Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Residual Loads Measurements in Driven Steel H-PilesBy Reda M. Bakeer
"Measurements obtained during load testing of two steel H-piles driven at a site in Northeastern Mississippi are discussed. The general site conditions, equipment used, testing procedures and results
Jan 1, 2017
-
Residual Ores And Their DistributionIn deposits in which the secondary zones are well defined a layer of rich oxidized ore is frequently found immediately to overlie the enriched sulphides, from which it is derived by direct oxidation i
Jan 1, 1932
-
Residual Ores and Their Distribution (dd8988d4-3c82-45d9-9dc1-857d3cfe0fae)By C Gunther
In deposits in which the secondary zones are well defined a layer of rich oxidized ore is frequently found immediately to overlie the enriched sulphides, from which it is derived by direct oxidation i
Jan 1, 1932
-
Residual Stress Analysis Within Steel Encapsulated Metal Matrix Composites Via Neutron DiffractionBy Chaoying Ni, Dimitry Sediako, Prashant Karandikar, Sean Fudger
Neutron diffraction measurements were performed on steel encapsulated metal matrix composites (MMCs) in order to quantify bulk residual stresses. A coefficient of thermal expansion (CTE) mismatch indu
Mar 1, 2017
-
Residual Stress in Caliber 0.30 Cartridge Cases ? with Discussion on Residual StressBy J. Mazia, H. Rosenthal
An investigation has been made of residual stress in the head and body of caliber 0.30 cartridge cases. The head was divided into four ring-lie sections which were cut off by a jeweler's saw. Spr
Jan 1, 1945
-
Residual Stress In Sunk Cartridge-Brass TubingBy G. Sachs, G. Espey
IT is well known that high residual stresses are created in tubing by the sinking process, in which no internal tool or mandrel is used.1-4 In this process, the wall thickness is usually slightly incr
Jan 1, 1941
-
Residual Stress Mapping in the Interbore Region of a Heat Treated Aluminum Engine BlockBy D. Sediako
Excessive residual stress in Al engine blocks may result in cylinder distortion which reduces engine operating efficiency. As such, neutron diffraction was used to measure residual strain along the Fe
Jan 1, 2011
-
Residual stresses in cylindrical rock samplesBy G. Vouille, P. Bérest
Residual stresses observed in rocks often result from non-compatible initial strains. These stresses can be determined when the incompatibility tensor associated with the initial strain tensor is know
Jan 1, 2003
-
Residual Stresses Induced by Robitized Hammer Peening: The Effect of Impact Energy LevelBy L. Hacini, N. Van L ê, P. Bacher, D. Thibault
Manufacturer welded components may suffer from high level of residual stresses which can cause premature cracking and decrease the life of the components if they reach values close to the yield streng
Jan 1, 2006
-
Residue Smelting in a Slag BathBy D Langberg, R Taylor
Many metallurgical operations produce fine residues and dusts as by-products which can be difficult to handle and offer little direct financial incentive to treat. There is a growing imperative to dea
Jan 1, 2002
-
Residue Treatment Plant Practice at Risdon, TasmaniaBy Garrigan J. S, Oakes I
Current operating practice in a plant commissioned some five years ago to treat ferritic zinc plant residue by the "Jarosite" process is described. Major problems overcome include obtaining reliabl
Jan 1, 1977
-
Residues from Lead, Zinc and Copper Industry and Their Possible Contribution to the Supply of Selected Minor ElementsBy Juergen Antrekowitsch, Stefan Steinlechner
"Within the last decades, mainly the base metals, like zinc, copper and lead were recycled from different industrial residues without taking into account that accompanied minor side-elements are often
Jan 1, 2016
-
Residues from the Zinc Industry – A Potential Future Resource for Silver and IndiumBy S. Steinlechner, S. Wegscheider
"In the past, the metallurgical industry was most of the time dedicated on their main commodity, recovering base metals like zinc, copper or lead but leaving other valuable side elements in the genera
Jan 1, 2016
-
Resilencia de las operaciones de minado en Toquepala, dentro del marco de la pandemia global por COVID19By Karla Ticona, Anthony Saldaña, Lourdes Cacya
La aparición del virus SARS-CoV2-2 en la ciudad de Wuhan China y su propagación vertiginosa en el mundo (OMS, 2020), frenó e impactó severamente los sistemas económicos, entre ellos la actividad miner
Sep 29, 2023
-
Resilient Design of Large Open Pit SlopesBy S M. Arndt, D Tyler, F Reusch
Although significant advances have been made in understanding the mechanics of pit slopes, numerical modelling hasnÆt significantly impacted on the reliability of the design process. It is well known
Jan 1, 2007
-
Resin Annulus Size Effects On Rebar Bolt Pull Strength And Resin Loss To Fractured RockBy Al Campoli
One of the critical variables affecting resin bolt performance is the size of the resin annulus, defined as the difference between the hole and bolt radius. The vast majority of the millions of resin
Jan 1, 1999
-
Resin Bolting Cost Reductions At The White Pine MineBy John Conway, Gerald Bennett, John Herrick
Research efforts which have led to reduced resin bolting costs at White Pine Mine are described. Key factor was development of the capability to drill small holes (1 1/8 in. diam) in the hard (20,000-
Jan 1, 1974
-
Resin Bonded Bolting in French Coal MinesRoof bolting with resin bonded bolts has been developed extensively in French coal mines. There are three aspects of this development: 1. The reason for and the care used in the development of roof
Jan 1, 1971
-
Resin Encapsulated Rock Bolt Practices at Mount Isa MinesBy I Thin, I Sheppard
Resin encapsulated rock bolting practices have been adopted by Mount Isa Mines since the early-1980s. Fully encapsulated rock bolt systems meet designated requirements for long-term ground support in
Jan 1, 2002
-
Resin Rock Bolting In CoalBy W. B. Beerbower
Resin bolting has enjoyed wide acceptance for coal mine roof support. Beginning in 1973, the first year of significant resin bolting in coal mines, we estimate that 2.5MM resin bolts were installed. T
Jan 1, 1977