1980s to less than 30/decade in the 2000s to 2010s. However, the rate of significant tailings dam failures has not

    Jul 23, 2018

  • IOM3
    Risk-based approach to setting of flyrock danger zones for blast sites

    By P. A. Davies

    Paper presented at the conference: Risk assessment in the extractive industries, held in Exeter, UK, 23-24 March 1994, and first published London: IMM, 1994, preprint volume, 11pp., 15 refs. Hazards s

    Aug 1, 1995

  • SME
    Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023

    By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda

    The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se

    Jun 13, 2023

  • SME
    Risk-Based Evaluation of Life-Cycle Costs for the Upper Northwest Interceptor

    By Samuel J. Gambino

    Preliminary recommendations for the Upper Northwest Interceptor 1&2 specified installation of reinforced concrete pipe using pipe-jacking methods. However, a larger one-pass tunnel constructed using p

    Jan 1, 2008

  • ISEE
    Risk-based Explosives Safety Assessment In Switzerland And Europe

    By Andreas Bienz

    The safety of persons from accidental explosions and fires during manufacture, storage, transport etc. of explosives, pyrotechnics, propellants, firework and ammunition is most commonly assessed accor

    Jan 1, 2007

  • AUSIMM
    Risk-Based Ore Selection from Conditionally Simulated Block Models

    By J E. Everett, F Grobler

    This study considers realistic data for a planned open pit iron ore mine, but is applicable to any open pit situation. By interpolating drill hole data, grades are generated for a rectangular block mo

    Aug 12, 2013

  • AUSIMM
    Risk-based Rehabilitation Strategies for Post-mined Land in Fiji

    By J J. Robinson, B N. Noller, D M. Franks, G McIlveen, D R. Mulligan, A T. Soro

    Fiji is a developing nation that relies on economic opportunities and recently experienced increased interest in mining and mineral exploration that could potentially benefit the country. In order to

    Jul 16, 2014

  • SAIMM
    Risk-based slope design: Insights from the Thabazimbi failure

    By T. Dlokweni, M. Bester, C. Koegelenberg, I. Basson

    Certain degrees of safety, economic, and financial risk are implicit in any mining operation. At Thabazimbi Mine, slope stability was one of the major sources of risk, largely due to data uncertaintie

    Sep 1, 2025

  • SME
    Risk-Based Ventilation Design for a Long Bidirectional Road Tunnel - NAT2024

    By Reinhard Gertl, Soroush Dabiri, Juan-Carlos de Rueda

    The Tunnel of Guillermo Gaviria Echeverri, spanning 6.05 miles, will be Latin America’s longest road tunnel, is currently under construction in Colombia’s Antioquia Department with a single bidirectio

    Jun 23, 2024

  • IOM3
    Risk-cost-benefit analysis for support design in burst-prone mines

    By P. K. Kaiser, R. K. Brummer

    Paper presented at the conference Risk assessment in the extractive industries, held in Exeter, 23-24 March 1994. A risk-based decision-making procedure has been developed for selecting rockburst-resi