Search Documents

Sort by

  • AUSIMM
    Pre-Drainage of Methane in West German Coal Mining

    At the beginning of the seventies pre- drainage of methane was introduced in West German coal mining in order to reduce the gas emission from the worked seam. After three pilot tests on the "Rheinl

    Jan 1, 1982

  • SME-ICGCM
    Pre-Driven Experimental Longwall Recovery Room Under Weak Roof Conditions - Design, Implementation, and Evaluation

    By Stephen Tadolini

    Reduction in the time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use pre-driven longwall recovery rooms. While this concept is no

    Jan 1, 2002

  • SME-ICGCM
    Pre-Driven Longwall Recovery Room Under Weak Roof Conditions ? Design, Evaluation, and Monitoring

    By Peter (Yunqing) Zhang

    Longwall recovery under weak roof conditions could have considerable delay if the immediate roof is weak and deteriorates during screening. A pre-driven longwall recovery room is a feasible solution

    Jan 1, 2006

  • SME
    Pre-Emptive Land Use--Its Impact On The Mineral Base

    By W. L. Dare

    Land use planning is not a new concept in the United States but the emphasis has changed drastically since the early 1960's. Under the old interpretation we tried to expand our frontiers and deve

    Jan 1, 1974

  • DFI
    Pre-engineered Hydraulic Bracing Systems

    By Braxton P. Erbe, Douglas C. Brunot

    A variety of systems and techniques exist to support deep excavations where sloping is not feasible. This paper will explore an example project involving the use of pre-engineered hydraulic bracing sy

  • SME
    Pre-Excavation and Early Work Activities for the Long Baseline Neutrino Facility Far Site - RETC2021

    By Josh Willhite, Seth Pollak, Ben Seling

    The Long Baseline Neutrino Facility Far Site at the Sanford Underground Research Facility in Lead, South Dakota will house four large detector tanks located in deep underground caverns. Construction o

    Jun 13, 2021

  • SME
    Pre-Excavation Drilling and Grouting for Water Control and Ground Improvement in Highly Variable Ground Conditions at the Arrowhead Tunnels Project

    By Brian Fulcher

    The Arrowhead Tunnels Project represents the final portion of a 70 km (44-mile) long water conveyance facility that will bring up to 28 m3/sec (1,000 ft 3/sec) of water into Southern California. The 1

    Jan 1, 2008

  • SME
    Pre-Excavation Grouting at the Hemphill site — Atlanta WSP Tunnel

    By Konner Horton, Adam L. Bedell, Don Del Nero, Brian Jones

    "The City of Atlanta’s Water Supply Program Tunnel project includes a 7,315-m (24,000-ft) long, 4-m (13-ft) diameter, hard rock tunnel. A complex aspect of the project involves connecting five, blind

    Jan 9, 2018

  • SME
    Pre-Excavation Grouting Design Guidelines for Hard Rock Excavations

    By S. Klein, D. Crouthamel, D. W. Farmer, S. H. Phillips

    Groundwater inflows during construction pose one of the greatest risks to the successful completion of tunnel projects. Inflows can result in safety concerns, difficulty in mining and ground support,

    Jan 1, 2005

  • SME
    Pre-Excavation Grouting Effectiveness for Controlling Shaft Inflows in Rock

    By Steven W. Hunt, Phillip U. Santacroce, Roger C. Ilsley

    Consolidation grouting from the surface prior to mining a shaft is commonly performed to reduce groundwater inflows to a manageable rate. This paper describes the inflow reductions obtained within dol

    Jan 1, 1993

  • SME
    Pre-Excavation Grouting Through Water Bearing Zone Under High Pressure Under Extreme Flow Conditions

    By Adam Shang Robert Fu

    The Yung-Chung-Tunnel in Taiwan, constructed for the Taiwan-East Railway Bureau, collapsed during construction when a water bearing, fractured marble zone was intersected. The inflow was approximately

    Jan 1, 2007

  • SME
    Pre-Failure Pillar Yielding

    By J. F. T. Agapito, R. R. Goodrich

    Yield pillars have been used for many years to help reduce stresses near mine openings and improve roof and floor stability. A yield pillar is often defined as a pillar that fails but retains residual

    Jan 1, 2001

  • AUSIMM
    Pre-feasibility and Feasibility Studies : A case for Improvements

    The paper reviews some characteristic features of feasibility studies and discusses the need for a wide scope at the pre-feasibility stage. The performance of recent Australian gold mines against th

    Jan 1, 1991

  • ABM
    Pre-finishing Mill Modernization On The Sterling Steel Rod Mill

    By Kermit Reins

    The most recent modernization phase of the wire rod mill at Sterling Steel involved installation of a pre-finishing mill, using a Morgan Vee Mini-Block, a new water box and shear with utility systems

    Aug 17, 2017

  • SME
    Pre-Formed Linings In Tunnelling Practice

    By Stephen G. Tough, Ted M. Noskiewicz

    INTRODUCTION For many years, in Europe and in North America, pre-formed metallic and concrete segmental linings in tunnels have been used extensively as temporary and permanent ground support syste

    Jan 1, 1974

  • SME
    Pre-Implementation Evaluation of VR as a Mine Safety Training Tool - SME Annual Meeting 2025

    By CASSANDRA L. HOEBBEL, Jennica L. Bellanca

    High-fidelity, immersive training is known for its learning and logistical benefits. While other industries have used virtual reality (VR) for decades, the same uptake has not been seen in mining. NIO

    Feb 1, 2025

  • SME
    Pre-Mining Bed Sediment Geochemical Baseline in the Animas River Watershed, Southwestern Colorado

    By Robert Blair, David L. Fey, Stanley E. Church

    Determination of the pre-mining geochemical baseline in bed sediments in watersheds impacted by historical mining activity is important in establishing watershed restoration goals. We have developed m

    Jan 1, 2000

  • SME
    Pre-Mining Planning For Environmental Control In Surface Coal Mines

    By R. V. Ramani

    Minerals, together with agricultural and forestry products, are the primary source of wealth produced in the United States. Although the production of minerals requires only a small fraction of the st

    Jan 1, 1977

  • SAIMM
    Pre-Mining Stress Model For Subsurface Excavations In Southern Africa

    By M. F. Handley

    This paper covers in situ stresses in the Earth?s crust prior to any man-made disturbances, such as mining. It introduces the Southern African Stress Database, which contains primitive stress measurem

    Jun 1, 2013

  • CIM
    Pre-mining stresses at some hard rock mines in the Canadian Shield

    By 13409, B. Arjang

    "Ground stresses are one of the significant factors in the context of rockbursts and underground instability at some hard rock mines in Canada. Overcoring strain relief measurements using triaxial str

    Jan 1, 1991