Search Documents

Sort by

  • CIM
    Process Development for Milling B-Zone Ore at Rabbit Lake

    By S. Dicarlo

    "In late 1985, B-zone ore was first processed through the Eldor Mines mill at Rabbit Lake. Extensive modifications had been completed in order to mill this ore. In-plant process development was initia

    Jan 1, 1988

  • SME
    Process Development For Recovery Of Cu, Sb And Ag From Tetrahedrite Concentrates

    By Shijie Wang

    The metals of value in tetrahedrite are copper, antimony and silver. A new hydrometallurgical process is proposed to recover these metals from tetrahedrite. The process consists of leaching concentrat

    Jan 1, 2003

  • TMS
    Process Development For Recovery Of Lead As Lead Monoxide From Lead-Bearing Waste

    By Sui Xue

    A process has been developed from laboratory-scale experiments for the aqueous processing of various lead-bearing wastes. The process exploits the limited solubility of lead in sulfate-rich solutions

    Jan 1, 1996

  • SME
    Process Development For Selective Flotation Of Silver, Zinc, And Tin From Huari-Huari Ore

    By J. L. Coburn

    The Huari-Huari ore body is located in Southern Bolivia, at an elevation of approximately 3,800 meters above sea level. The ore is a complex massive sulfide, slightly marmatitic sphalerite, in a fault

    Jan 1, 1977

  • SME
    Process Development For The Eskay Creek Project

    By John Turney, John Gathje, Donald Gale

    The Eskay Creek deposit, located in northern British Columbia, is a high-grade gold/silver ore associated with complex polymetallic sulfides. Process development began in 1989 and continued through 19

    Jan 1, 1995

  • AUSIMM
    Process Development for the Marampa Iron Ore Tailings Project, Sierra Leone

    By P Dunn

    Following civil war in Sierra Leone, London Mining Plc obtained the mining license in 2006 and commenced activity to redevelop the Marampa mining and processing operations. The Sierra Leone Marampa mi

    Jul 11, 2011

  • AUSIMM
    Process development for the Mina Justa project

    By I Ritchie, A Johnston, D Yataco

    Marcobre SAC (Marcobre) is developing the Mina Justa copper mine project, located in the Ica region of Peru. The Mina Justa IOCG orebody comprises of a sulfide mass overlain by an oxide cap with a sha

    Sep 11, 2017

  • CIM
    Process Development for the Recovery of Critical Materials from Electronic Waste

    By P. Keller, T. E. Lister, G. G. Clark, L. A. Diaz

    As electronic technology continues to evolve there is a growing need to develop processes which recover valuable material from antiquated technology. This need follows from the environmental challenge

    Jan 1, 2016

  • SME
    Process Development For The Sagasca, Chile, Oxidized Copper Ore Deposit - History

    By Earl L. Rau

    Although the Sagasca deposit has been known for 76 years, the property was never put into successful operation because of various adverse factors including low market price for copper, legal entanglem

    Jan 1, 1970

  • SME
    Process Development For Value-Added Products From Primary Kaolin Resources In Minnesota

    By M. S. Prasad

    In earlier work it has been shown that paper filler clay products can be obtained from primary kaolin deposits of Minnesota. The objective of the current work was to reduce silica and iron contaminant

    Jan 1, 1991

  • SME
    Process Development Metallurgical Studies for Gold Cyanidation Process

    By S. Acar

    "In recent years the gold mining industry has been challenged by declining metal prices as well as having to treat ores that have low grades and are refractory in nature. Many factors must be consider

    Jan 1, 2016

  • SAIMM
    Process Development Of The Nkomati Pcmz Base Metals Sulphide Ore

    By R L. Bowers, D S. Smit

    In light of soaring commodity prices, Nkomati has investigated the potential of processing additional low grade nickel ores to add to their reserves. The Chromititic Peridotite Mineralised Zone (PCMZ)

    Jan 1, 2007

  • AUSIMM
    Process Development of Victorian Brown Coal Liquefaction

    By Matsumura T, Takematsu T

    The Brown Coal Liquefaction Process (BCL Process) has been developed by Nippon Brown Coal Liquefaction Co., Ltd. (NBCL), and a 50-ton-per -day Pilot Plant has been partially completed and put into

    Jan 1, 1987

  • TMS
    Process Development Strategies for Mercury Remediation

    By Jerome P. Downey

    Technologies developed within the field of extractive metallurgy to recover, concentrate, and purify metals and industrial minerals from ores, have served as the foundation for all of the subsequent e

    Jan 1, 2003

  • CIM
    Process Development Studies Carried Out by Dynatec as Part of Tthe Ambatovy Nickel Project Evaluation

    By J. Stiksma, R. Kalanchey, M. J. Collins, G. Owusu, R. Raudsepp, K. R. Buban, L. A. Barta, L. Masters

    This paper describes the results of testwork for the treatment of Ambatovy laterite by an acid pressure leach process, with recovery of the soluble nickel and cobalt values as mixed sulphide intermedi

    Jan 1, 2004

  • SME
    Process Development Testing for Comminution Circuit Design

    "Metallurgical process development in greenfield projects must define the comminution flowsheet and establish the equipment sizes that are required to deliver the project design criteria. These are cr

    Jan 1, 2016

  • TMS
    Process Development: Recovery of Cobalt, Gold and Bismuth from Polymetallic Concentrates-NiCO Deposit, NWT, Canada-Part 1: Leaching

    By A. Mezei

    Samples of cobalt and bismuth concentrates produced from the NICO deposit in Northwest Territories were subjected to a comprehensive metallurgical testwork consisting of: pressure oxidation, ferric ch

    Jan 1, 1999

  • AUSIMM
    Process developments at Bouganville Copper Limited

    The original design of the Bougainville Copper Limited (BCL) concentrator took cognisance of the constraints imposed by the topography, the need to minimise capital cost, and the need to allow for pla

    Jan 1, 1986

  • SAIMM
    Process Developments At Tailings Leach Plant

    By Martin Banda, Gift C. Chisakuta, Moses Chabinga

    KCM made a major modification to the Nchanga Tailings Leach Plant (TLP) changing the circuit from feeding post leach thickeners in parallel with leach discharge for solid ?liquid separation to a Count

    Jan 1, 2005

  • ABM
    Process Developments For Producing Tighter Tolerance Sbq Bar

    By Patrick E. Connell

    During the ABM Conference of 2015 the latest design and process features of the new 3-roll RSB® generation were presented together with a unique Size Control System SCS® for a real time closed loop co

    Oct 30, 2017