Search Documents

Sort by

  • SAIMM
    Pit Slope Design And Risk ? A View Of The Current State Of The Art

    By T D. Sullivan

    Risk lies at the heart of all mining and nowhere more so than in pit slope design. Mining is principally about two areas of risk; safety and economics. This paper addresses the main elements of pit

    Jan 1, 2006

  • SME
    Pit Slope Design Challenges In Residual Soils And Weathered Rock: Background And A Case Study

    By J. Geyer, B. T. Burton, H. W. Newcomen

    For open pits developed in tropical climates the upper portions of the pit walls are often located in residual soils and weathered rock. Due to the presence of relict structures, and the relatively l

    Jan 1, 2000

  • AUSIMM
    Pit Slope Management ù Planning for Your Next Failure in Open Cut Mining

    It is often assumed that geotechnical investigations or studies for open pit mines are confined to providing a slope design. However in an operating mine, the design is only one component of a mine ge

    Jan 1, 2003

  • SME
    Pit slope monitoring and back analysis of the Berkeley pit

    By W. C. Goldberg, E. M. Frizzell

    Monitoring slope displacement in open-pit mines can help predict collapses and prevent serious damage, injuries, and fatalities. Early detection of movement may indicate the need to modify slope geome

    Jan 1, 1989

  • AIME
    Pit Slopes - Their Influence On The Design And Economics Of Open Pit Mines

    By R. B. Moffitt

    INTRODUCTION In recent times the continuing depletion of high grade mineral deposits and the massive increase in raw material consumption have forced the metal mining industry to exploit ore bodie

    Jan 1, 1972

  • SME
    Pit To Plant - Current Trends

    By Allan D. Fernie

    Growing interest in pit crushing and conveying is evident from the many articles, technical papers, and new equipment development recently presented. Application of a pit crushing and conveying syste

    Jan 1, 1983

  • AIME
    Pit To Plant - Current Trends (41dc5c17-34c0-4f1e-a907-1b9b26f7a090)

    By A. D. Fernie

    Growing interest in pit crushing and conveying is evident from the recent many articles, technical papers, and new equipment development. Application of a pit crushing and conveying system is complex

    Jan 1, 1986

  • AUSIMM
    Pit Wall Design Implementation at Mt Whaleback Open Pit Mine, Newman, Western Australia

    By Wagland D. G, Guo H

    The Mt Whaleback orebody is in a complex geological regime. A good understanding of geological structure is essential during the design and implementation stages. The amount of information on the ro

    Jan 1, 1995

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures

    By Phillip M. Dight

    A number of impending and actual pit wall failures have been observed and documented which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • SAIMM
    Pit Wall Failures On ?Unknown? Structures (76621150-30cb-4052-b037-75f5ff3cf933)

    A number of impending and actual pit wall failures have been observed and documented, which have been interpreted to initiate on newly generated structural features. This infers failure through intact

    Jan 1, 2006

  • AUSIMM
    Pit Water Management in a Mine Planning Cycle, Olympic Dam Case Study

    By D Barclay, S Mercer, S Wright

    Mine water management is often an afterthought in mine planning processes and can introduce significant risks to projects when studied as a stand alone component at a later stage in the mine design. I

    Jan 1, 2009

  • AUSIMM
    Pit-Blend Optimisation - A Case Study in Iron Ore

    By Piotto P

    Pit optimisation algorithms are designed to produce a pit with maximum value, but for certain minerals like iron ore, limestone, coal, etc, it is also necessary that the designed pit contains ore whic

    Jan 1, 1996

  • AUSIMM
    Pit-Lake Water Quality in Coal Deposits, Southland, New Zealand

    By D Craw, J Pope, B Peake

    Southland contains over 70 per cent of New ZealandÆs recoverable coal resources, and an investigation into the potential effects of coal mining on SouthlandÆs water resources is therefore of interest.

    Jan 1, 2006

  • SME
    Pit-Limit Parameterization From Modified Three-Dimensional Lerches-Grossmann Algorithm

    By F. Seymour

    A modified three-dimensional Lerches-Grossmann (LG) graph tree algorithm that generates the complete set of nested maximum valued pits in a single run is presented. This modified LG algorithm looks at

    Jan 1, 1996

  • IOM3
    Pit-timber and its preservation.

    By Groom P.

    The wastage of timber in coal-mines that is caused by decay is very great; in fact, far greater in this country than is generally realized. Mr. E. W. Peters estimates that of the whole wastage of timb

    Dec 1, 1916

  • CIM
    Pitchblende Deposits of the Saint Louis Fault

    By R. B. Allen, E. E. N. Smith, B. C. MacDonald

    "LocationTHE MAIN PROPERTY and townsite of Eldorado Mining & Refining, Limited, Beaverlodge Operation, is on the north shore. of Beaverlodge lake, •about seven miles north of the deserted town of Gold

    Jan 1, 1954

  • CIM
    Pitchblende Occurrences of the Goldfields Area, Saskatchewan

    By A. M. Christie

    Acknowledgements The following account has been compiled mainly from records and maps of Eldorado Mining and Refining (1944), Limited, hereinafter called the Crown Company. This work was done under

    Jan 1, 1949

  • SME
    Pitching Seam Operations of Thompson Creek Coal and Coke Corp. ? Summary and Conclusions

    By Andrew Allan

    [The Thompson Creek Coal and Coke Corporation, a. mall company engaged in producing coal in the Rocky Mountains of Colorado, is currently engaged in a struggle of destiny to increase their production

    Jan 1, 1965

  • SME
    Pitfalls And Lessons Learned In Pump Station Construction

    By Steven R. Lowe

    Construction of a pump station, consisting of an inlet chamber, wet well and pump chamber, required excavation to a depth of 9.7 m (32 ft) below ground surface and more than 7.6 m (25 ft) below the gr

    Jan 1, 2011

  • SME
    Pitfalls In Air Sampling For Radioactive Particulates

    By L. H. Munson, D. E. Hadlock, L. F. Munson, R. L. Gilchrist, P. D. Robinson

    All uranium mills are required to perform sampling and analysis for radioactive particulates in their gaseous effluent streams and in the environment. Pacific Northwest Laboratory was requested by the

    Jan 1, 1981