Search Documents

Sort by

  • AUSIMM
    Reopening the Golden Mile

    By Cleghorn JH

    Underground mining operations on Kalgoorlie's Golden Mile were suspended in 1976, suffering the combined effects of low gold prices and grades. A subsequent substantial increase in the gold price

    Jan 1, 1984

  • AUSIMM
    Reopening the Tasmania Mine

    The project to reopen the Tasmania Mine has centred around efforts to reopen the Hart Shaft to access the high grade reef remaining below the old workings, which extend down to 457 in. Efforts in 1

    Jan 1, 1989

  • SME
    Reorganisation of Mine Rescue Services Scheme in Central Europe

    Due to the ongoing restructuring of the mining industry in central Europe with a continuous decline of the number of large underground mines and collieries, and a simultaneous decline of staff numbers

    Feb 23, 2014

  • AUSIMM
    Reorganization of Bulli Colliery with Special Reference to Haulage Problems

    The following is a brief summary of the Bulli Colliery and its method of operation when Australian Iron and Steel Ltd. took control.Bulli Colliery is situated about a mile west of the village of Bulli

    Jan 1, 1947

  • AIME
    Reorganization Of Bureau Of Mines

    Taking advantage of the lessons in administrative organizations which were taught by the war, Director Van H. Manning has put into effect a new form of organization in the Bureau of Mines. The Bureau

    Jan 9, 1919

  • AIME
    Reorganization of New York State Government Proposed by Engineers

    By AIME AIME

    A CORPORATION would go into bankruptcy if its affairs were conducted as are those of the state of New York, according to the Committee on New York State Government Reorganization of the American Engin

    Jan 1, 1921

  • AIME
    Reorganization of the Federal Government

    By Herbert Hoover

    THERE is one problem of the new administration that has received the attention and thought of the organized engineers of America for many years past. This is the problem of the reorganization of the F

    Jan 1, 1921

  • NIOSH
    Reoriented Shearer Water Sprays Move Dust Toward Face - Objective

    Lower the respirable dust exposure of longwall shearer operators with improved water spray systems on the shearer. Approach Orient sprays (rather than relocate them) so that dust is held against

    Jan 1, 1981

  • SAIMM
    Reoxidation And Castability Of Aluminium-Killed Steels

    By R. Rampersadh

    Paper written on project work carried out in partial fulfilment of B Eng (Metallurgical Engineering) degree Steel was sampled after calcium treatment, to follow changes in inclusion composition dur

    Jan 1, 2006

  • AUSIMM
    Reoxidation of Al-killed ultra-low C steel by FetO in CaO-Al2O3-MgOsat.- FetO slag representing RH slag by experiment and kinetic modelling

    By Y-B Kang, W-Y Cha, Y-M Cho

    Molten slag used in the secondary refining process (RH process) for the production of Ultra-Low C (ULC) steel is typically composed of CaO-Al2O3-MgOsat.-FetO with minor constituents. FetO in the RH sl

    Jun 19, 2024

  • SME
    Repair And Reconstruction Of Interceptor Sewers Newtown Creek Project

    By Timothy P. Smirnoff, Arthur P. Chase, Herman J. Smith

    INTRODUCTION The Newtown Creek Pollution Control Project (P.W. 53) is a major system of facilities designed to collect wastewater from large areas of the Boroughs of Manhattan, Brooklyn and Queens,

    Jan 1, 1979

  • DFI
    Repair Methods For Corroded Steel Piles

    By C. Vipulanandan

    With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but als

  • DFI
    Repair Methods for Corroded Steel Piles (0af709a8-9f1e-4f35-81ea-c69c3ee7fb05)

    By C. Vipulanandan, M. Dawood, Dongmei Pan

    "With the aging infrastructure, there is a need to maintain and extend the service life of steel structures in general and steel piles in particular. Steel piles support not only vertical loads but al

    Jan 1, 2017

  • SME
    Repair of a Failed Reinforced Concrete Adit Tunnel with Carbon Fiber Wrap - NAT2024

    By Daniel Willis, Ryan O’Connell

    An 8-foot tall horseshoe adit tunnel located within an abutment of the Mount Morris Dam in Mount Morris, NY required repair of a failed reinforced concrete liner. The adit tunnel is entirely founded w

    Jun 23, 2024

  • DFI
    Repair Of Deep Foundations - Summary

    By Dennis W. Boehm

    The building boom of the late 1970's and early 1980's has all but used up most of the better sites across the more populated metropolitan areas of the United States. This means that current

    Jan 1, 1999

  • CIM
    Repair Process Development for Blisk Applications in Aero Engines

    By L. Zhu, S. Kaierle, M. Dahmen, C. Zimmermann, T. Haubold, I. Kelbassa, C. Mattern

    Application of integrally bladed disks (blisks) is of increasing interest in compressors of aero engines. Blisks are preferred due to their potential for size and weight reduction, for increased perfo

    Jan 1, 2006

  • CIM
    Repair Technologies: Past and Present

    By Raj Thamburaj

    "Over the last few decades, the emphasis on affordability and reduced cost of ownership has necessitated the development of innovative processes to carry out repairs in aero engine components. Convent

    Jan 1, 2010

  • SME
    Repair the Fan, Save Money

    By Thomas J. Kuli, Tim Rape

    When a fan or blower breaks down or becomes worn, customers have two choices. They can replace it or they can have it repaired. In the past, replacement was the preferred option, especially when the

    Jan 1, 2005

  • SAIMM
    Repair works and tests at the Rossio tunnel, Portugal

    By F. Pinto, J. V. Lemos, A. Sousa, L. Ribeiro e Sousa

    The Rossio railway tunnel was built in 1890 crossing several formations involving limestones, basalts and also sandy and clayey formations. Due to the fact that it is an old underground structure reha

    Jan 1, 2003

  • SME
    Repairing Conveyor Belting Without Vulcanising

    By A. J. Friedrich

    Conveyor belts are designed to go unnoticed. When they work well, they attract little attention. When they are not doing the job right, it is noticeable, and they need to be fixed immediately. Vulcan

    Jan 1, 2000