Search Documents

Sort by

  • SME
    Railroads In The 80?s ? A Stronger Link Between Mine And Markets

    By William M. Gray

    [The products of mites hive historically beet a very large and important segment of total shipment transported by American Railroads. Much as the Mining transportation Executives right have wished for

    Jan 1, 1985

  • AIME
    Railroads, Coal, And Lumber

    By Robert Glass Cleland

    UPON the death of its founder, Phelps, Dodge & Co. entered upon a new chapter in its long and varied history. Thereafter, for nearly a decade, William E. Dodge largely determined and executed the poli

    Jan 1, 1952

  • AIME
    Railway Electrification

    "The Butte, Anaconda & Pacific railway extends from Butte to Anaconda. The electrification comprises 30 miles of main line single track, and includes sidings, yard and smelter tracks. When complete th

    Jan 1, 1913

  • AIME
    Railway Resistances

    By P. H. Dudley

    IN giving a brief account of the experiments in progress to inquire into some of the facts in regard to "railway resistances," recently commenced upon the Lake Shore and Michigan Southern Railway, wit

    Jan 1, 1876

  • SAIMM
    Railway tunnel design against karstic collapse in Korea

    By Y. H. Suh, H. C. Lee, D. S. Kim

    A progressive karst formation and its influence upon engineered structures in the ‘phil-karst’ rock mass draw a tunnel engineer’s special attention to a long-term stability and the maintenance issues.

    Jan 1, 2003

  • SME
    Rain Underground Mine, 1993-2002 Mining A Low-Grade Gold Resource In Weak Rock

    By M. Kockler, S. J. Jung

    Underground operations at the Rain Mine averaged 360 tonne/day (400 ton/day) utilizing underhand drift-and-fill and longhole stoping with delayed fill between 1993 and 2002. Mining from four ore zones

    Jan 1, 2004

  • AIME
    Rainbow Falls Development

    "Coulter's Rainbow and Crooked Falls are situated about five miles below the City of Great Falls. Coulter's, the first of the series in the course of the river, is unimportant and has been submerged b

    Jan 1, 1913

  • AIME
    Rainbow Sub-Station

    "The 100,000 volt sub-station at Butte is located near the center of the district in which the power is distributed. The sub-station building is 150 feet by 50 feet in plan and 50 feet high. It is a b

    Jan 1, 1913

  • AUSIMM
    Rainfall Patterns Rather than Climate Classification Control Cover Design for Closure

    By T Baumgartl, B Richards

    Covers on waste rock and tailings remain the primary choice for closure planning where the purpose is to create an environment where water ingress into reactive material can be controlled and/or preve

    Jun 28, 2016

  • CIM
    Rainfall-Induced and Structurally-Controlled Slope Failure and Rockfall Incidents along part of Werka Descent Road and Remedial Measures, North West of Saudi Arabia

    By B. H. Sadagah

    "Construction of mountain roads at north westerly Saudi Arabia is a difficult task in rugged terrains, where the rock masses are steep slopes, and full of geomorphological constraints.Werka descent li

    Jan 1, 2015

  • SAIMM
    Rainfall-induced groundwater ridging and the Lisse effect on tailings storage facilities: A literature review

    By S. A. Lorentz, Y. Xu, C. Theron

    The failure of tailings storage facilities (TSFs) results in the discharge of significant quantities of hazardous waste material into the natural environment. Research studies relating to slope instab

    Feb 2, 2022

  • SAIMM
    Raise and Shaft Drilling, A Continuing Development

    By Richard J. Robbins

    Raise and shaft drilling, a continuing development RICHARD J. ROBBINS* (Visitor) Although the past decade has witnessed many improvements in large-diameter drilling machinery for the boring of raises,

  • AUSIMM
    Raise bore stability and risk assessment empirical database update

    By A Penney, M J. Pascoe, R M. Stephenson

    The empirical McCracken and Stacey stability and risk assessment method has been in use for more than 20 years to assess geotechnical stability issues for raise bored shafts. The methodology has been

    Nov 30, 2018

  • AUSIMM
    Raise Bored Shafts in Decline Mines

    Western Mining Corporation (WMC), managers of the Windarra Nickel Project, installed a raise-bored haulage shaft and underground crushing system at the Mt Windarra Nickel Mine in 1982. The system is t

    Jan 1, 1984

  • SME
    Raise Borers Applied Horizontally

    By William T. Folwell

    INTRODUCTION - CURRENT RAISE BORING PRACTICES Raise boring is a comparatively new tool to the underground mining and construction industries. Underground raise boring, in this country, had its begi

    Jan 1, 1997

  • CIM
    Raise Boring - A Worldwide Endeavour

    By John G. Ayttes

    "The following is a review of the advance of raise boring and its current position. The viewpoint presented is that the mining industry, through its worldwide acceptance of raise boring, has acknowled

    Jan 1, 1972

  • SME
    Raise Boring - The Reaming Cycle

    By Euclid P. Worden

    INTRODUCTION Today, conventional raise boring is an accepted method of development in underground mines and on major construction projects. Over the years that this technique, and its associated ma

    Jan 1, 1985

  • SME
    Raise Boring At The International Nickel Company Of Canada, Limited Ontario Division (4c5e1c18-f72d-4ce0-b50f-e1b8418cadf0)

    By J. R. England, W. J. Taylor

    The Sudbury Basin is the scene of the mining operations of the Ontario Division of the International Nickel Company of Canada, Limited. Around the rim of the geological formation and within thirty mil

    Jan 1, 1974

  • CIM
    Raise Boring at The International Nickel Company of Canada,• Limited, Ontario Division

    By W. J. Taylor, T. D. Parris

    "Over 90,000 feet of raise have been bored at International Nickel underground mining operations throughout the Sudbury District since the advent of raise boring in the early part of July, 1964. With

    Jan 1, 1972

  • CIM
    Raise Boring Machines with Solid-State DC Drives

    By Lyle F. Smith

    With the demand for larger diameter raises under all ground conditions and the increasing price of drill rods and operating costs, it was evident that there was a need for a raise borer with a variabl

    Jan 1, 1978